Back to bathroom remodel contractors
Di Vine Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Sep 2026
- Last 24 months
- 12 permits filed
92 permits since 2000: 78 completed, 5 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 24 completed, 2 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 2609 Sutter St | unit 3: remodel 2 bathrooms and 1 kitchen like for like. install new insulation in walls in living room, kitchen, dining room, and bathrooms. all work interior. add new subpanel, replace fixtures in kind.Details
unit 3: remodel 2 bathrooms and 1 kitchen like for like. install new insulation in walls in living room, kitchen, dining room, and bathrooms. all work interior. add new subpanel, replace fixtures in kind. | $80,000 |
| May 27, 2026 | Expired or cancelled cancelled Jun 2026 | 420 Bay St | replace 3 vanity and medicine cabinet in 3 bathroomsDetails
replace 3 vanity and medicine cabinet in 3 bathrooms | $3,000 |
| Feb 4, 2026 | Completed final sign-off Jul 2026 | 66 07th Av | remodel bathroom in kind no wall removal or layout change. tub to tub change.Details
remodel bathroom in kind no wall removal or layout change. tub to tub change. | $15,000 |
| Dec 8, 2025 | In progress issued Dec 2025 | 111 Buena Vista Ave East Av | unit #2: remodel bathroom in kind 7ft x 8ft ( no change to layout.)Details
unit #2: remodel bathroom in kind 7ft x 8ft ( no change to layout.) | $15,000 |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 2275 15th St | convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr.Details
convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr. | $30,000 |
| Oct 19, 2022 | Completed final sign-off Feb 2023 | 70 Terrace Dr | remodel bathroom iin kind. no removal of wallsDetails
remodel bathroom iin kind. no removal of walls | $20,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2022 | 131 10th Av | voluntary remove unpermitted bathroom in (e) storage on roof flDetails
voluntary remove unpermitted bathroom in (e) storage on roof fl | $2,000 |
| Apr 27, 2021 | Completed final sign-off Mar 2022 | 1265 02nd Av | #2: 3rd floor: 1)remodel 2 bathrooms. 2)kitchen remodel. 3)remove walls between kitchen and dining/living room.Details
#2: 3rd floor: 1)remodel 2 bathrooms. 2)kitchen remodel. 3)remove walls between kitchen and dining/living room. | $50,000 |
| Apr 7, 2021 | Completed final sign-off Mar 2022 | 2078 31st Av | 2nd floor : (1) bathroom remodel (2) new closet for (e) bedroom to accomodate one (n) 3-fixture bathroom. (3) new skylightsDetails
2nd floor : (1) bathroom remodel (2) new closet for (e) bedroom to accomodate one (n) 3-fixture bathroom. (3) new skylights | $40,000 |
| Jan 27, 2021 | Never finaled issued Jan 2021, no final | 553 Sanchez St | bathroom remodel in kindDetails
bathroom remodel in kind | $8,000 |
| Oct 27, 2020 | Completed final sign-off May 2024 | 19 Walter St | interior remodel: 1st floor - infill lightwell on south side. create interior stairase to 2nd flr. add family room, master bedroom, & one 4 fixture bathroom. 2nd flr: infill lightwell on south side. relocate the existing kitchen, dining room, living room. remodel existing 2 bedrooms.Details
interior remodel: 1st floor - infill lightwell on south side. create interior stairase to 2nd flr. add family room, master bedroom, & one 4 fixture bathroom. 2nd flr: infill lightwell on south side. relocate the existing kitchen, dining room, living room. remodel existing 2 bedrooms. | $75,000 |
| Oct 8, 2020 | Completed final sign-off Oct 2021 | 645 Velasco Av | a.d.u. on 1st floor per ordinance 162-16 include add one kitchen, living room, one 3-fixture bathroom and two bedroomsDetails
a.d.u. on 1st floor per ordinance 162-16 include add one kitchen, living room, one 3-fixture bathroom and two bedrooms | $20,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2022 | 224 17th Av | remodel in kind kitchen, full bathroom and half bathroom. replace 6 windows in kind in rear of house not visible from street. install hardi board siding in rear over e sidingDetails
remodel in kind kitchen, full bathroom and half bathroom. replace 6 windows in kind in rear of house not visible from street. install hardi board siding in rear over e siding | $35,000 |
| Jun 22, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind.Details
one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind. | $5,000 |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 130 23rd Av | unit 2: remodel in-kind: full bathroom, 1/2 bathroom. replace kitchen counter top, cainbets to stay. replce kitchen sink.Details
unit 2: remodel in-kind: full bathroom, 1/2 bathroom. replace kitchen counter top, cainbets to stay. replce kitchen sink. | $12,000 |
| Jan 25, 2019 | Completed final sign-off Apr 2019 | 706 Foerster St | remodel full bathroom in kind.Details
remodel full bathroom in kind. | $15,000 |
| Oct 1, 2018 | Completed final sign-off Dec 2018 | 117 10th Av | install new tile in master bathroom shower. remove existing tile and replace in-kind.Details
install new tile in master bathroom shower. remove existing tile and replace in-kind. | $8,000 |
| Feb 7, 2018 | Completed final sign-off Jul 2018 | 239 Edinburgh St | 1st floor - add a powder, laundry room per plan; replace partial foundation per plan; 2nd floor - add powder room per plan. remodel (e) full bath & kitchen per plan. new deckDetails
1st floor - add a powder, laundry room per plan; replace partial foundation per plan; 2nd floor - add powder room per plan. remodel (e) full bath & kitchen per plan. new deck | $30,000 |
| Dec 14, 2017 | Completed final sign-off Jun 2019 | 420 Burrows St | add a bathroom, laundry room, media room, retreat & office on 1st floor per plan.Details
add a bathroom, laundry room, media room, retreat & office on 1st floor per plan. | $40,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 229 17th Av | remodel in kind (1) kitchen and (1-1/2) bathroomsDetails
remodel in kind (1) kitchen and (1-1/2) bathrooms | $25,000 |
| Jul 13, 2017 | Completed final sign-off Oct 2017 | 758 44th Av | remodel full bathroom in kind @ upper unit.Details
remodel full bathroom in kind @ upper unit. | $19,000 |
| Aug 10, 2016 | Completed final sign-off Apr 2017 | 18 Marsilly St | new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closetDetails
new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closet | $100,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 2861 Washington St | remodel 2-1/2 bathroom in-kind.Details
remodel 2-1/2 bathroom in-kind. | $30,000 |
| Feb 2, 2016 | Completed final sign-off Jul 2016 | 2208 Mission St | remodel in-kind 1 full bathroom.Details
remodel in-kind 1 full bathroom. | $8,000 |
| May 1, 2015 | Completed final sign-off Jan 2016 | 349 Teresita Bl | bathroom remodel at 1st and 2nd floor: replace fixtures, bath fan, add heater, electrical, wall & floor tiles, replace door. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel at 1st and 2nd floor: replace fixtures, bath fan, add heater, electrical, wall & floor tiles, replace door. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $30,000 |
| Oct 27, 2014 | Completed final sign-off Feb 2015 | 451 Crestmont Dr | remodel in kind two full bathrooms, 1 bathroom 7'x11', 2nd bathroom 8'x7'Details
remodel in kind two full bathrooms, 1 bathroom 7'x11', 2nd bathroom 8'x7' | $12,000 |
| Mar 7, 2014 | Completed final sign-off Sep 2014 | 675 28th Av | legalize 1/2 bath in 1/f, remodel 2 (e) kitchens and 2 (e) baths, add 1 closet at each unit. voluntary structural and seismic upgrade and new partitions walls for storage on 1/f. replace (e) windows, 9 vinyl windows at rear & 10 wood windows at front. convert dining room to bedroom at 2nd & 3rd fl.Details
legalize 1/2 bath in 1/f, remodel 2 (e) kitchens and 2 (e) baths, add 1 closet at each unit. voluntary structural and seismic upgrade and new partitions walls for storage on 1/f. replace (e) windows, 9 vinyl windows at rear & 10 wood windows at front. convert dining room to bedroom at 2nd & 3rd fl. | $60,000 |
| Feb 10, 2012 | Completed final sign-off Apr 2013 | 145 10th Av | replace kitchen cabinets & redo 1 full bath.Details
replace kitchen cabinets & redo 1 full bath. | $36,000 |
| Oct 4, 2011 | Completed final sign-off Mar 2013 | 143 10th Av | install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kindDetails
install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kind | $38,000 |
| Mar 28, 2011 | Expired or cancelled cancelled Apr 2012 | 143 10th Av | replace 1 kitchen cabinet and redo 1 full bath. new lighting to comply with cec150(k), no change to int. doors or walls. 1 window in kind @ rear porch, 1 door replacement in kind @ portch.Details
replace 1 kitchen cabinet and redo 1 full bath. new lighting to comply with cec150(k), no change to int. doors or walls. 1 window in kind @ rear porch, 1 door replacement in kind @ portch. | $36,000 |