Back to bathroom remodel contractors
Dlh Construction
- Based in
- Novato
- On San Francisco permits
- Dec 2000 to Dec 2016
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 349 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2016 | Completed final sign-off Dec 2019 | 3550 Jackson St | kitchen & bath renovation. add insulation, new flooring, enlarge master bath, add new cabinetry, sink @ laundry. remodel bathrooms w/new fixtures & finishes. refinish (e) wood finsihes,(n) int paint, (n) kitchen cabinets,sink @ 1st fl. add (n) drop down attic ladder & roof hatch @ wardrobe@ 3rd fl.Details
kitchen & bath renovation. add insulation, new flooring, enlarge master bath, add new cabinetry, sink @ laundry. remodel bathrooms w/new fixtures & finishes. refinish (e) wood finsihes,(n) int paint, (n) kitchen cabinets,sink @ 1st fl. add (n) drop down attic ladder & roof hatch @ wardrobe@ 3rd fl. | $168,500 |
| May 8, 2008 | Completed final sign-off Aug 2008 | 2112 California St | master bath remodel, gut bath wall and ceiling to the e substructure. e window to remain. upgrade plumbing/elec. move an unstructural wall, new shower with shower pan and shower valve, relocate toilet and sink, insulate walls and ceiling. sheetrock, tape, texture, tile bath. repair hardwood floor.Details
master bath remodel, gut bath wall and ceiling to the e substructure. e window to remain. upgrade plumbing/elec. move an unstructural wall, new shower with shower pan and shower valve, relocate toilet and sink, insulate walls and ceiling. sheetrock, tape, texture, tile bath. repair hardwood floor. | $75,000 |
| Jul 21, 2004 | Completed final sign-off Jul 2005 | 2400 Fulton St | upgrade (e) elec on 2nd flr level, one bath, two bedrms, patch all hole sin walls at ceiling. removeDetails
upgrade (e) elec on 2nd flr level, one bath, two bedrms, patch all hole sin walls at ceiling. remove | $51,000 |