Back to pergola or trellis contractors
Devlin/Mcnally Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2026
- Last 24 months
- 13 permits filed
188 permits since 2000: 137 completed, 11 in progress, 24 never finaled, 16 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
2 pergola or trellis permits: 1 completed, 1 never finaled. Typically 482 days from filing to permit and 19 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2019 | Never finaled issued Apr 2022, no final | 42 Clipper St | renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc.Details
renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc. | $750,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 848 Bay St | revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded.Details
revision to pa #201602099116-s1: elevatpr shaft at roof has increase from 9'-6" to 10'-6" above roof due to elevator equipment. glass canopy at stair trellis is being replaced with new glass. (e) lighting at roof deck is being upgraded to led. (e) outdoor case work is being replaced/ expanded. | $20,000 |