Division Sf Inc Dba: Hawke Bldg Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Jul 2026
- Last 24 months
- 3 permits filed
40 permits since 2000: 30 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 in progress. Typically 118 days from filing to permit and 715 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 4, 2025 | In progress issued Nov 2025 | 1318 York St | revision to pa #202212279198: discovered the existing garage slab and footings were unreinforced. existing area at entry foyer discovered to be wood framing over grade. scope added: garage slab, foundation scope, entry stair.Details
revision to pa #202212279198: discovered the existing garage slab and footings were unreinforced. existing area at entry foyer discovered to be wood framing over grade. scope added: garage slab, foundation scope, entry stair. | |
| Dec 23, 2019 | Completed final sign-off Nov 2022 | 3731 Jackson St | expansion under ground @ level 2, lowering of part of lvl 2 foundation, (n) windows @ rear of home, 1 (n) bathroom, replacement of (e) garden stair @ rear of home, (n) gate @ front of home.**to comply w/ maher ord# 155-13, route to health**Details
expansion under ground @ level 2, lowering of part of lvl 2 foundation, (n) windows @ rear of home, 1 (n) bathroom, replacement of (e) garden stair @ rear of home, (n) gate @ front of home.**to comply w/ maher ord# 155-13, route to health** | $300,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2024 | 346 San Benito Wy | replace (e) storage in the basement w/habitable space and relocate (e) bathroom. replace (e) stair w/(n) to be code compliant. remove (e) office and reconfigure (e) kitchen on 1st story. enlarge (e) half bathroom and reconfigure (e) full bath, update windows.Details
replace (e) storage in the basement w/habitable space and relocate (e) bathroom. replace (e) stair w/(n) to be code compliant. remove (e) office and reconfigure (e) kitchen on 1st story. enlarge (e) half bathroom and reconfigure (e) full bath, update windows. | $95,000 |
| Jan 18, 2018 | Completed final sign-off Nov 2019 | 484 Sanchez St | revision to pa 2015-0908-6388, replace (e4) dry rot wood stair @ exterior entry w/ cone & stone tile treads risers. revise front yard fence 42" - 48" height & add bollards.Details
revision to pa 2015-0908-6388, replace (e4) dry rot wood stair @ exterior entry w/ cone & stone tile treads risers. revise front yard fence 42" - 48" height & add bollards. | $20,000 |
| Sep 8, 2015 | Completed final sign-off Nov 2019 | 484 Sanchez St | relocate dwelling to ground (n) foundations-lower bottom floor 30"; construct (n) unit kitchen, full bath & bedroom, (n) electrical reconfiguration; kitchen addition @ 2nd floor, 3rd floor - (n) bath & rear yard deck/stairDetails
relocate dwelling to ground (n) foundations-lower bottom floor 30"; construct (n) unit kitchen, full bath & bedroom, (n) electrical reconfiguration; kitchen addition @ 2nd floor, 3rd floor - (n) bath & rear yard deck/stair | $450,000 |
| Jun 18, 2013 | Completed final sign-off Jul 2013 | 3537 21st St | scope included new stairs and rail on deck. deck will now remain as is, no new stair, no new railDetails
scope included new stairs and rail on deck. deck will now remain as is, no new stair, no new rail |