Back to bathroom remodel contractors
Di Build Llc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2021 to May 2026
- Last 24 months
- 3 permits filed
15 permits since 2000: 11 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 365 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2026 | In progress filed May 2026, not yet issued | 1619 43rd Av | partial garage conversion to habitable space with bedroom and sitting area, office and bathroom. maintain 20' deep garage. construct new deck off the primary bedroom on the main floor. replace (e) single pane aluminum windows @ rear on main flr with fiberglass egress windows.Details
partial garage conversion to habitable space with bedroom and sitting area, office and bathroom. maintain 20' deep garage. construct new deck off the primary bedroom on the main floor. replace (e) single pane aluminum windows @ rear on main flr with fiberglass egress windows. | $120,000 |
| Mar 20, 2024 | Completed final sign-off Jun 2024 | 1211 26th Av | master bathroom remodel- like for like; no wall removal; - seperate mep permits will need to be obtainedDetails
master bathroom remodel- like for like; no wall removal; - seperate mep permits will need to be obtained | $6,500 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 26 Atalaya Tr | bathroom remodel like for like, new vanity, toilet, tub and shower tileDetails
bathroom remodel like for like, new vanity, toilet, tub and shower tile | $8,000 |
| Feb 16, 2022 | Completed final sign-off Dec 2023 | 431 Hoffman Av | remodel 2 kitchen, 2 bathrooms. repair interior walls. install new furnaces and new water heaters, new insulation. reinforce floor. revision to no-plan permit 202110291435.Details
remodel 2 kitchen, 2 bathrooms. repair interior walls. install new furnaces and new water heaters, new insulation. reinforce floor. revision to no-plan permit 202110291435. | $350,000 |
| Oct 29, 2021 | Never finaled issued Oct 2021, no final | 433 Hoffman Av | one like for like kitchen remodel, new cabinets, new appliances, one like for like bathroom remodel, new shower tile, toilet vanity.Details
one like for like kitchen remodel, new cabinets, new appliances, one like for like bathroom remodel, new shower tile, toilet vanity. | $40,000 |
| Oct 26, 2021 | Completed final sign-off Dec 2023 | 431 Hoffman Av | like for like one kitchen remodel. new counters, new cabinets, new appliances, like for like one bathroom, new shower, tile, toilet, vanity. non structuralDetails
like for like one kitchen remodel. new counters, new cabinets, new appliances, like for like one bathroom, new shower, tile, toilet, vanity. non structural | $40,000 |