Dcs Plumbing Llc
- Based in
- So San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 36 permits filed
191 permits since 2000: 145 completed, 10 in progress, 27 never finaled, 9 expired or cancelled.
Of the 27 never-finaled permits, 4 are 3 to 5 years old, 20 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 2 expired or cancelled. Typically 44 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2025 | Completed final sign-off Feb 2026 | 474 Mangels Av | remove and replace tile at front exterior entry stair, repair waterproofing. remove stucco at front facade & replace dry rot wood. widen garage door by 10". new stucco at front facade.Details
remove and replace tile at front exterior entry stair, repair waterproofing. remove stucco at front facade & replace dry rot wood. widen garage door by 10". new stucco at front facade. | $38,000 |
| Oct 23, 2025 | Completed final sign-off Oct 2026 | 3242 Divisadero St | 3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1.Details
3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1. | $145,000 |
| Sep 11, 2025 | Completed final sign-off Oct 2026 | 3240 Divisadero St | alter exterior entry stair by removing 2 terrazzo seps and replace with a landing and 2 (n) steps shifted towards street. add carage acess doorway at (n) landing.Details
alter exterior entry stair by removing 2 terrazzo seps and replace with a landing and 2 (n) steps shifted towards street. add carage acess doorway at (n) landing. | $24,000 |
| Nov 20, 2024 | Completed final sign-off Mar 2025 | 1005 Church St | handrail added to front stairwell (front facing) to comply with nov2024-304-41 item #2 and #3. new stair guard rail along the outside wall of staircase. no demo or loss of historic features on staircaseDetails
handrail added to front stairwell (front facing) to comply with nov2024-304-41 item #2 and #3. new stair guard rail along the outside wall of staircase. no demo or loss of historic features on staircase | $5,000 |
| Mar 7, 2023 | Expired or cancelled cancelled Jan 2026 | 3030 22nd Av | replace in kind front exterior concrete stairsDetails
replace in kind front exterior concrete stairs | $15,000 |
| Nov 9, 2022 | Completed final sign-off Dec 2022 | 765 Lawton St | corrective work in response to nov complaint #202291531 in kind replacement repair of new compliant stair landing and guardrail leading to the rearyard.Details
corrective work in response to nov complaint #202291531 in kind replacement repair of new compliant stair landing and guardrail leading to the rearyard. | $8,000 |
| Jul 15, 2022 | Completed final sign-off Oct 2024 | 345 Granada Av | 1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and newDetails
1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and new | $425,000 |
| Jan 16, 2019 | Completed final sign-off Sep 2019 | 142 28th Av | remodel in-kind one kitchen, three decks, front stairs, back stairs, 3 bathrooms remodeled in-kind. 28 windows replaced in-kind.Details
remodel in-kind one kitchen, three decks, front stairs, back stairs, 3 bathrooms remodeled in-kind. 28 windows replaced in-kind. | $150,000 |
| Feb 23, 2018 | Completed final sign-off Jun 2018 | 305 30th St | new door, bring stairs to code, adjust rails, steps spacing height/width per code, riser max 7-3/4" tread-min. 10" including hand rail 34"-38" min/maxDetails
new door, bring stairs to code, adjust rails, steps spacing height/width per code, riser max 7-3/4" tread-min. 10" including hand rail 34"-38" min/max | $8,375 |
| Jan 18, 2018 | Completed final sign-off Jan 2019 | 305 30th St | new sprial staircase. new windows, new skylights. no work visible from street. no fire alarm and sprinkler workDetails
new sprial staircase. new windows, new skylights. no work visible from street. no fire alarm and sprinkler work | $35,000 |
| Sep 14, 2017 | Expired or cancelled cancelled Feb 2019 | 1276 Geneva Av | repair (e) rear stairs less than 50%; treads & stairs. to comply with nov201785921 item 2.Details
repair (e) rear stairs less than 50%; treads & stairs. to comply with nov201785921 item 2. | $4,000 |
| Sep 9, 2015 | Completed final sign-off Mar 2016 | 1347 Divisadero St | t.i. to correct nov #201550732. stair, shower, restroom and partitions. no exterior work. no fire alarm or sprinklers. n/a for maher.Details
t.i. to correct nov #201550732. stair, shower, restroom and partitions. no exterior work. no fire alarm or sprinklers. n/a for maher. | $10,000 |