Di Vine Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Sep 2026
- Last 24 months
- 12 permits filed
92 permits since 2000: 78 completed, 5 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 9 completed, 1 expired or cancelled. Typically 15 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Completed final sign-off Jun 2023 | 2767 Bryant St | replace (e) rear egress stair in-kind per sfbc 1011.12.3Details
replace (e) rear egress stair in-kind per sfbc 1011.12.3 | $25,000 |
| Aug 11, 2021 | Completed final sign-off Feb 2025 | 2616 Sutter St | front bldg: 1) 3 windows replace in-kind at front facade. 2)replace building front facade finish material from stucco to hardie board siding. 3) new canopy at front main entrance, 4) rear deck and stairs replace in-kind.Details
front bldg: 1) 3 windows replace in-kind at front facade. 2)replace building front facade finish material from stucco to hardie board siding. 3) new canopy at front main entrance, 4) rear deck and stairs replace in-kind. | $50,000 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 635 08th Av | replace 2nd exit stair at light court in kindDetails
replace 2nd exit stair at light court in kind | $20,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2018 | 1958 Larkin St | to comply wiht nov# 201876441. repair stairs less than 50%. repair in kind. all work at the rear.Details
to comply wiht nov# 201876441. repair stairs less than 50%. repair in kind. all work at the rear. | $5,000 |
| Sep 26, 2017 | Completed final sign-off Aug 2026 | 906 Vallejo St | roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairsDetails
roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairs | $75,000 |
| Aug 10, 2016 | Completed final sign-off Apr 2017 | 18 Marsilly St | new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closetDetails
new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closet | $100,000 |
| Jul 6, 2012 | Completed final sign-off Oct 2012 | 2871 22nd St | repair in kind stairs in front of the house, less than 50%Details
repair in kind stairs in front of the house, less than 50% | $4,000 |
| Jul 6, 2012 | Expired or cancelled cancelled Jul 2012 | 242 10th Av | repair in kind stairs in front of the house, less than 50%Details
repair in kind stairs in front of the house, less than 50% | $2,000 |
| Oct 4, 2011 | Completed final sign-off Mar 2013 | 143 10th Av | install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kindDetails
install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kind | $38,000 |
| Dec 3, 2007 | Completed final sign-off Feb 2008 | 2770 Sacramento St | replace in kind front stairs.Details
replace in kind front stairs. | $20,000 |