Block 1290, lot 013
150 Carmel St
- City’s use
- Single Family Residential
- Built
- 1937
- Stories
- 4
- Units
- 1
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 4,846 sq ft
- Lot
- 3,763 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2015 | Completed final sign-off Aug 2015 | 150 Carmel St | Design Line Construction | administration correction to pa #201308214903-s: as built condition to verify there are 5 bedrooms and 4 bathrooms and 1 powder room as per approved plan.Details
administration correction to pa #201308214903-s: as built condition to verify there are 5 bedrooms and 4 bathrooms and 1 powder room as per approved plan. | |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 150 Carmel St | street spaceDetails
street space | ||
| Jan 7, 2015 | Never finaled issued Jan 2015, no final | 150 Carmel St | street spaceDetails
street space | ||
| Sep 9, 2014 | Never finaled issued Sep 2014, no final | 150 Carmel St | street spaceDetails
street space | ||
| Jun 12, 2014 | Completed final sign-off Aug 2015 | 150 Carmel St | Madden Plumbing, Llc | install new sprinkler system with (52) sprinklers per nfpa #13-d; and 15 ft of (n) underground piping, ti 2013-0821-4903Details
install new sprinkler system with (52) sprinklers per nfpa #13-d; and 15 ft of (n) underground piping, ti 2013-0821-4903 | $20,000 |
| Mar 24, 2014 | Completed final sign-off Apr 2015 | 150 Carmel St | Design Line Construction | revision to pa#201307262858. revision to foundation per plan.Details
revision to pa#201307262858. revision to foundation per plan. | $5,000 |
| Aug 21, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | Design Line Construction | add 1 story vertical & horizontal addition. minor interior remodel. associated with addition. (e) 1 bedroom, 1 bath to 4 bedroom, 3 bath & 1 powder room.Details
add 1 story vertical & horizontal addition. minor interior remodel. associated with addition. (e) 1 bedroom, 1 bath to 4 bedroom, 3 bath & 1 powder room. | $250,000 |
| Jul 26, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | Design Line Construction | interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell.Details
interior remodel, structural repairs & upgrades. remove (e) roof deck, remodel bedroom & stairs @ ground floor. remodel kitchen & bath @ 2/f. shotcrete basement wall. remove existing non permitted improvements on roof and to infill existing interior lightwell. | $50,000 |
| May 21, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | Design Line Construction | to comply to complaint 201304892 - removal of all interior wall finishes - limted to lath and plaster, hardwood flooring, cabinets and fixtures. this work is in preparation for a pending project that includes a fill seismic upgrade and addition to building.Details
to comply to complaint 201304892 - removal of all interior wall finishes - limted to lath and plaster, hardwood flooring, cabinets and fixtures. this work is in preparation for a pending project that includes a fill seismic upgrade and addition to building. | $8,000 |
| Apr 25, 2013 | Completed final sign-off Apr 2015 | 150 Carmel St | Design Line Construction | removal of all interior finishes for 5% of wall exploratory demo for engineer's review, no structural work, no electrical, no plumbingDetails
removal of all interior finishes for 5% of wall exploratory demo for engineer's review, no structural work, no electrical, no plumbing | $5,000 |
| Nov 17, 2009 | Never finaled issued Nov 2009, no final | 150 Carmel St | street spaceDetails
street space | ||
| Nov 12, 2009 | Completed final sign-off Feb 2010 | 150 Carmel St | Wallace Remodeling Inc. | replace 4 double casement front windows fiberglass, 8 lites same pattern, replace 1 round picture front windowDetails
replace 4 double casement front windows fiberglass, 8 lites same pattern, replace 1 round picture front window | $2,500 |
| Jan 12, 2007 | Never finaled issued Jan 2007, no final | 150 Carmel St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Design Line Construction (6), Madden Plumbing, Llc, Wallace Remodeling Inc.
- Architects
- Andy Lin (2)
- Engineers
- Erevan O'neill
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.