Block 6920, lot 013
107 De Soto St
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 3,362 sq ft
- Lot
- 5,959 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2024 | Completed final sign-off Aug 2024 | 107 De Soto St | to obtain final inspection for work approved under pa# 201707051005. all work is complete.Details
to obtain final inspection for work approved under pa# 201707051005. all work is complete. | ||
| May 17, 2023 | Completed final sign-off Nov 2023 | 107 De Soto St | Swell Services Inc Dba Swell Contractors | advanced energy system: (1)tesla powewall 2ac battery system(5kww,13.5kwh)Details
advanced energy system: (1)tesla powewall 2ac battery system(5kww,13.5kwh) | $12,097 |
| Mar 12, 2020 | Expired or cancelled withdrawn Apr 2023 | 107 De Soto St | install 2 tesla power wall total 28kw. install tesla back up gate way,install 200 amp sub panel (backup load panel) install 200 amp sub panel(generation panel), install 7.2 kw roof mounted solar system.Details
install 2 tesla power wall total 28kw. install tesla back up gate way,install 200 amp sub panel (backup load panel) install 200 amp sub panel(generation panel), install 7.2 kw roof mounted solar system. | $23,321 | |
| Oct 17, 2018 | Expired or cancelled cancelled Dec 2021 | 107 De Soto St | two story addition along north side of houseDetails
two story addition along north side of house | $41,000 | |
| Jul 5, 2017 | Expired or cancelled expired Aug 2024 | 107 De Soto St | Teams General Roofing Inc | reroofingDetails
reroofing | $9,500 |
| May 22, 2017 | Completed final sign-off Jul 2024 | 107 De Soto St | Dliu Construction | revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair.Details
revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair. | $15,000 |
| Apr 26, 2017 | Completed final sign-off Jul 2024 | 107 De Soto St | Dliu Construction | 1st floor: legalize extg bathroom and 2 bedrooms, add a family room, a bedroom, a laundry room, and a full bath. 2nd floor: remodel kitchen and bathrooms.Details
1st floor: legalize extg bathroom and 2 bedrooms, add a family room, a bedroom, a laundry room, and a full bath. 2nd floor: remodel kitchen and bathrooms. | $80,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dliu Construction (2), Swell Services Inc Dba Swell Contractors, Teams General Roofing Inc
- Architects
- William K. Egan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.