Back to bathroom remodel contractors
Dcs Plumbing Llc
- Based in
- So San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2026
- Last 24 months
- 36 permits filed
191 permits since 2000: 145 completed, 10 in progress, 27 never finaled, 9 expired or cancelled.
Of the 27 never-finaled permits, 4 are 3 to 5 years old, 20 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
82 bathroom remodel permits: 64 completed, 5 in progress, 10 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 132 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2026 | In progress issued Aug 2026 | 1515 Noe St | bathroom remodel in kind, new flooring, new tiles, vanity, fixtures.Details
bathroom remodel in kind, new flooring, new tiles, vanity, fixtures. | $20,000 |
| Jun 3, 2026 | In progress issued Sep 2026 | 2360 03rd St | ti to convert (e) retail space to (n) office space as allowed by planning section 202.1. for historic category a w/in umu zoning district. ti work will include removing shelves, new flooring, in-kind bathroom remodel & new paintDetails
ti to convert (e) retail space to (n) office space as allowed by planning section 202.1. for historic category a w/in umu zoning district. ti work will include removing shelves, new flooring, in-kind bathroom remodel & new paint | $60,000 |
| May 23, 2026 | Completed final sign-off Sep 2026 | 263 Upper Tr | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $15,000 |
| Dec 3, 2025 | Completed final sign-off Sep 2026 | 1385 Church St | new kitchen, cabinets and flooring 10x8 replace in kind, in kind hallway bathroom remodel, tiles, fixtures and vanity 8x8 sq ft. replace in kind powder room fixtures 4x3 sq ft.Details
new kitchen, cabinets and flooring 10x8 replace in kind, in kind hallway bathroom remodel, tiles, fixtures and vanity 8x8 sq ft. replace in kind powder room fixtures 4x3 sq ft. | $30,000 |
| Nov 20, 2025 | Completed final sign-off Mar 2026 | 215 Virginia Av | unit #215: remodel existing bathroom and add new washer and dryer in unit.Details
unit #215: remodel existing bathroom and add new washer and dryer in unit. | $24,000 |
| Nov 6, 2025 | Completed final sign-off Mar 2026 | 4090 17th St | bathroom and kitchen remodel in kind, cabinets and flooring, bathroom vanity, toilet and tub to shower w/ panDetails
bathroom and kitchen remodel in kind, cabinets and flooring, bathroom vanity, toilet and tub to shower w/ pan | $15,500 |
| Oct 23, 2025 | Completed final sign-off Oct 2026 | 3242 Divisadero St | 3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1.Details
3rd fl: remodel (e) kitchen, expand living room closet into stair landing to create an office. remodel hall bathroom, relocate w/d an add new bathroom at bedroom 1. | $145,000 |
| Aug 20, 2025 | In progress issued Aug 2025 | 70 25th Av | 2 bathrooms remodel in kind master full remodel. one new shower pan guest bath full remodel one new shower pan. master 10x10 sq feet, guest 6x8 sq feet.Details
2 bathrooms remodel in kind master full remodel. one new shower pan guest bath full remodel one new shower pan. master 10x10 sq feet, guest 6x8 sq feet. | $50,000 |
| Aug 20, 2025 | Completed final sign-off Dec 2025 | 869 30th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $12,000 |
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 628 San Jose Av | remodel master bathroom; in-kind. new tub, new vanity & fixtures. approx. size 649 sq ft.Details
remodel master bathroom; in-kind. new tub, new vanity & fixtures. approx. size 649 sq ft. | $20,000 |
| Jun 10, 2025 | Completed final sign-off Nov 2025 | 82 Parnassus Av | bathroom main remodel. replaced in kind 100 sq ft, new tub, vanity, flooring.Details
bathroom main remodel. replaced in kind 100 sq ft, new tub, vanity, flooring. | $25,000 |
| Jun 9, 2025 | Completed final sign-off Nov 2025 | 4034 Cesar Chavez St | unit #4 replace in kind kitchen: new counters, flooring and cabinets. replace in kind bathroom with new shower pan, vanity and flooringDetails
unit #4 replace in kind kitchen: new counters, flooring and cabinets. replace in kind bathroom with new shower pan, vanity and flooring | $40,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2026 | 3240 Divisadero St | 1st/f: remove 2 post & 2 walls to allow for side by side parking, n)structural beams, posts, walls & footing. 2nd/f: remodel e) kitchen & remove bearing wall btw kitchen & dining. remodel bathroom & open up hallway to laundry. no exterior front facade work & no habitable space add. rev 202411084737Details
1st/f: remove 2 post & 2 walls to allow for side by side parking, n)structural beams, posts, walls & footing. 2nd/f: remodel e) kitchen & remove bearing wall btw kitchen & dining. remodel bathroom & open up hallway to laundry. no exterior front facade work & no habitable space add. rev 202411084737 | $78,000 |
| Apr 7, 2025 | Completed final sign-off Jun 2025 | 2189 Market St | unit#1: kitchen, master bathroom tub to 1-shower pan, guest bath remodel in-kind.Details
unit#1: kitchen, master bathroom tub to 1-shower pan, guest bath remodel in-kind. | $60,000 |
| Jan 7, 2025 | Completed final sign-off Mar 2025 | 3454 Scott St | master bathroom remodel in kind . new shower pan, vanity and fixtures.Details
master bathroom remodel in kind . new shower pan, vanity and fixtures. | $30,000 |
| Nov 8, 2024 | In progress issued Nov 2024 | 3240 Divisadero St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $23,500 |
| Oct 25, 2024 | Completed final sign-off Jan 2025 | 3301 Mission St | in-kind remodeling of 2 bathroom(s) in 4th fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 4th fl with 1 shower pan(s). | $11,000 |
| Jul 22, 2024 | Completed final sign-off Oct 2024 | 531 Baker St | podwer room remodel in kind. bathroom remodel with a tub. no shower.Details
podwer room remodel in kind. bathroom remodel with a tub. no shower. | $15,000 |
| Jul 12, 2024 | Completed final sign-off Nov 2024 | 1734 41st Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2024 | 123 Villa Tr | 1st floor remodel of (e) master bathroom and 2nd floor remodel (e) kitchen , laundry and 1/2 bathroomDetails
1st floor remodel of (e) master bathroom and 2nd floor remodel (e) kitchen , laundry and 1/2 bathroom | $65,000 |
| Feb 14, 2024 | Completed final sign-off Mar 2024 | 1329 Powell St | to comply with nov 202419427; kitchen and one bathroom remodel in kind replacement cabinets counter and vanitiesDetails
to comply with nov 202419427; kitchen and one bathroom remodel in kind replacement cabinets counter and vanities | $25,000 |
| Jan 11, 2024 | In progress issued Jan 2024 | 900 Bush St | unit 517: kitchen remodel w/replaced in kind cabinet, vanities and appliances. non structural. also replace two vanities in kind both bathrooms. replace sink and faucetDetails
unit 517: kitchen remodel w/replaced in kind cabinet, vanities and appliances. non structural. also replace two vanities in kind both bathrooms. replace sink and faucet | $18,000 |
| Dec 19, 2023 | Completed final sign-off Sep 2024 | 175 Yukon St | in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 3rd fl with 1 shower pan(s). | $12,000 |
| Dec 13, 2023 | Completed final sign-off Jan 2025 | 134 26th Av | remodel (e) kitchen and bathroom. renove center line bearing wall at hallway. new skylight. no front facade workDetails
remodel (e) kitchen and bathroom. renove center line bearing wall at hallway. new skylight. no front facade work | $65,000 |
| Nov 27, 2023 | Completed final sign-off Mar 2024 | 325 Laidley St | kitchen remodel in kind, cabinets, counters, and tile. 2 bathrooms remodel in kind, vanity and new tile over new shower pan. replace windows in kind back of the house near kitchen.Details
kitchen remodel in kind, cabinets, counters, and tile. 2 bathrooms remodel in kind, vanity and new tile over new shower pan. replace windows in kind back of the house near kitchen. | $50,000 |
| Nov 6, 2023 | Completed final sign-off Jan 2024 | 741 Clement St | unit# 201: remodel batroom in kind primary bathroom tile, sower pan, vanity and toilet replacedDetails
unit# 201: remodel batroom in kind primary bathroom tile, sower pan, vanity and toilet replaced | $15,000 |
| Oct 3, 2023 | Completed final sign-off Oct 2023 | 281 Juanita Wy | to comply with nov# 202313754, kitchen remodel in-kind to replace counter, backsplash tile & sink; and bathroom remodel in-kind to replace shower pan, vanity & toilet. floor tile & valve. no str demoDetails
to comply with nov# 202313754, kitchen remodel in-kind to replace counter, backsplash tile & sink; and bathroom remodel in-kind to replace shower pan, vanity & toilet. floor tile & valve. no str demo | $12,000 |
| Jul 20, 2023 | Completed final sign-off Jan 2024 | 2663 Filbert St | 2-bathroom remodels: demo of existing plumbing fixtures and interior finishes, demo of 2 non-load bearing partitions, new plumbing fixtures and finishes, new light fixtures, outlets and switches. no exterior work, no structural work.Details
2-bathroom remodels: demo of existing plumbing fixtures and interior finishes, demo of 2 non-load bearing partitions, new plumbing fixtures and finishes, new light fixtures, outlets and switches. no exterior work, no structural work. | $30,000 |
| Jun 8, 2023 | Completed final sign-off Jan 2024 | 5094 Diamond Heights Bl | 1 master and 1 guest bathroom remodeled in kind. tile fixtures new. 2 tub to shower with the 2 new shower pans. 2 new vanities. non structural.Details
1 master and 1 guest bathroom remodeled in kind. tile fixtures new. 2 tub to shower with the 2 new shower pans. 2 new vanities. non structural. | $30,000 |
| May 23, 2023 | Completed final sign-off Jul 2023 | 1250 Wayland St | remodel/upgrade existing bathroom in kind. replace 1 window, @ 2nd flr, rear facing, uf<0.30. in kindDetails
remodel/upgrade existing bathroom in kind. replace 1 window, @ 2nd flr, rear facing, uf<0.30. in kind | $5,800 |
| May 5, 2023 | Completed final sign-off Dec 2023 | 2834 Divisadero St | kitchen and bathroom renovation in kind, new cabinets, counters, and flooring. also, (3) windows in kind replaced at left back of the house.Details
kitchen and bathroom renovation in kind, new cabinets, counters, and flooring. also, (3) windows in kind replaced at left back of the house. | $45,000 |
| Apr 10, 2023 | Never finaled filed Apr 2023, never issued | 1179 Florida St | comply w/ nov 202181795 (bathroom completed w/o permit); 201807201 (front window replace)Details
comply w/ nov 202181795 (bathroom completed w/o permit); 201807201 (front window replace) | $15,000 |
| Mar 13, 2023 | Completed final sign-off May 2023 | 3057 Franklin St | one bathoom & one kitchen: bathroom new tile and vanity. kitchen new cabinetry, tile and countertops.Details
one bathoom & one kitchen: bathroom new tile and vanity. kitchen new cabinetry, tile and countertops. | $45,000 |
| Mar 7, 2023 | Completed final sign-off Apr 2023 | 357 San Leandro Wy | in kind bathroom- remodel w/ shower pan. new vanity and toiletDetails
in kind bathroom- remodel w/ shower pan. new vanity and toilet | $20,000 |
| Feb 4, 2023 | Completed final sign-off Jun 2023 | 282 States St | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $22,000 |
| Nov 16, 2022 | Completed final sign-off Mar 2023 | 54 Fair Oaks St | replace in kind. new tile, fixtures, cabinets in kitchen and bathroom.Details
replace in kind. new tile, fixtures, cabinets in kitchen and bathroom. | $15,000 |
| Aug 10, 2022 | Completed final sign-off Dec 2022 | 180 Haight St | remodel kitchen and existing bathroom. no additional sf added in kind. kitchen and changing tub/ shower to shower only.Details
remodel kitchen and existing bathroom. no additional sf added in kind. kitchen and changing tub/ shower to shower only. | $25,000 |
| Jul 15, 2022 | Completed final sign-off Oct 2024 | 345 Granada Av | 1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and newDetails
1st floor excavte and drop f.f. level including modify perimeter foundation, new foundation and s.o.g replace (e) stairs and build rooms down including family room, laundry, bath bedroom,. at 2nd flr, remodel kitchen, bedrooms & bathrooms, bathroom replace all windows, new floors, new elect and new | $425,000 |
| Feb 23, 2022 | Completed final sign-off Jul 2022 | 1150 Lombard St | unit #21: one kitchen & guest bathroom & master bathroom remodel in-kind. change tub to walk-in shower. one kitchen two baths.Details
unit #21: one kitchen & guest bathroom & master bathroom remodel in-kind. change tub to walk-in shower. one kitchen two baths. | $30,000 |
| Dec 30, 2021 | Completed final sign-off Sep 2022 | 1000 North Point St | replace in kind kitchen cabinets and counters: bathroom remodel replace in kind: vanity, cabinet and tile. approx 50 sqftDetails
replace in kind kitchen cabinets and counters: bathroom remodel replace in kind: vanity, cabinet and tile. approx 50 sqft | $30,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2022 | 560 Hill St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $12,000 |
| Sep 16, 2021 | Completed final sign-off Apr 2025 | 530 Castro St | legalize the unwarranted extension & simplify the bldg envelope on the 1st fl @ the rear bldg, adding 100 sq ft.install a 435 sqft deck with guardrail @ (e) 1st floor deck area(roof of the ground level retail space),reconfigure interior walls to add 1.5 bath.Details
legalize the unwarranted extension & simplify the bldg envelope on the 1st fl @ the rear bldg, adding 100 sq ft.install a 435 sqft deck with guardrail @ (e) 1st floor deck area(roof of the ground level retail space),reconfigure interior walls to add 1.5 bath. | $200,000 |
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 1901 Pacific Av | unit 7: one kitchen and one bath replace in kind for kitchen: 160 sqft cabinets replace counter and appliances. bath 75 sqft vanity, tile and fixtures replace. non structural.Details
unit 7: one kitchen and one bath replace in kind for kitchen: 160 sqft cabinets replace counter and appliances. bath 75 sqft vanity, tile and fixtures replace. non structural. | $20,000 |
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 1901 Pacific Av | unit 5: remodel replace in kind one kitchen one bath- kitchen 60 sqft new sink, cabinet, and appliances. bathroom 75 sqft vanity, tile and fixtures. replace non structural.Details
unit 5: remodel replace in kind one kitchen one bath- kitchen 60 sqft new sink, cabinet, and appliances. bathroom 75 sqft vanity, tile and fixtures. replace non structural. | $12,000 |
| Apr 16, 2021 | Completed final sign-off Nov 2021 | 1639 47th Av | 1 bathroom remodel in-kind. new vanity, shower & toilet. no new wall. no wal relocation. new lighting shall comply with cec150.0(k)s.Details
1 bathroom remodel in-kind. new vanity, shower & toilet. no new wall. no wal relocation. new lighting shall comply with cec150.0(k)s. | $15,000 |
| Mar 9, 2021 | Completed final sign-off Sep 2021 | 18 Eagle St | renovate front bathoom in kind approx. 7x12 sq ft. renovate master bathroom in kind aprox. 9x12 sq ft. both gets new tiles,vanity,toilet & fan. 2 bath remodelDetails
renovate front bathoom in kind approx. 7x12 sq ft. renovate master bathroom in kind aprox. 9x12 sq ft. both gets new tiles,vanity,toilet & fan. 2 bath remodel | $35,000 |
| Feb 11, 2021 | Completed final sign-off Jul 2021 | 1925 Pacific Av | unit 4: guest bath replace shower in kind new tile and pan. also tile floor, new vanity. 2nd bath master tub replaced in kind. new tub, tile, and vanityDetails
unit 4: guest bath replace shower in kind new tile and pan. also tile floor, new vanity. 2nd bath master tub replaced in kind. new tub, tile, and vanity | $11,500 |
| Jan 8, 2021 | Completed final sign-off Mar 2021 | 1925 Pacific Av | #2: bathroom remodel 100 sq feet, replace in kind fixtures, vanity. convert tub to shower with new tile and pan.Details
#2: bathroom remodel 100 sq feet, replace in kind fixtures, vanity. convert tub to shower with new tile and pan. | $6,000 |
| Nov 5, 2020 | Completed final sign-off Apr 2021 | 549 28th St | renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area.Details
renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area. | $52,000 |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 445 Upper Tr | unit 5: (2) bathrooms remodeled in-kind, 50 sq. ft & 60 sq. ft. sink, vanity, tub, tile replaced. new shower panDetails
unit 5: (2) bathrooms remodeled in-kind, 50 sq. ft & 60 sq. ft. sink, vanity, tub, tile replaced. new shower pan | $17,000 |
| Sep 19, 2020 | Completed final sign-off Apr 2021 | 318 Fair Oaks St | interior remodel on 3rd floor in upper unit. combine existing split bath into single full bath. convert existing storage closet into (n) 2nd bath. no structural work. add 1 fixed, 45-min rated window at property line.Details
interior remodel on 3rd floor in upper unit. combine existing split bath into single full bath. convert existing storage closet into (n) 2nd bath. no structural work. add 1 fixed, 45-min rated window at property line. | $40,000 |
| Jul 31, 2020 | Never finaled issued Aug 2020, no final | 258 Edgewood Av | kitchen (~10'x11') remodel and replacement of cabinets. counters, and flooring replaced. bathroom (~5'x8') remodel. tile shower and floor. vanity replaced. light fixture and fan. deck repair less than 40 percent. rear deck and not visible from street. dry rot (~10'x10') removed. all work in kind.Details
kitchen (~10'x11') remodel and replacement of cabinets. counters, and flooring replaced. bathroom (~5'x8') remodel. tile shower and floor. vanity replaced. light fixture and fan. deck repair less than 40 percent. rear deck and not visible from street. dry rot (~10'x10') removed. all work in kind. | $35,000 |
| Jul 21, 2020 | Completed final sign-off Sep 2022 | 2141 Filbert St | partial infill of (e) lightwell with (n) bathroom. removal of (e) chimney. maher n/a.Details
partial infill of (e) lightwell with (n) bathroom. removal of (e) chimney. maher n/a. | $80,000 |
| May 22, 2020 | Completed final sign-off Sep 2020 | 866 Foerster St | 2 bathroom remodel replaced in kind. new tile and vanity. kitchen remodel in kind. cabinets replaced and new appliances. all windows replaced in kind with composite fiberglass windows. balcony replaced in kind less than 40%, rear of bldg.Details
2 bathroom remodel replaced in kind. new tile and vanity. kitchen remodel in kind. cabinets replaced and new appliances. all windows replaced in kind with composite fiberglass windows. balcony replaced in kind less than 40%, rear of bldg. | $60,000 |
| Jan 6, 2020 | Never finaled issued Jan 2020, no final | 1708 Fell St | replace e washer and dryer in laundry room. replace in kind bath vanity and toilet/bath 50 sq ft landryDetails
replace e washer and dryer in laundry room. replace in kind bath vanity and toilet/bath 50 sq ft landry | $20,000 |
| Oct 17, 2019 | Completed final sign-off Jan 2020 | 1800 Turk St | unit 303: bathroom remodel, in-kind vanity/toilet, change tub too standing shower, add laundry room to bathroom wall, approx. 75 sq. ft. area of bathroom for laundry, with ventless dryer.Details
unit 303: bathroom remodel, in-kind vanity/toilet, change tub too standing shower, add laundry room to bathroom wall, approx. 75 sq. ft. area of bathroom for laundry, with ventless dryer. | $8,500 |
| May 2, 2019 | Completed final sign-off Sep 2019 | 651 14th Av | bath remodel and add 2nd bathDetails
bath remodel and add 2nd bath | $75,000 |
| Mar 22, 2019 | Completed final sign-off Sep 2019 | 142 28th Av | add a new bathroom on 2nd floor.Details
add a new bathroom on 2nd floor. | $14,000 |
| Feb 6, 2019 | Completed final sign-off May 2019 | 2408 Green St | remodel kitchen, laundry and bathroomDetails
remodel kitchen, laundry and bathroom | $25,000 |
| Feb 1, 2019 | Completed final sign-off Sep 2019 | 643 Webster St | unit 7:remodel kitchen & bathroom (n) d/w ventless under counter washer & dryer combo (n) cabinets , coutertops. plumbing fixtures & appliances, @ kitchen (n) tile floor vanity @ bathrooms (n) electrical gfci oulets, kitchen 8'2" x7 0" bahroom 5'5" x7' 4" all 9n) lighting shall be high efficiencyDetails
unit 7:remodel kitchen & bathroom (n) d/w ventless under counter washer & dryer combo (n) cabinets , coutertops. plumbing fixtures & appliances, @ kitchen (n) tile floor vanity @ bathrooms (n) electrical gfci oulets, kitchen 8'2" x7 0" bahroom 5'5" x7' 4" all 9n) lighting shall be high efficiency | $20,000 |
| Jan 16, 2019 | Completed final sign-off Sep 2019 | 142 28th Av | remodel in-kind one kitchen, three decks, front stairs, back stairs, 3 bathrooms remodeled in-kind. 28 windows replaced in-kind.Details
remodel in-kind one kitchen, three decks, front stairs, back stairs, 3 bathrooms remodeled in-kind. 28 windows replaced in-kind. | $150,000 |
| Dec 7, 2018 | Completed final sign-off Oct 2019 | 400 Page St | renovation of 2 units. unit 107: kitchen and bath remodel incl (n) dw fixutres, (n) washer dryer. unit 203 - convert (e) studio to 1 bedroom, new kitchen, remodel bathroom, (n) dw, (n) washer dryer, (n) plumbing fixtures. no change to mech, no ext work, no fire alarm sprinkler, no structural workDetails
renovation of 2 units. unit 107: kitchen and bath remodel incl (n) dw fixutres, (n) washer dryer. unit 203 - convert (e) studio to 1 bedroom, new kitchen, remodel bathroom, (n) dw, (n) washer dryer, (n) plumbing fixtures. no change to mech, no ext work, no fire alarm sprinkler, no structural work | $45,000 |
| Nov 19, 2018 | Completed final sign-off Oct 2020 | 1156 Treat Av | unit b: expand & remodel kitchen, remodel (e) bathroom, add (1/2) bathDetails
unit b: expand & remodel kitchen, remodel (e) bathroom, add (1/2) bath | $40,000 |
| Nov 1, 2018 | Completed final sign-off Jun 2019 | 643 Webster St | unit #9 3rd fl. demo of non-structural walls, remodel kitchen, new plumbing fixtures, new lighting at (e) j. boxes add dishwashier and washer/dryer. remodel bathroom in kind no change to mechanical, no structural work or exterior workDetails
unit #9 3rd fl. demo of non-structural walls, remodel kitchen, new plumbing fixtures, new lighting at (e) j. boxes add dishwashier and washer/dryer. remodel bathroom in kind no change to mechanical, no structural work or exterior work | $20,000 |
| Oct 17, 2018 | Never finaled issued Oct 2018, no final | 601 Van Ness Av | remodel one bathroom, no change to walls & openings layout. demo carpet, install new flooring. new shower, vanity + medicine cabinet. all in kind.Details
remodel one bathroom, no change to walls & openings layout. demo carpet, install new flooring. new shower, vanity + medicine cabinet. all in kind. | $8,700 |
| Sep 27, 2018 | Completed final sign-off Feb 2019 | 3420 Market St | work in unit 10: remodel (1) kitchen and (1) bathroom. no work visible from the street. no alteration of wall, window, or door.Details
work in unit 10: remodel (1) kitchen and (1) bathroom. no work visible from the street. no alteration of wall, window, or door. | $20,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 601 Van Ness Av | demo bath replace floor and shower. replace vanity medicine cabinet. sheetrock repair. paint replace baseboards bath remodelDetails
demo bath replace floor and shower. replace vanity medicine cabinet. sheetrock repair. paint replace baseboards bath remodel | $12,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 1546 Vallejo St | in kind replace cabinets with new countertop, retile bathroom floor and fireplace surround, replace bathroom vanity and cabinet, replace wood flooring and carpet.Details
in kind replace cabinets with new countertop, retile bathroom floor and fireplace surround, replace bathroom vanity and cabinet, replace wood flooring and carpet. | $35,000 |
| Jun 5, 2018 | Completed final sign-off Jul 2018 | 2440 Green St | upgrade (e) bathroom. install new shower valve, tile, vanity. in toilet room, replacing corner sink.Details
upgrade (e) bathroom. install new shower valve, tile, vanity. in toilet room, replacing corner sink. | $1,500 |
| May 22, 2018 | Completed final sign-off Jul 2018 | 937 Clayton St | remove shower pan to upgrade more bigger shower pan. this is in (e) bathroom. upgrade shower & mitigate water issues. no change of use or occupancy.Details
remove shower pan to upgrade more bigger shower pan. this is in (e) bathroom. upgrade shower & mitigate water issues. no change of use or occupancy. | $1,500 |
| Mar 29, 2018 | Never finaled issued Mar 2018, no final | 8 Meda Av | replace existing bathroom vanity & toilet and approx 5 sq ft of tile floor.Details
replace existing bathroom vanity & toilet and approx 5 sq ft of tile floor. | $800 |
| Dec 12, 2017 | Completed final sign-off Feb 2019 | 1478 06th Av | revision to permit appln #201710242107. room & bath addition with deck.Details
revision to permit appln #201710242107. room & bath addition with deck. | $15,000 |
| Nov 14, 2017 | Never finaled issued Dec 2017, no final | 2659 23rd Av | reframing existing bath, living room closet, bedroom, hall at garage levelDetails
reframing existing bath, living room closet, bedroom, hall at garage level | $5,000 |
| Oct 19, 2017 | Completed final sign-off Feb 2018 | 2659 23rd Av | remodel 2 existing bathrooms and kitchen. same location, no moving walls, repair in kindDetails
remodel 2 existing bathrooms and kitchen. same location, no moving walls, repair in kind | $30,000 |
| May 30, 2017 | Expired or cancelled withdrawn Nov 2017 | 2659 23rd Av | interior remocel 1st fl, new living rm, poweder rm, laundry closet, bdrm, full bath. 2nd fl remodel e kitchen, remodel,enlarge ex bath, remove wall between din rm, living rm. replace all exisitng metal framed single glazed windows with new fiberglass dual glazed windowsDetails
interior remocel 1st fl, new living rm, poweder rm, laundry closet, bdrm, full bath. 2nd fl remodel e kitchen, remodel,enlarge ex bath, remove wall between din rm, living rm. replace all exisitng metal framed single glazed windows with new fiberglass dual glazed windows | $216,000 |
| Mar 7, 2017 | Never finaled issued Mar 2017, no final | 936 Stanyan St | remodeling existing bathroom, change new toilet, vanity, shower head divertor in same locationDetails
remodeling existing bathroom, change new toilet, vanity, shower head divertor in same location | $2,500 |
| Jul 12, 2016 | Completed final sign-off Dec 2016 | 1442 42nd Av | bathroom remodel and kitchen, new cabinets, tile. bath and kitchen remodelDetails
bathroom remodel and kitchen, new cabinets, tile. bath and kitchen remodel | $18,050 |
| Sep 4, 2015 | Never finaled issued Sep 2015, no final | 2040 Fell St | unit #4: demo current bathroom tile and tub, new tile for floors and walking shower, replace toilet and mixer valve, and new vanity. no structural alterations. n/a for maher.Details
unit #4: demo current bathroom tile and tub, new tile for floors and walking shower, replace toilet and mixer valve, and new vanity. no structural alterations. n/a for maher. | $18,000 |
| Aug 17, 2015 | Expired or cancelled cancelled Jan 2026 | 660 Sacramento St | 1st floor: redo bathroom to meet ada reqs. & upgrades. move toilet & 2 urinals in 2 bathroomsDetails
1st floor: redo bathroom to meet ada reqs. & upgrades. move toilet & 2 urinals in 2 bathrooms | $18,000 |
| Jun 1, 2015 | Never finaled issued Jul 2015, no final | 3451 18th St | change of use from r3 to r2. convert (e) storage space to additional dwelling unit within (e) envelop, unit to include: kitchen, closet, living space and full bathroom. comply with sfdbi, sf005. sprinklers deferred.Details
change of use from r3 to r2. convert (e) storage space to additional dwelling unit within (e) envelop, unit to include: kitchen, closet, living space and full bathroom. comply with sfdbi, sf005. sprinklers deferred. | $15,000 |
| Apr 9, 2015 | Completed final sign-off Apr 2015 | 485 Potrero Av | bathroom remodel at unit 'a' to comply with citation #201539531: replace sub-floor, new tile, replace light, vanity, mirror & toilet, no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel at unit 'a' to comply with citation #201539531: replace sub-floor, new tile, replace light, vanity, mirror & toilet, no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $2,500 |
| Sep 3, 2014 | Expired or cancelled expired Mar 2026 | 425 01st St | unit 3401: bath remodel. new tile on walls and floor. new vanity, new fan, light. demo existing fixtures. compliance with ordinance no. 155-13 not required.Details
unit 3401: bath remodel. new tile on walls and floor. new vanity, new fan, light. demo existing fixtures. compliance with ordinance no. 155-13 not required. | $12,000 |