Back to bathroom remodel contractors
Division Sf Inc Dba: Hawke Bldg Company
- Based in
- San Francisco
- On San Francisco permits
- Jan 2011 to Jul 2026
- Last 24 months
- 3 permits filed
40 permits since 2000: 30 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 9 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 31 days from filing to permit and 715 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Aug 2026 | 1306 York St | mep includes (n) heat pump, lighting, electrical, electrical, plumbing. install wsher dryer hookup on 3rd fl, new bathroom on 3rd floor. raise primary 3rd floor bedroom ceiling from 8'4"-9'. new skylightsDetails
mep includes (n) heat pump, lighting, electrical, electrical, plumbing. install wsher dryer hookup on 3rd fl, new bathroom on 3rd floor. raise primary 3rd floor bedroom ceiling from 8'4"-9'. new skylights | $195,000 |
| Sep 24, 2021 | Completed final sign-off Feb 2024 | 346 San Benito Wy | revision to pa 201911207717. replace a portion of the (e) garage space in the basement with habitable space, skylight added to foyer, reconfiguration of bathroom and kitchen layouts, and replace guardrail at entry.Details
revision to pa 201911207717. replace a portion of the (e) garage space in the basement with habitable space, skylight added to foyer, reconfiguration of bathroom and kitchen layouts, and replace guardrail at entry. | |
| Dec 23, 2019 | Completed final sign-off Nov 2022 | 3731 Jackson St | expansion under ground @ level 2, lowering of part of lvl 2 foundation, (n) windows @ rear of home, 1 (n) bathroom, replacement of (e) garden stair @ rear of home, (n) gate @ front of home.**to comply w/ maher ord# 155-13, route to health**Details
expansion under ground @ level 2, lowering of part of lvl 2 foundation, (n) windows @ rear of home, 1 (n) bathroom, replacement of (e) garden stair @ rear of home, (n) gate @ front of home.**to comply w/ maher ord# 155-13, route to health** | $300,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2024 | 346 San Benito Wy | replace (e) storage in the basement w/habitable space and relocate (e) bathroom. replace (e) stair w/(n) to be code compliant. remove (e) office and reconfigure (e) kitchen on 1st story. enlarge (e) half bathroom and reconfigure (e) full bath, update windows.Details
replace (e) storage in the basement w/habitable space and relocate (e) bathroom. replace (e) stair w/(n) to be code compliant. remove (e) office and reconfigure (e) kitchen on 1st story. enlarge (e) half bathroom and reconfigure (e) full bath, update windows. | $95,000 |
| Oct 30, 2019 | Expired or cancelled cancelled Nov 2020 | 3731 Jackson St | removal of finishes on lower floor bathroom, replace in kind. removal of dry wall on lower floor for repair, replace in kind.Details
removal of finishes on lower floor bathroom, replace in kind. removal of dry wall on lower floor for repair, replace in kind. | $15,000 |
| Jun 24, 2016 | Completed final sign-off Oct 2018 | 605 Elizabeth St | horizontal addition. 320 sq ft 2-story addition @ rear of bldg converting 457 sq ft of (e) garage into habitable space. (1) bedroom & (1) bath to be added. (e) kitchen remodel.new play area on ground level.Details
horizontal addition. 320 sq ft 2-story addition @ rear of bldg converting 457 sq ft of (e) garage into habitable space. (1) bedroom & (1) bath to be added. (e) kitchen remodel.new play area on ground level. | $139,000 |
| Sep 8, 2015 | Completed final sign-off Nov 2019 | 484 Sanchez St | relocate dwelling to ground (n) foundations-lower bottom floor 30"; construct (n) unit kitchen, full bath & bedroom, (n) electrical reconfiguration; kitchen addition @ 2nd floor, 3rd floor - (n) bath & rear yard deck/stairDetails
relocate dwelling to ground (n) foundations-lower bottom floor 30"; construct (n) unit kitchen, full bath & bedroom, (n) electrical reconfiguration; kitchen addition @ 2nd floor, 3rd floor - (n) bath & rear yard deck/stair | $450,000 |
| Sep 18, 2013 | Never finaled issued Dec 2013, no final | 190 Mersey St | remodel of (e) bathroom at 2nd floor. replace all fixtures & finishesDetails
remodel of (e) bathroom at 2nd floor. replace all fixtures & finishes | $30,000 |
| Nov 1, 2012 | Completed final sign-off Aug 2015 | 566 Dellbrook Av | renovation of existing garage & storage area to accomodate 1 bedroom & 1 bath + entry vestibule.Details
renovation of existing garage & storage area to accomodate 1 bedroom & 1 bath + entry vestibule. | $12,000 |
| Jul 17, 2012 | Expired or cancelled expired Dec 2014 | 2519 Pacific Av | demo tile, install re-heat & new tile, new shower pan, no walls moved, new plumbing faucet fixtures at existing location. work in master bath (shower only) & kitchen (no sink or cabinet) only. no new lighting work under this permit.Details
demo tile, install re-heat & new tile, new shower pan, no walls moved, new plumbing faucet fixtures at existing location. work in master bath (shower only) & kitchen (no sink or cabinet) only. no new lighting work under this permit. | $15,000 |
| Jan 18, 2011 | Completed final sign-off Sep 2011 | 486 Sanchez St | install (n) foundation @ rear of house. open walls for (n) common supports grade to 3rd. story. construct (n) bath pantry area. remodel kitchen, install (n) windows, replace elect. outlets & install (n) gfic outlets. all work per plans.Details
install (n) foundation @ rear of house. open walls for (n) common supports grade to 3rd. story. construct (n) bath pantry area. remodel kitchen, install (n) windows, replace elect. outlets & install (n) gfic outlets. all work per plans. | $50,000 |
| Jan 4, 2011 | Completed final sign-off Sep 2011 | 250 Alma St | kitchen/bath, no moving of structural walls (4) window replacements, new electrical/plumbing/heater. windows are same size and location not visible from street uz.4Details
kitchen/bath, no moving of structural walls (4) window replacements, new electrical/plumbing/heater. windows are same size and location not visible from street uz.4 | $50,000 |
| Jan 4, 2011 | Completed final sign-off Nov 2011 | 248 Alma St | kitchen, bath remodel, new electrical, plumbing, heater, 4 window replacements, no moving walls, window same size and location not visible from street, u=.4Details
kitchen, bath remodel, new electrical, plumbing, heater, 4 window replacements, no moving walls, window same size and location not visible from street, u=.4 | $50,000 |