Back to kitchen remodel contractors
Dlh Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2000 to Dec 2016
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Dec 2019 | 3550 Jackson St | kitchen & bath renovation. add insulation, new flooring, enlarge master bath, add new cabinetry, sink @ laundry. remodel bathrooms w/new fixtures & finishes. refinish (e) wood finsihes,(n) int paint, (n) kitchen cabinets,sink @ 1st fl. add (n) drop down attic ladder & roof hatch @ wardrobe@ 3rd fl.Details
kitchen & bath renovation. add insulation, new flooring, enlarge master bath, add new cabinetry, sink @ laundry. remodel bathrooms w/new fixtures & finishes. refinish (e) wood finsihes,(n) int paint, (n) kitchen cabinets,sink @ 1st fl. add (n) drop down attic ladder & roof hatch @ wardrobe@ 3rd fl. | $168,500 |
| Jan 7, 2008 | Completed final sign-off Apr 2008 | 2112 California St | unit 2112 only-kitchen remodel-demo (e)kitchen down to the bare studs &ceiling joists.enlarge (e)kitchen entryway-non landbearing-upgrade elec&plumb-insulate walls-5/8" sheetrock-new hardwood floor, new cabinets&countertops,hookup all finish elec&plumb. see architect drawings w/ this application.Details
unit 2112 only-kitchen remodel-demo (e)kitchen down to the bare studs &ceiling joists.enlarge (e)kitchen entryway-non landbearing-upgrade elec&plumb-insulate walls-5/8" sheetrock-new hardwood floor, new cabinets&countertops,hookup all finish elec&plumb. see architect drawings w/ this application. | $69,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 124 Scott St | kitchen remodel- remove & replace all kitchen cabinets, upgrade electrical & plumbing to kitchen only. sheetrock walls & ceiling, isntall new flooring, replace (e) appliances, install new countertops. (e) kitchen floor plan to remain the same.Details
kitchen remodel- remove & replace all kitchen cabinets, upgrade electrical & plumbing to kitchen only. sheetrock walls & ceiling, isntall new flooring, replace (e) appliances, install new countertops. (e) kitchen floor plan to remain the same. | $35,600 |