Back to bathroom remodel contractors
Design Line Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Sep 2026
- Last 24 months
- 13 permits filed
224 permits since 2000: 149 completed, 8 in progress, 36 never finaled, 31 expired or cancelled.
Of the 36 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 31 completed, 1 in progress, 8 never finaled, 5 expired or cancelled. Typically 8 days from filing to permit and 395 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2026 | In progress issued May 2026 | 2121 Divisadero St | create 1 new bathroom on 2nd/fDetails
create 1 new bathroom on 2nd/f | $23,000 |
| Feb 24, 2026 | Completed final sign-off Aug 2026 | 1565 Dolores St | bathroom remodel: shower pan replacement, installation of new shower walls and water proofing, retile shower walls/floor and bathroom floor. all work in-kind, no changes of layout.Details
bathroom remodel: shower pan replacement, installation of new shower walls and water proofing, retile shower walls/floor and bathroom floor. all work in-kind, no changes of layout. | $10,000 |
| Jul 11, 2024 | Completed final sign-off Jul 2025 | 128 Woodland Av | interior remodel to bedroom and bathroomDetails
interior remodel to bedroom and bathroom | $30,000 |
| Feb 21, 2024 | Completed final sign-off Feb 2026 | 600 El Camino Del Mar | renovation of (e) single family home, work includes: reno of kitchen, bathrooms (7 total), bedrooms, and living rooms. new mechanical system, electrical devices and subpanels. no exterior work under this permit.Details
renovation of (e) single family home, work includes: reno of kitchen, bathrooms (7 total), bedrooms, and living rooms. new mechanical system, electrical devices and subpanels. no exterior work under this permit. | $185,120 |
| Mar 22, 2023 | Completed final sign-off Aug 2023 | 565 Marina Bl | ground floor repairs: replacing basebard, sheetrock, and insulation in-kind due to mold remediation, approximately 1,900 sq.ft. one bath renovation: replace fixtures and tiles. no layout change. no moving walls.Details
ground floor repairs: replacing basebard, sheetrock, and insulation in-kind due to mold remediation, approximately 1,900 sq.ft. one bath renovation: replace fixtures and tiles. no layout change. no moving walls. | $12,000 |
| Jul 21, 2022 | Completed final sign-off May 2023 | 565 Marina Bl | one bath renovation and one kitchen remodel. non structrualDetails
one bath renovation and one kitchen remodel. non structrual | $35,000 |
| Jan 12, 2022 | Completed final sign-off Nov 2022 | 1606 Vallejo St | revision to pa# 202107083935. no load bearing walls are being removed. revision adds renovation of 3 baths. replacement of 3 french doors, 2 windows, fau & addition of mini split.Details
revision to pa# 202107083935. no load bearing walls are being removed. revision adds renovation of 3 baths. replacement of 3 french doors, 2 windows, fau & addition of mini split. | $50,000 |
| Sep 30, 2021 | Completed final sign-off Jun 2024 | 1465 Masonic Av | 1 kitchen and 1 bath remodel and no walls moved. no window, door.Details
1 kitchen and 1 bath remodel and no walls moved. no window, door. | $35,000 |
| Aug 17, 2021 | Never finaled issued Aug 2021, no final | 1850 Green St | interior remodel: basement, l1,l2,l3. new mill/casework at l1,l2,l3. remodel bathroom on l3. new wazter closet & sink on l3. no exterior work.Details
interior remodel: basement, l1,l2,l3. new mill/casework at l1,l2,l3. remodel bathroom on l3. new wazter closet & sink on l3. no exterior work. | $95,000 |
| Jan 28, 2021 | Completed final sign-off Jul 2025 | 128 Woodland Av | interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work.Details
interior remodel to an existing 4-story residential dwelling. replace (e) gas insert fireplace at 4th fl. reconfigure walls & bathroom remodel at 3rd fl. minor electrical work. | $140,000 |
| Jul 21, 2020 | Completed final sign-off Jan 2021 | 2800 Pacific Av | in kind bathroom remodel-3 bathrooms, no structural or wall changes. 2nd and 3rd floor.Details
in kind bathroom remodel-3 bathrooms, no structural or wall changes. 2nd and 3rd floor. | $50,000 |
| Oct 16, 2019 | Completed final sign-off Mar 2023 | 2467 Pacific Av | renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th levelDetails
renovation of 4 story over basement multi-family res bldg @ 2467 pacific av. the use remains unchanged as a 2 unit res bldg. modifications include renovate of all floors, (n) garage at basement level and elevator to 1st fl, new dormer, addition of 3 bathrooms, new roof deck at 4th level | $150,000 |
| May 1, 2019 | Completed final sign-off Oct 2020 | 250 10th Av | conversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut.Details
conversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut. | $95,000 |
| Nov 15, 2018 | Completed final sign-off Oct 2020 | 101 Spruce St | residential interior renovation incl kitchen remodel, bathroom modifications and floor refinishDetails
residential interior renovation incl kitchen remodel, bathroom modifications and floor refinish | $410,000 |
| Oct 23, 2017 | Completed final sign-off Sep 2020 | 147 Laidley St | interior remodel on all 3 floors scope includes redesigned kitchen and baths, removal of 2 tiny window at gr fl, rear replacement of rear eck handrail with metalDetails
interior remodel on all 3 floors scope includes redesigned kitchen and baths, removal of 2 tiny window at gr fl, rear replacement of rear eck handrail with metal | $35,000 |
| Jan 27, 2017 | Completed final sign-off Apr 2018 | 2164 Hyde St | on 4th floor - unit 408 - interior remodel of kitchen & bathrooms; new lighting; new plulmbing fixtures; no structural workDetails
on 4th floor - unit 408 - interior remodel of kitchen & bathrooms; new lighting; new plulmbing fixtures; no structural work | $300,000 |
| Jan 18, 2017 | Never finaled issued Jun 2017, no final | 1552 Cole St | new horizontal addition to include: new bathroom. relocate laudry room. new window.Details
new horizontal addition to include: new bathroom. relocate laudry room. new window. | $45,000 |
| Oct 13, 2016 | Expired or cancelled cancelled Mar 2026 | 241 Frederick St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $30,000 |
| Apr 25, 2016 | Completed final sign-off May 2019 | 21 Everson St | replacement of kitchen and bath finishes and fixtures, elec work throughout, upgrade plumbing. no structural or walls removed. layout unchangedDetails
replacement of kitchen and bath finishes and fixtures, elec work throughout, upgrade plumbing. no structural or walls removed. layout unchanged | $30,000 |
| Feb 2, 2016 | Never finaled issued Feb 2016, no final | 1940 Vallejo St | apt 7. interior remodel of (e) kitchen & 3.5 bathsDetails
apt 7. interior remodel of (e) kitchen & 3.5 baths | $65,000 |
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 843 Montgomery St | revision to app#201504284786. revision is to remove scope of work including kitchen scope, updated bathroom layout. n/a maher.Details
revision to app#201504284786. revision is to remove scope of work including kitchen scope, updated bathroom layout. n/a maher. | |
| Aug 14, 2015 | Completed final sign-off Jul 2018 | 685 Marina Bl | horizontal addition @ rear at all 3 levels. (e) 4 bed, 3 powder, 2 bath. new 4 bed, 2 powder, 4 bath. remove (e) stair penthouse & add new motorized skylight above (e) stairhall & all assocated interior remodel & structural work. replace (e) single pane windows to double pane (in kind). maher: n/aDetails
horizontal addition @ rear at all 3 levels. (e) 4 bed, 3 powder, 2 bath. new 4 bed, 2 powder, 4 bath. remove (e) stair penthouse & add new motorized skylight above (e) stairhall & all assocated interior remodel & structural work. replace (e) single pane windows to double pane (in kind). maher: n/a | $400,000 |
| Jul 29, 2015 | Expired or cancelled withdrawn Jul 2016 | 151 Laidley St | vertical addition. renovation to an (e) one story single family residence. one story above & two stories belows the (e) residence are to be added. provide 3.5 bathrooms & 4 bedrooms total.Details
vertical addition. renovation to an (e) one story single family residence. one story above & two stories belows the (e) residence are to be added. provide 3.5 bathrooms & 4 bedrooms total. | $600,000 |
| Jul 8, 2015 | Expired or cancelled expired Jan 2017 | 525 Jersey St | permit revision to 20150218858. window #207 on the second floor bay window in rear of house not visible from street. joist sistering under 2nd & 3rd floor bathroom showers.Details
permit revision to 20150218858. window #207 on the second floor bay window in rear of house not visible from street. joist sistering under 2nd & 3rd floor bathroom showers. | $800 |
| Jun 23, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers)Details
residential remodel. incl removing (e) chimney. (n) dormers and (n) windows, interior work and any related structural work. one added bathroom. vertical addition (dormers) | $50,000 |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 525 Jersey St | interior 2/f & 3/f bathroom renovations. no change on walls and openings.Details
interior 2/f & 3/f bathroom renovations. no change on walls and openings. | $5,000 |
| May 11, 2015 | Completed final sign-off Feb 2017 | 1919 Sacramento St | one kitchen remodel: (1) bathroom remodel on top level, (2) bathrooms remodel on 2/f; (1) bathroom remodel on 1/f (no basement level work); no change in wall & opening layout; kitchen lighting min. 50% wattage high efficacy; bathroom lighting main light high efficacy & rest high efficacy or controlDetails
one kitchen remodel: (1) bathroom remodel on top level, (2) bathrooms remodel on 2/f; (1) bathroom remodel on 1/f (no basement level work); no change in wall & opening layout; kitchen lighting min. 50% wattage high efficacy; bathroom lighting main light high efficacy & rest high efficacy or control | $5,000 |
| May 6, 2015 | Completed final sign-off Aug 2015 | 150 Carmel St | administration correction to pa #201308214903-s: as built condition to verify there are 5 bedrooms and 4 bathrooms and 1 powder room as per approved plan.Details
administration correction to pa #201308214903-s: as built condition to verify there are 5 bedrooms and 4 bathrooms and 1 powder room as per approved plan. | |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 25 Belgrave Av | revision to appl #2012.0227.4899 includes minor architectural changes: reduce window size @ east, reconfigure fixtures in bath #306, remove window @ bed #308.Details
revision to appl #2012.0227.4899 includes minor architectural changes: reduce window size @ east, reconfigure fixtures in bath #306, remove window @ bed #308. | |
| Dec 19, 2014 | Expired or cancelled expired Mar 2019 | 241 Telegraph Hill Bl | unit #6 (402) 4th floor inteiror remodel includes structural work & addition of 1 property line window & 1 egress door & fire escape 1-hr wall construction. relocated bedroom, remove one full bathroom and relocate skylight @ kitchen per plan. relocate of separation wall between unit #5 (401).Details
unit #6 (402) 4th floor inteiror remodel includes structural work & addition of 1 property line window & 1 egress door & fire escape 1-hr wall construction. relocated bedroom, remove one full bathroom and relocate skylight @ kitchen per plan. relocate of separation wall between unit #5 (401). | $200,000 |
| May 2, 2014 | Completed final sign-off Sep 2014 | 223 Spruce St | revision to 201306189808. new bathroom on 3rd floorDetails
revision to 201306189808. new bathroom on 3rd floor | $10,000 |
| Aug 21, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | add 1 story vertical & horizontal addition. minor interior remodel. associated with addition. (e) 1 bedroom, 1 bath to 4 bedroom, 3 bath & 1 powder room.Details
add 1 story vertical & horizontal addition. minor interior remodel. associated with addition. (e) 1 bedroom, 1 bath to 4 bedroom, 3 bath & 1 powder room. | $250,000 |
| Jul 26, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell.Details
interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell. | $50,000 |
| May 9, 2013 | Never finaled issued Jun 2013, no final | 2939 Divisadero St | interior remodel of basement for new media room, storage room and bathroom relocation. addition at rear under seperate site permit app#201303283236, no excavation to occur for project. structural works costs accounted for in seperate permit #201303283236. voluntary seismic strengthening.Details
interior remodel of basement for new media room, storage room and bathroom relocation. addition at rear under seperate site permit app#201303283236, no excavation to occur for project. structural works costs accounted for in seperate permit #201303283236. voluntary seismic strengthening. | $20,000 |
| Apr 30, 2013 | Completed final sign-off Sep 2014 | 223 Spruce St | one kitchen and 2 bathrooms remodel, all plumbing fixtures to be replaced in-kindDetails
one kitchen and 2 bathrooms remodel, all plumbing fixtures to be replaced in-kind | $10,000 |
| Feb 27, 2012 | Completed final sign-off Dec 2016 | 25 Belgrave Av | remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse.Details
remodel & horizonal addition to include: (n) basement with 2 car garage beneath (e) 1st floor. 1st flr: remodel for (n) media rm. 2nd flr: remodel living spaces. 3rd flr: remodel bedrm & bath. roof: (n) roof deck & stair penthouse. | $400,000 |
| Dec 28, 2011 | Never finaled issued Jan 2012, no final | 207 Maple St | interior remodel of first floor with extg bldg, includes renovation of extg powder room and bathroom,replace 2 windows at rear of property and limited structural work.Details
interior remodel of first floor with extg bldg, includes renovation of extg powder room and bathroom,replace 2 windows at rear of property and limited structural work. | $100,000 |
| Sep 28, 2011 | Completed final sign-off Oct 2012 | 2876 Washington St | interior remodel within extg bldg: includes limited structural work. some plmg and electrical work. unit on second floor only. 2 new bathrooms and one new kitchen. removal of 2 wall at extg dining room. removal of the 3 window and replace of three windows.Details
interior remodel within extg bldg: includes limited structural work. some plmg and electrical work. unit on second floor only. 2 new bathrooms and one new kitchen. removal of 2 wall at extg dining room. removal of the 3 window and replace of three windows. | $120,000 |
| Sep 8, 2011 | Completed final sign-off Aug 2012 | 2876 Washington St | kitchen & bathroom renovation in place and in kind. replacement of finishes, fixtures and appliances. no structural work and no wall relocation. no exterior work.Details
kitchen & bathroom renovation in place and in kind. replacement of finishes, fixtures and appliances. no structural work and no wall relocation. no exterior work. | $17,000 |
| Aug 27, 2010 | Completed final sign-off Mar 2011 | 2440 Broadway | modifications to rear elevation at first floor and interior renovations to first floor of (e)residential building. structural modifications in garage, new stair connecting first floor storage space to lower unit, conversion of 1st floor storage to family room, home office and bathroom.Details
modifications to rear elevation at first floor and interior renovations to first floor of (e)residential building. structural modifications in garage, new stair connecting first floor storage space to lower unit, conversion of 1st floor storage to family room, home office and bathroom. | $50,000 |
| Jul 13, 2010 | Completed final sign-off Sep 2011 | 1940 Vallejo St | unit #8: interior renovation of flat. replace rear facing bay windows with larger units. demo slabs in bathrooms and replace. demo and add partitions as noted on plans. all work on the 8th floor only.Details
unit #8: interior renovation of flat. replace rear facing bay windows with larger units. demo slabs in bathrooms and replace. demo and add partitions as noted on plans. all work on the 8th floor only. | $200,000 |
| Jun 22, 2010 | Completed final sign-off Mar 2011 | 2440 Broadway | interior renovation to the basement, garage, lower unit, and middle unit. work to include new storage spaces at basement, new acoustical ceiling assemblies and modifications to lower unit bathroom, powder room and kitchen.Details
interior renovation to the basement, garage, lower unit, and middle unit. work to include new storage spaces at basement, new acoustical ceiling assemblies and modifications to lower unit bathroom, powder room and kitchen. | $40,000 |
| Jun 26, 2008 | Completed final sign-off Apr 2010 | 339 19th Av | vertical & horizontal extension-add a 3rd story master suite, new stairs to connect 3/f, reconstruct frt door entrance at 2/f to relocate front door and add windows, add new deck @ rear of 2nd story.remove hallway in garage. on g/f, enlarge fm rm, new bath, lndry rm and increase ceilg ht to 8'Details
vertical & horizontal extension-add a 3rd story master suite, new stairs to connect 3/f, reconstruct frt door entrance at 2/f to relocate front door and add windows, add new deck @ rear of 2nd story.remove hallway in garage. on g/f, enlarge fm rm, new bath, lndry rm and increase ceilg ht to 8' | $85,000 |
| Apr 7, 2008 | Completed final sign-off May 2012 | 4558 19th St | demolish rear portion of (e) bldg. construct new 3 story over basement rear addition. addition includes bedroom, bathroom, family room, rec. room, basement. replace planter & stairs at front yard. repair dry rot throughout.Details
demolish rear portion of (e) bldg. construct new 3 story over basement rear addition. addition includes bedroom, bathroom, family room, rec. room, basement. replace planter & stairs at front yard. repair dry rot throughout. | $375,000 |
| Sep 15, 2003 | Expired or cancelled expired Oct 2006 | 1350 Fell St | renovation (e)1st level incl. (n)garage/playrm/laundry/bath. renovate (e) 2nd level incl cr/dr/fam.Details
renovation (e)1st level incl. (n)garage/playrm/laundry/bath. renovate (e) 2nd level incl cr/dr/fam. | $300,000 |