Dennis Webb Construction
- Based in
- Mill Valley
- On San Francisco permits
- May 2004 to Feb 2026
- Last 24 months
- 6 permits filed
60 permits since 2000: 36 completed, 4 in progress, 11 never finaled, 9 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 expired or cancelled.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Expired or cancelled withdrawn Dec 2022 | 2539 18th Av | installation of new insulation all walls and ceiling, replace sheetrock, remdoel existing bathroom, add/modify existing closet, replace patio slider. all work at lower floor. bedroom/bath hallway. repair back lower deck, repair less than 50%. dry rot deck boards.Details
installation of new insulation all walls and ceiling, replace sheetrock, remdoel existing bathroom, add/modify existing closet, replace patio slider. all work at lower floor. bedroom/bath hallway. repair back lower deck, repair less than 50%. dry rot deck boards. | $42,350 |