Back to kitchen remodel contractors
Di Build Llc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2021 to May 2026
- Last 24 months
- 3 permits filed
15 permits since 2000: 11 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2026 | Completed final sign-off Sep 2026 | 206 Bosworth St | unit 2- revision 202511189855- to switch kitchen from one side to the other to include (n) cabinets, outlets, switches, sink and lighting.Details
unit 2- revision 202511189855- to switch kitchen from one side to the other to include (n) cabinets, outlets, switches, sink and lighting. | $47,583 |
| Nov 18, 2025 | Completed final sign-off Sep 2026 | 206 Bosworth St | like for like kitchen remodel. no wall changes. no change to floor layout. no change to wall layout. no structural work.Details
like for like kitchen remodel. no wall changes. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Jun 16, 2022 | Completed final sign-off Sep 2022 | 155 San Leandro Wy | drywall, flooring, and kitchen counters repair. no change to layout. work in kitchen.Details
drywall, flooring, and kitchen counters repair. no change to layout. work in kitchen. | $10,000 |
| Feb 16, 2022 | Completed final sign-off Dec 2023 | 431 Hoffman Av | remodel 2 kitchen, 2 bathrooms. repair interior walls. install new furnaces and new water heaters, new insulation. reinforce floor. revision to no-plan permit 202110291435.Details
remodel 2 kitchen, 2 bathrooms. repair interior walls. install new furnaces and new water heaters, new insulation. reinforce floor. revision to no-plan permit 202110291435. | $350,000 |
| Oct 29, 2021 | Never finaled issued Oct 2021, no final | 433 Hoffman Av | one like for like kitchen remodel, new cabinets, new appliances, one like for like bathroom remodel, new shower tile, toilet vanity.Details
one like for like kitchen remodel, new cabinets, new appliances, one like for like bathroom remodel, new shower tile, toilet vanity. | $40,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2023 | 431 Hoffman Av | like for like one kitchen remodel. new counters, new cabinets, new appliances, like for like one bathroom, new shower, tile, toilet, vanity. non structuralDetails
like for like one kitchen remodel. new counters, new cabinets, new appliances, like for like one bathroom, new shower, tile, toilet, vanity. non structural | $40,000 |