Back to kitchen remodel contractors
Dennis Webb Construction
- Based in
- Mill Valley
- On San Francisco permits
- May 2004 to Feb 2026
- Last 24 months
- 6 permits filed
60 permits since 2000: 36 completed, 4 in progress, 11 never finaled, 9 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 4 completed, 1 in progress, 2 expired or cancelled. Typically 14 days from filing to permit and 406 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2024 | In progress issued May 2024 | 879 26th Av | remodel upper fl. kitchen and lower fl. kitchenette, remodel upper fl and lower floor bath rooms, eliminating altering lightwells on north and south sides of the building, demo of interior walls and rebuilding room with new layout on both floorsDetails
remodel upper fl. kitchen and lower fl. kitchenette, remodel upper fl and lower floor bath rooms, eliminating altering lightwells on north and south sides of the building, demo of interior walls and rebuilding room with new layout on both floors | $275,000 |
| Sep 11, 2015 | Completed final sign-off Apr 2017 | 141 San Pablo Av | interior renovation of extg single family home with new kitchen, bathrooms, and reconfiguration of extg mezzanine in great room. add patio door at rear of home.Details
interior renovation of extg single family home with new kitchen, bathrooms, and reconfiguration of extg mezzanine in great room. add patio door at rear of home. | $175,000 |
| Jun 25, 2015 | Expired or cancelled expired Apr 2021 | 1200 Gough St | kitchen remodel (cabinets, plmg, elec) install washer/dryer, replace bedroom window(u-factor 0.30 or better)Details
kitchen remodel (cabinets, plmg, elec) install washer/dryer, replace bedroom window(u-factor 0.30 or better) | $20,000 |
| May 24, 2013 | Completed final sign-off Feb 2014 | 718 Church St | unit #7:revision to app#201305066188. modification to interior walls. living room/dinning room/kitchen.Details
unit #7:revision to app#201305066188. modification to interior walls. living room/dinning room/kitchen. | $4,100 |
| Jul 25, 2011 | Completed final sign-off Aug 2012 | 165 07th Av | removal and replacement all existing kitchen cabinets, removing all plaster, upgrading electrical to meet current code. all work in ktichen only. non structural remodel.Details
removal and replacement all existing kitchen cabinets, removing all plaster, upgrading electrical to meet current code. all work in ktichen only. non structural remodel. | $12,000 |
| Jun 10, 2011 | Expired or cancelled expired Oct 2012 | 1073 Broadway | remove and replace kitchen cabinets. install new sink, new lighting in kitchen to meet t-24. new lighting on top floor, remove and replace drywall and doors in unit one at main level. no wall removalDetails
remove and replace kitchen cabinets. install new sink, new lighting in kitchen to meet t-24. new lighting on top floor, remove and replace drywall and doors in unit one at main level. no wall removal | $25,000 |
| Dec 29, 2005 | Completed final sign-off Mar 2008 | 630 Rhode Island St | add 1 room to existing back cottage unit. remodel kitchen and bath. reroof, new skylights. reference varieance 20050692v granted @ hearing of dec 14, 2005.Details
add 1 room to existing back cottage unit. remodel kitchen and bath. reroof, new skylights. reference varieance 20050692v granted @ hearing of dec 14, 2005. | $19,000 |