Block 3116, lot 040
551 Monterey Blvd
- City’s use
- Multi-Family Residential
- Built
- 1978
- Stories
- 4
- Units
- 2
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 3,952 sq ft
- Lot
- 2,812 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2025 | Completed final sign-off Oct 2025 | 551 Monterey Bl | Speedy Restoration | mold was discovered in bathroom shower walls due to a supply line leak. all (3) shower walls need to be torn out, mold remediated and new shower area needs to be built from scratch. vanity and toilet to remain intact.Details
mold was discovered in bathroom shower walls due to a supply line leak. all (3) shower walls need to be torn out, mold remediated and new shower area needs to be built from scratch. vanity and toilet to remain intact. | $15,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2022 | 549 Monterey Bl | Dliu Construction | remodel extg bathroom, not move any wall at 1st floor.Details
remodel extg bathroom, not move any wall at 1st floor. | $10,000 |
| Nov 23, 2021 | Completed final sign-off Mar 2022 | 549 Monterey Bl | Dliu Construction | replace front windows with alum-clad wood windows in-kind per plans.new stucco to replace (e) vertical wood siding.Details
replace front windows with alum-clad wood windows in-kind per plans.new stucco to replace (e) vertical wood siding. | $5,000 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 549 Monterey Bl | Dliu Construction | kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof.Details
kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof. | $125,000 |
| Oct 3, 2020 | Completed final sign-off Dec 2021 | 551 Monterey Bl | Dliu Construction, Luzon Construction Mgmt | to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of buildingDetails
to comply w/ his n.o.v 201920821. stairs to be fixed. repair stairs at rear of building | $1,000 |
| Sep 4, 2020 | Completed final sign-off Mar 2021 | 551 Monterey Bl | Asap Roofing | to comply with nov 202019344 re-roofingDetails
to comply with nov 202019344 re-roofing | $18,000 |
| Feb 19, 2020 | Expired or cancelled cancelled Oct 2021 | 551 Monterey Bl | reroofingDetails
reroofing | $9,000 | |
| Feb 19, 2020 | Completed final sign-off Aug 2020 | 549 Monterey Bl | Raymond Peng Construction | 100 sf of exterior sisding at west side of building not visible in kind. unit 549, remove reinstall 50 sq ceiling drywall , 25+/- wall drywallDetails
100 sf of exterior sisding at west side of building not visible in kind. unit 549, remove reinstall 50 sq ceiling drywall , 25+/- wall drywall | $3,000 |
| Mar 27, 2019 | Completed final sign-off Dec 2021 | 551 Monterey Bl | Dliu Construction | provide handrails for rear stairway to comply with nov 201920821Details
provide handrails for rear stairway to comply with nov 201920821 | $4,000 |
| Nov 8, 2010 | Completed final sign-off Sep 2011 | 549 Monterey Bl | to comply with complaint # 201069828 to legalize rooms at ground floor and basement, restore (e) garage for two cars parkingDetails
to comply with complaint # 201069828 to legalize rooms at ground floor and basement, restore (e) garage for two cars parking | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dliu Construction (5), Asap Roofing, Luzon Construction Mgmt, Raymond Peng Construction, Speedy Restoration
- Engineers
- Ronald Yu (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.