Back to bathroom remodel contractors
Devlin/Mcnally Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Aug 2026
- Last 24 months
- 13 permits filed
188 permits since 2000: 137 completed, 11 in progress, 24 never finaled, 16 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 35 completed, 1 in progress, 4 never finaled. Typically 0 days from filing to permit and 235 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2026 | In progress issued Apr 2026 | 346 01st St | unit 302: remodel 1 bathroom like for like, replace finishes and fixtures, same size and location. no change of use.Details
unit 302: remodel 1 bathroom like for like, replace finishes and fixtures, same size and location. no change of use. | $10,000 |
| Sep 26, 2025 | Completed final sign-off Jul 2026 | 3951 26th St | replace all cabinets, fixtures, finishes & appliances in kitchen and bathroom. remodel in kind. no change to layout or use. like for like remodel.Details
replace all cabinets, fixtures, finishes & appliances in kitchen and bathroom. remodel in kind. no change to layout or use. like for like remodel. | $60,000 |
| May 15, 2025 | Completed final sign-off Feb 2026 | 31 Romain St | demo e bathroom closet and bedroom at ground fl. extend gr floor and reonvate for a master bedroom suite with closet and bath and a new bedroom. deck to extend above over horizontal expansion.Details
demo e bathroom closet and bedroom at ground fl. extend gr floor and reonvate for a master bedroom suite with closet and bath and a new bedroom. deck to extend above over horizontal expansion. | $125,000 |
| Mar 18, 2025 | Completed final sign-off Jan 2026 | 734 Ashbury St | unit a: remodel in kind (1) kitchen, (1) bathroom, (1) powder room. replace all finishes and fixtures in same locations. no change of use. no change to wall layout. no change to floor layout. no structural work. no replacement of sheetrock.Details
unit a: remodel in kind (1) kitchen, (1) bathroom, (1) powder room. replace all finishes and fixtures in same locations. no change of use. no change to wall layout. no change to floor layout. no structural work. no replacement of sheetrock. | $50,000 |
| Dec 26, 2024 | Completed final sign-off Oct 2025 | 1435 Lyon St | interior remodel- relocate kitchen to dining. add bedrrom. remodel 3rd fl bathroom no change to exterior envelopeDetails
interior remodel- relocate kitchen to dining. add bedrrom. remodel 3rd fl bathroom no change to exterior envelope | $60,000 |
| Dec 18, 2023 | Completed final sign-off Mar 2025 | 370 De Haro St | #8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings.Details
#8: interior remodel of extg loft consisting of this remodel of the kitchen, 2 bathrooms, the relocation of the interior stair and a partial of the loft area as well as various buildings. | $250,000 |
| Dec 14, 2021 | Completed final sign-off Dec 2023 | 320 Liberty St | remodel 2nd floor, capture pear of garage space for bed/bath. repair front windows, relocate and replace rear openings, roof skylights, resurface exterior surfaces. no envelope expansion.Details
remodel 2nd floor, capture pear of garage space for bed/bath. repair front windows, relocate and replace rear openings, roof skylights, resurface exterior surfaces. no envelope expansion. | $180,000 |
| Sep 27, 2021 | Completed final sign-off Apr 2022 | 1170 Sacramento St | remodel 2 existing bathrooms, replace finishes, fixtures in kind in same locations. no change of use.Details
remodel 2 existing bathrooms, replace finishes, fixtures in kind in same locations. no change of use. | $5,000 |
| Jul 21, 2021 | Completed final sign-off Sep 2022 | 185 Beacon St | existing bath remodel. replace fixtures and finishes in kind.Details
existing bath remodel. replace fixtures and finishes in kind. | $15,000 |
| Jan 22, 2019 | Completed final sign-off Nov 2019 | 73 Waltham St | remodel (e) kitchen & (e) bathroom (1). remove/replace in-kind (e) fixtures & finishes in same locatiopn. no change on walls.Details
remodel (e) kitchen & (e) bathroom (1). remove/replace in-kind (e) fixtures & finishes in same locatiopn. no change on walls. | $50,000 |
| Aug 20, 2018 | Completed final sign-off Nov 2022 | 34 Gladys St | reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck.Details
reconfiguration on (3) levels to add bathroom @ upper & lower level, kitchen & bath renovation @ main level. rebuild (e) decks @ rear w/ firewalls. raise roof @ upper level & (n) upper level deck. | $600,000 |
| Aug 15, 2018 | Completed final sign-off Nov 2021 | 2148 Steiner St | horizontal 2-story addition @ rear side of (e) residence. floor 1: remodel kitchen, fam/dining. add powder rm, remodel guest rm & bath. floor 2: remodel master bdrm & bath, shared bath & vanity rm.Details
horizontal 2-story addition @ rear side of (e) residence. floor 1: remodel kitchen, fam/dining. add powder rm, remodel guest rm & bath. floor 2: remodel master bdrm & bath, shared bath & vanity rm. | $150,000 |
| Jul 2, 2018 | Completed final sign-off Mar 2021 | 130 Newman St | renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck.Details
renovate (e) attic, adding (n) stair, master bath & skylights. build (n) first flr guest suite & laundry inside garage & under (e) dining room & deck. renovate (e) second flr dining room & deck. | $435,000 |
| Apr 9, 2018 | Completed final sign-off Aug 2018 | 67 Ord St | in-kind one bathroom renodel,m no change in walls and opening layoutDetails
in-kind one bathroom renodel,m no change in walls and opening layout | $25,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2019 | 609 Elizabeth St | 1st floor - convert portion of (e) garage into future office (under pa 201610059566), add 1 bathroom, add (n) interior stair to 2nd floor; 2nd floor - renovate (e) kitchen. remove dining room wall; 3rd floor - 2 (n) windows @ rear facade. general plumbing & electrical work as required throughoutDetails
1st floor - convert portion of (e) garage into future office (under pa 201610059566), add 1 bathroom, add (n) interior stair to 2nd floor; 2nd floor - renovate (e) kitchen. remove dining room wall; 3rd floor - 2 (n) windows @ rear facade. general plumbing & electrical work as required throughout | $50,000 |
| Jun 3, 2016 | Completed final sign-off Jun 2016 | 425 Douglass St | new 1/2 bath serving rear yard at sub level storage level. new storage closet no exterior wrokDetails
new 1/2 bath serving rear yard at sub level storage level. new storage closet no exterior wrok | $1,500 |
| May 27, 2016 | Completed final sign-off Dec 2016 | 127 Lake St | renovations to 2nd floor baths & kitchenDetails
renovations to 2nd floor baths & kitchen | $43,991 |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 1822 36th Av | interior renovation - 1st floor build out (e) grd flr storage area to include (n) bedroom (n) den, (n) bath, (n) windows & doors. 2nd floor - renovate (e) bathroom, remove (e) closet, plumbing & electrical work at both floors as req. no structural workDetails
interior renovation - 1st floor build out (e) grd flr storage area to include (n) bedroom (n) den, (n) bath, (n) windows & doors. 2nd floor - renovate (e) bathroom, remove (e) closet, plumbing & electrical work at both floors as req. no structural work | $75,000 |
| Feb 23, 2016 | Completed final sign-off Mar 2024 | 357 Day St | horizontal addition. interior renovation. add (2) bedroom & (2) bathrooms in the basement, 1st & 2nd floors.Details
horizontal addition. interior renovation. add (2) bedroom & (2) bathrooms in the basement, 1st & 2nd floors. | $450,000 |
| Nov 17, 2015 | Completed final sign-off May 2018 | 4345 Cesar Chavez St | horizontal addition & remodel.add new 2nd story over garage at frt facade&continuation to the rear.new mstr suite, new bedroom,new playroom,laundry area & new bathroom.remodel main floor bathroom&add a half bath on the lower floor.Details
horizontal addition & remodel.add new 2nd story over garage at frt facade&continuation to the rear.new mstr suite, new bedroom,new playroom,laundry area & new bathroom.remodel main floor bathroom&add a half bath on the lower floor. | $250,000 |
| Jun 3, 2015 | Completed final sign-off May 2016 | 461 02nd St | #457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinanceDetails
#457 - interior remodel - renovated bathrooms & kitchen. new finsihes throughout, relocate stair & electrical outlets throughout. relocate sprinklers under separate permit. n/a maher ordinance | $75,000 |
| May 27, 2015 | Completed final sign-off Jun 2016 | 50 Hopkins Av | remodel (2) existing bathrooms & (1) kitchen in kind, remove and replace (e) fixtures and finishes, replace in same location.Details
remodel (2) existing bathrooms & (1) kitchen in kind, remove and replace (e) fixtures and finishes, replace in same location. | $30,000 |
| May 27, 2015 | Completed final sign-off Sep 2015 | 1054 Haight St | rear bldg - remodel (1) existing bathroom in kind, remove & replace existing fixtures and finishes in same location.Details
rear bldg - remodel (1) existing bathroom in kind, remove & replace existing fixtures and finishes in same location. | $9,000 |
| Feb 17, 2015 | Completed final sign-off Mar 2015 | 4042 23rd St | addition of 1 (21-1/2" x 27-3/8" velux skylight into an exisitng bathroom. it will be set back 5'6" from the property line not visible from the street. u value max. .32Details
addition of 1 (21-1/2" x 27-3/8" velux skylight into an exisitng bathroom. it will be set back 5'6" from the property line not visible from the street. u value max. .32 | $2,500 |
| Jan 6, 2015 | Completed final sign-off Apr 2015 | 253 Rose St | remodel existing bath in kind upper unit. remove & replace exisitng fixtures + finish w/same locations, no change. no walls moved, removed or added. all layouts to remain unchanged. n/a maher ordinanceDetails
remodel existing bath in kind upper unit. remove & replace exisitng fixtures + finish w/same locations, no change. no walls moved, removed or added. all layouts to remain unchanged. n/a maher ordinance | $10,000 |
| Oct 17, 2014 | Completed final sign-off Jan 2019 | 4276 26th St | horizontal & vertical addition. complete interior renovations, new habitable area at (e) 1st floor. new horizontal rear yard addition at existing 1st & 2nd floors, new vertical 3rd floor addition. three bedrooms, three & a half baths.Details
horizontal & vertical addition. complete interior renovations, new habitable area at (e) 1st floor. new horizontal rear yard addition at existing 1st & 2nd floors, new vertical 3rd floor addition. three bedrooms, three & a half baths. | $400,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 631 O'farrell St | remodel existing bathroom and kitchen in kind. replace existing finishes and fixtures in same location. no change of useDetails
remodel existing bathroom and kitchen in kind. replace existing finishes and fixtures in same location. no change of use | $25,000 |
| Jan 10, 2014 | Completed final sign-off Jul 2014 | 609 Elizabeth St | revision to 201312033245, add 1 new bathroom to 2nd fl, 1 closet to e bedroom, renovate e bedroom, new electrical/plumbing work as requiredDetails
revision to 201312033245, add 1 new bathroom to 2nd fl, 1 closet to e bedroom, renovate e bedroom, new electrical/plumbing work as required | $14,000 |
| Dec 3, 2013 | Completed final sign-off Jul 2014 | 609 Elizabeth St | remodel existing bathroom in kind, replace all existing finishes, fixtures in the same location, bathroom lighting - high efficacy or controlled by manual on sensors. no change of use.Details
remodel existing bathroom in kind, replace all existing finishes, fixtures in the same location, bathroom lighting - high efficacy or controlled by manual on sensors. no change of use. | $10,000 |
| Nov 18, 2013 | Completed final sign-off Mar 2014 | 1 Daniel Burnham Ct | remodel bathroom and kitchen replace finishes and fixtures in same locations; to comply with cec150(k) 8 & 10 no change of useDetails
remodel bathroom and kitchen replace finishes and fixtures in same locations; to comply with cec150(k) 8 & 10 no change of use | $15,000 |
| Oct 28, 2013 | Completed final sign-off Mar 2014 | 229 Brannan St | work in unit 17j only: bathroom, new fixtures, floor, tiel, cabinets.Details
work in unit 17j only: bathroom, new fixtures, floor, tiel, cabinets. | $15,000 |
| Oct 24, 2013 | Completed final sign-off Mar 2014 | 1118 Hampshire St | interior remodel of 4 unit apartments bldg including :kitchens, baths, electrical and plumbing. extg utility porches to be converted to breakfast rooms with new openings in load bearing walls. partial structural strenthening with new shear walls.Details
interior remodel of 4 unit apartments bldg including :kitchens, baths, electrical and plumbing. extg utility porches to be converted to breakfast rooms with new openings in load bearing walls. partial structural strenthening with new shear walls. | $150,000 |
| Sep 23, 2013 | Never finaled issued Sep 2013, no final | 1925 Gough St | remodel (e) bathroom in kind. replace finishes & fixtures in the same place. no change of useDetails
remodel (e) bathroom in kind. replace finishes & fixtures in the same place. no change of use | $9,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2013 | 730 Castro St | remodel existing kitchen abd bathroom in kind, remove and replace existing finishes and fixtures in existing locations, no change of use.Details
remodel existing kitchen abd bathroom in kind, remove and replace existing finishes and fixtures in existing locations, no change of use. | $20,000 |
| Nov 6, 2012 | Completed final sign-off Jul 2013 | 333 Oak Park Dr | interior remodel of extg lower floor. remodel bathroom, , bedroom and stair.Details
interior remodel of extg lower floor. remodel bathroom, , bedroom and stair. | $40,000 |
| Sep 3, 2010 | Completed final sign-off Mar 2011 | 1054 Haight St | rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work.Details
rear bldg - remodel of 2 level unit to include: remodel (e) kitchen, (e) master bath, replace stair rail, replace 2 exterior doors, (n) plumbing & electrical in area of work. | $125,000 |
| Apr 22, 2010 | Completed final sign-off Jul 2010 | 391 Chenery St | new bedroom and full bath in (e) ground fl storage area, renovate (e) kitchen and bath at 2nd fl, renovate (e) utility rm into breakfast rm, new lighting, electrical and plbg, replace 3 (e) ext. window and 1 door at rear of 2nd flDetails
new bedroom and full bath in (e) ground fl storage area, renovate (e) kitchen and bath at 2nd fl, renovate (e) utility rm into breakfast rm, new lighting, electrical and plbg, replace 3 (e) ext. window and 1 door at rear of 2nd fl | $90,000 |
| Jan 25, 2010 | Completed final sign-off Feb 2010 | 3730 Fillmore St | to comply with nov complaint# 200878021 to remove illegal bathroom at ground level and convert bathroom to to closetDetails
to comply with nov complaint# 200878021 to remove illegal bathroom at ground level and convert bathroom to to closet | $3,000 |
| Jan 11, 2008 | Completed final sign-off Apr 2008 | 2040 Sutter St | interior alterations in unit # 506 on the 5th floor. replace kitchen carbinets, counter tops, floor finishes, bathroom vanity, light fixtures, electrical outlets and plumbing fixtures.Details
interior alterations in unit # 506 on the 5th floor. replace kitchen carbinets, counter tops, floor finishes, bathroom vanity, light fixtures, electrical outlets and plumbing fixtures. | $16,000 |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 501 Rhode Island St | total got remodel of (e) bathroom at second floor.Details
total got remodel of (e) bathroom at second floor. | $30,000 |