Back to bathroom remodel contractors
Dawson - Clinton Gen Contr Corp
- Based in
- San Francisco
- On San Francisco permits
- Apr 2002 to Aug 2026
- Last 24 months
- 8 permits filed
205 permits since 2000: 130 completed, 10 in progress, 26 never finaled, 39 expired or cancelled.
Of the 26 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
54 bathroom remodel permits: 36 completed, 5 in progress, 5 never finaled, 8 expired or cancelled. Typically 1 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 1272 California St | revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1.Details
revision to pa#202607084677: interior remodel, reconfigure all (e) bathrooms & kitchen layout. (e) 5 front windows to be replaced in kind, reframe interior walls & doors. (n) 2 skylights. new mini split, water heater & elec throughout. no work in living, dining, foyer, entry stairs & bedroom#1. | $25,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1272 California St | remove lather and plaster in all bedrooms and hallways, install new sheetrock and insulation, kitchen and bathroom remodels,, plumbing and electrical, dining room ceiling install new insullation and sheetrock.exterior walls to be upgreded with minDetails
remove lather and plaster in all bedrooms and hallways, install new sheetrock and insulation, kitchen and bathroom remodels,, plumbing and electrical, dining room ceiling install new insullation and sheetrock.exterior walls to be upgreded with min | $75,000 |
| Jun 11, 2026 | In progress issued Aug 2026 | 516 Diamond St | revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street.Details
revision to bpa202603046908 to add foundation strengthening, add windows to basement storage, relocation of gas meter and stair extension to basement level, add lighting to extg, bedroom, garage and bath door. work not visible from street and work at 516a diamond street. | $50,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1274 California St | replace kitchen and barthroom remodel in kind, replace kitchen cabinets, bathroom cabinets, and all plumbing fixtures, new tiles in bathroom, new insulation in ceiling and walls. like for like remodels.Details
replace kitchen and barthroom remodel in kind, replace kitchen cabinets, bathroom cabinets, and all plumbing fixtures, new tiles in bathroom, new insulation in ceiling and walls. like for like remodels. | $55,000 |
| Oct 28, 2022 | Completed final sign-off Aug 2024 | 246 Carl St | removal of penthouse structure and addition of skylight to restore to last approved conditions under pa# 201603081422. interior renovation on the 4th floor:a) demolition of extg walls, doors, and millwork. b) conversion of extg bathroom to sauna.Details
removal of penthouse structure and addition of skylight to restore to last approved conditions under pa# 201603081422. interior renovation on the 4th floor:a) demolition of extg walls, doors, and millwork. b) conversion of extg bathroom to sauna. | $50,000 |
| Oct 5, 2022 | In progress issued Sep 2025 | 585 Ortega St | vertical and horizontal expansion. renovation and gut interior remodel of (e) 2-story, single family home. work includes 1 story vertical addition, partial expansion of front facade, and rear addition. (n) 3rd fl includes 2 (n) bedrooms and 2 (n) bathrooms, as well as (n) office space.Details
vertical and horizontal expansion. renovation and gut interior remodel of (e) 2-story, single family home. work includes 1 story vertical addition, partial expansion of front facade, and rear addition. (n) 3rd fl includes 2 (n) bedrooms and 2 (n) bathrooms, as well as (n) office space. | $1,000,000 |
| Oct 14, 2020 | Expired or cancelled expired Apr 2026 | 368 San Carlos St | remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unitDetails
remodel in kind bathroom (6x12.9), kitchen (11.8x12.9) and laundry room (10.1x5.4). full electrical and plumbing upgrade throughout the unit | $25,000 |
| Mar 16, 2020 | Never finaled issued Aug 2020, no final | 209 Elsie St | interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement.Details
interior remodel at 3 floors including (e) kitchen & baths. demo (1) bath at 2nd fl, add (1) bath & (1) bed at 1st fl. full foundation replacement. | $300,000 |
| Jan 22, 2020 | Expired or cancelled expired Jan 2025 | 366 San Carlos St | remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work.Details
remodel of unit #366 on the 3rd fl. replace kitchen cabinets in kind. interior remodel of two unit building per plans. demo (e) bedroom wall to create new open living room and relocate 2nd bedroom to front. add second bathroom at (e) dining nook. no exterior work. | $10,000 |
| Jun 27, 2018 | Completed final sign-off Sep 2019 | 2752 Filbert St | 1/f: int renovation of (e) bath. new wall & ceiling paint for whole flr. 2/f: spacial rearrangement done w/new kitchen, living rm & great rm with relocation of din rm. new coffered ceiling added to the grt rm. new wall paneling and new hardwood flr. new wall and ceiling paint for whole flr.Details
1/f: int renovation of (e) bath. new wall & ceiling paint for whole flr. 2/f: spacial rearrangement done w/new kitchen, living rm & great rm with relocation of din rm. new coffered ceiling added to the grt rm. new wall paneling and new hardwood flr. new wall and ceiling paint for whole flr. | $35,000 |
| Aug 31, 2016 | Completed final sign-off Feb 2021 | 246 Carl St | interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor.Details
interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor. | $300,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3923 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3925 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| Aug 9, 2016 | Expired or cancelled cancelled Oct 2017 | 3921 19th St | remodel 1 kitchen & 1 bathroom. no structural / wall changes.Details
remodel 1 kitchen & 1 bathroom. no structural / wall changes. | $20,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x.Details
front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x. | $20,000 |
| Mar 8, 2016 | Completed final sign-off Mar 2021 | 246 Carl St | vertical addition at 4th floor. add (3) bedrooms. add (3) bathrooms. addition of roof decks.Details
vertical addition at 4th floor. add (3) bedrooms. add (3) bathrooms. addition of roof decks. | $220,000 |
| Feb 18, 2016 | Completed final sign-off Mar 2021 | 246 Carl St | horizontal addition at rear. extend bedrooms, add full bathroom.Details
horizontal addition at rear. extend bedrooms, add full bathroom. | $240,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150kDetails
rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150k | $35,000 |
| Sep 29, 2015 | Never finaled issued Dec 2016, no final | 80 Sycamore St | revision to app#201409126253. eliminate all plmg fixtures in level 2 bedroom 2 and bath 2. increase voluation by $150,000.00Details
revision to app#201409126253. eliminate all plmg fixtures in level 2 bedroom 2 and bath 2. increase voluation by $150,000.00 | $150,000 |
| Jul 27, 2015 | Completed final sign-off Feb 2021 | 246 Carl St | remdoel 2 kitchens and 2 bathrooms in kind. repalce insulation and drywalls at affected areas. new caswork, finishes, plubing and lighting fixtures; to comply with cec150.0(k)3 & 5Details
remdoel 2 kitchens and 2 bathrooms in kind. repalce insulation and drywalls at affected areas. new caswork, finishes, plubing and lighting fixtures; to comply with cec150.0(k)3 & 5 | $100,000 |
| Jul 23, 2015 | Completed final sign-off Apr 2016 | 26 Buena Vista Tr | replace kitchen cabinets, master bathroom fixtures and flooring, powder room in kind, new toilet and vanity and 13 windows to be replaced with wood windows in kind. floor finishingDetails
replace kitchen cabinets, master bathroom fixtures and flooring, powder room in kind, new toilet and vanity and 13 windows to be replaced with wood windows in kind. floor finishing | $250,000 |
| Oct 1, 2014 | Completed final sign-off Apr 2017 | 80 Sycamore St | addition of penthouse @ level 4 with roof deck with one bedroom and bathroom (add one story total 4 stories)Details
addition of penthouse @ level 4 with roof deck with one bedroom and bathroom (add one story total 4 stories) | $175,000 |
| Sep 22, 2014 | Completed final sign-off Oct 2017 | 3847 18th St | correct n.o.v. #201310261. remove illegal dwelling unit at basement. remove all unapproved wiring, plmb, kitchen and bathroom at basement. remove plywood sheathing at 1st floor to restore original stair access from 1st floor to basement.Details
correct n.o.v. #201310261. remove illegal dwelling unit at basement. remove all unapproved wiring, plmb, kitchen and bathroom at basement. remove plywood sheathing at 1st floor to restore original stair access from 1st floor to basement. | $5,000 |
| Jan 14, 2014 | Completed final sign-off Feb 2015 | 2555 Larkin St | interior remodel at unit #2: replace windows in-kind throughout. refinish existing wood flooring. replace existing bathtub and toilet at master bath. install recessed cans at bedroom. upgrade interior finishes and new paint throughout. install new furnace unit at storage room.Details
interior remodel at unit #2: replace windows in-kind throughout. refinish existing wood flooring. replace existing bathtub and toilet at master bath. install recessed cans at bedroom. upgrade interior finishes and new paint throughout. install new furnace unit at storage room. | $35,000 |
| Dec 3, 2013 | Completed final sign-off May 2018 | 1136 De Haro St | 210 sq. ft horizontal addition, (n) kitchen, dinning room. powder room & stair @ 2nd flr. 1300 sq.ft vertical addition, (n) bedrooms, closets, bathroom powder room & stair @ 3rd flr. (n) roof deck.Details
210 sq. ft horizontal addition, (n) kitchen, dinning room. powder room & stair @ 2nd flr. 1300 sq.ft vertical addition, (n) bedrooms, closets, bathroom powder room & stair @ 3rd flr. (n) roof deck. | $80,000 |
| Nov 26, 2013 | Completed final sign-off Jan 2015 | 1450 Greenwich St | #202:remodel kitchen, bath, and living areas including finishes, lighting casework and plumbing.Details
#202:remodel kitchen, bath, and living areas including finishes, lighting casework and plumbing. | $45,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2014 | 2945 Scott St | remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garageDetails
remodel existing bathroom, new door and railing at existing 3rd floor roof deck. seismic improvements at garage | $50,000 |
| Jul 30, 2013 | Completed final sign-off Jan 2014 | 1 Hawthorne St | unit 24d: new dropped ceilings in living, master bed and powder. replace all finishes in powder room. new lighting fixtures in living, dining, kitchen, hallway, master bed and bath and powder room.Details
unit 24d: new dropped ceilings in living, master bed and powder. replace all finishes in powder room. new lighting fixtures in living, dining, kitchen, hallway, master bed and bath and powder room. | $60,000 |
| Jun 27, 2013 | Completed final sign-off Jan 2014 | 301 Mission St | unit 56 a:kitchen renovation including the removal of a few walls, new cabinetry, electrical and plumbing, small bath revision. sprinklers under separate permit.Details
unit 56 a:kitchen renovation including the removal of a few walls, new cabinetry, electrical and plumbing, small bath revision. sprinklers under separate permit. | $10,000 |
| Nov 29, 2012 | Completed final sign-off Aug 2013 | 44 Diamond St | seismic upgrade, (n) siliding doors at rear elevation, 2 skylights, fixtures, interior walls & int stair. (n) deck, eliminate (1) bedroom & (1) bathroom on upper floor, add (1) bedroom & (1) bathroom on lower floor, (n) plbg & elec fixtures.Details
seismic upgrade, (n) siliding doors at rear elevation, 2 skylights, fixtures, interior walls & int stair. (n) deck, eliminate (1) bedroom & (1) bathroom on upper floor, add (1) bedroom & (1) bathroom on lower floor, (n) plbg & elec fixtures. | $175,000 |
| May 23, 2012 | Never finaled issued May 2012, no final | 484 Roosevelt Wy | one guest bath remodel: remove and replace plumbing fixtures. remove and replace tiles. new shower pan. remove and replace guest bath door. ipgrade lighting to comply with t-24.Details
one guest bath remodel: remove and replace plumbing fixtures. remove and replace tiles. new shower pan. remove and replace guest bath door. ipgrade lighting to comply with t-24. | $30,000 |
| May 8, 2012 | Completed final sign-off Feb 2013 | 645 Howard St | demolish non structural interior walls per plans. reconfigure walk-in closet. new wood flooring throughout. note:new kitchen and 2 bathrooms remodel under app#201204047557Details
demolish non structural interior walls per plans. reconfigure walk-in closet. new wood flooring throughout. note:new kitchen and 2 bathrooms remodel under app#201204047557 | $10,000 |
| Apr 4, 2012 | Completed final sign-off Feb 2013 | 645 Howard St | unit 20c: remove and replace (e) cabinets in kitchen and two bathrooms. remove and replace (e) plumbing fixtures in kitchen and two bathrooms. *min. 50% of kitchen light watts to be high efficacy lights. *provide high efficacy lights or "manual on" occupancy sensor in bathroomsDetails
unit 20c: remove and replace (e) cabinets in kitchen and two bathrooms. remove and replace (e) plumbing fixtures in kitchen and two bathrooms. *min. 50% of kitchen light watts to be high efficacy lights. *provide high efficacy lights or "manual on" occupancy sensor in bathrooms | $85,000 |
| Jul 15, 2011 | Completed final sign-off Jun 2012 | 1136 De Haro St | new interior stairs, (2) new bathrooms & bedroom on 1st floor. new mechanical equipment, new lighting, new deck.Details
new interior stairs, (2) new bathrooms & bedroom on 1st floor. new mechanical equipment, new lighting, new deck. | $30,000 |
| Jan 26, 2011 | Completed final sign-off May 2012 | 2518 Buchanan St | 3 bathrooms remodels- upgrade electrical and plumbing; new interior cabinets, finishes and fixtures, no structural changes on 2nd & 3rd floors new lighting comply with cec 150(k), no walls relocationDetails
3 bathrooms remodels- upgrade electrical and plumbing; new interior cabinets, finishes and fixtures, no structural changes on 2nd & 3rd floors new lighting comply with cec 150(k), no walls relocation | $60,000 |
| Aug 26, 2010 | Expired or cancelled expired Oct 2014 | 2240 Hyde St | work in unit 10: 1 full kitchen remodel and 3 baths remodels. replace cabinetry, upgrade elec,plumb, interior finishes, fixtures, appliances. replace existing windows in kitchen and powder room. no structural work. not facing public sheet, u factor=0.40 max. replace in kind, no structural changes.Details
work in unit 10: 1 full kitchen remodel and 3 baths remodels. replace cabinetry, upgrade elec,plumb, interior finishes, fixtures, appliances. replace existing windows in kitchen and powder room. no structural work. not facing public sheet, u factor=0.40 max. replace in kind, no structural changes. | $190,000 |
| Apr 20, 2010 | Completed final sign-off May 2010 | 2340 Larkin St | unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414Details
unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414 | $8,000 |
| Mar 2, 2010 | Completed final sign-off Sep 2010 | 2340 Larkin St | 2 bathroom remodel. upgrade plumbing, electrical and finishes. replace 2 existing windows in bathrooms. to comply with t-24, by providing high efficacy or "manual on" occupancy sensor. no window & no door & no wall work (except windows in bathrooms)Details
2 bathroom remodel. upgrade plumbing, electrical and finishes. replace 2 existing windows in bathrooms. to comply with t-24, by providing high efficacy or "manual on" occupancy sensor. no window & no door & no wall work (except windows in bathrooms) | $55,000 |
| Oct 9, 2009 | Completed final sign-off Dec 2009 | 1215 Greenwich St | bathroom remodel, no new plumbing, no new elec, change tile, replace shower pan, new sheetrock walls, ceiling , replace plumb/elec, fan existing, no lightingDetails
bathroom remodel, no new plumbing, no new elec, change tile, replace shower pan, new sheetrock walls, ceiling , replace plumb/elec, fan existing, no lighting | $20,000 |
| Sep 30, 2009 | Never finaled issued Sep 2009, no final | 398 Pennsylvania Av | revision to appl. 200709122410. addition of mechanical, closet elevator & av closets in garage. reorganized of (e) stairs and related elements in rear yard. elimination (voluntary) of grabbars in 2nd floor bath. elimination of 4th fl. hwh in mech closet. addition of steam unit.Details
revision to appl. 200709122410. addition of mechanical, closet elevator & av closets in garage. reorganized of (e) stairs and related elements in rear yard. elimination (voluntary) of grabbars in 2nd floor bath. elimination of 4th fl. hwh in mech closet. addition of steam unit. | |
| Sep 16, 2008 | Completed final sign-off Jul 2009 | 1549 Willard St | 1 kitchen & 1 bathroom remodel. remove & install new drywall. upgrade / relocate electrical & plumbing. install new flooring, cabinetry, finishes, fixtures & appliances. upgrade plumbing, electrical & finishes in bathroom. no structural or wall changes. min 50% of kitchen lighting wattage shall beDetails
1 kitchen & 1 bathroom remodel. remove & install new drywall. upgrade / relocate electrical & plumbing. install new flooring, cabinetry, finishes, fixtures & appliances. upgrade plumbing, electrical & finishes in bathroom. no structural or wall changes. min 50% of kitchen lighting wattage shall be | $45,000 |
| Sep 4, 2008 | Never finaled issued Sep 2009, no final | 1117 Church St | addition of 2 dormers at (e) roof, removal of portion of (e) roof to create new exterior deck at rear of building. reconfigure interior walls to create new full bathroom, spa & master bedroom @ 4th floor within (e) attic. no work at 1119 church, 1st & 2nd floors. no work on 3rd floor (1117 church).Details
addition of 2 dormers at (e) roof, removal of portion of (e) roof to create new exterior deck at rear of building. reconfigure interior walls to create new full bathroom, spa & master bedroom @ 4th floor within (e) attic. no work at 1119 church, 1st & 2nd floors. no work on 3rd floor (1117 church). | $95,000 |
| May 29, 2008 | Completed final sign-off Apr 2009 | 4330 21st St | kitchen & bathroom remodel. remove drywall as req. upgrade electrical. replumb fixtures.instal new drywall as req. install new kitchen cabinets, fixtures & applicances. no structural changes. no removal of walls.Details
kitchen & bathroom remodel. remove drywall as req. upgrade electrical. replumb fixtures.instal new drywall as req. install new kitchen cabinets, fixtures & applicances. no structural changes. no removal of walls. | $50,000 |
| May 20, 2008 | Completed final sign-off Apr 2009 | 4330 21st St | upper fl: remodel existing bathroom & kitchen, modify existing lightwell, remove existing wood deck at rear & replace w/ smaller waterproof deck. lower fl: rebuild stair to lower fl for code compliance, add master suite within existing footprint, add 70 sf under new waterproof deck.Details
upper fl: remodel existing bathroom & kitchen, modify existing lightwell, remove existing wood deck at rear & replace w/ smaller waterproof deck. lower fl: rebuild stair to lower fl for code compliance, add master suite within existing footprint, add 70 sf under new waterproof deck. | $195,000 |
| Mar 4, 2008 | Completed final sign-off Apr 2008 | 350 Brannan St | ground floor - revision to appl #200802215270 : to change location of sink in mens bathroom. forego demolition of existing shower.Details
ground floor - revision to appl #200802215270 : to change location of sink in mens bathroom. forego demolition of existing shower. | |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 350 Brannan St | demo floor finishes & limited non-bearing partition walls. refurbish bathroom & kitchen. new non bearing partitions. replace most lighting & fixtures. addition of some power distribution, relocate storefront.Details
demo floor finishes & limited non-bearing partition walls. refurbish bathroom & kitchen. new non bearing partitions. replace most lighting & fixtures. addition of some power distribution, relocate storefront. | $80,000 |
| Jan 22, 2008 | Expired or cancelled expired Oct 2010 | 2207 Scott St | remove and replace foundation at rear of bldg. update interior finishes, add wall between garage and hallway. add 3/4 bath, add 5 new windows to rear of bldg. add door and stair to rear of bldg. all lighting to comply with title 24.Details
remove and replace foundation at rear of bldg. update interior finishes, add wall between garage and hallway. add 3/4 bath, add 5 new windows to rear of bldg. add door and stair to rear of bldg. all lighting to comply with title 24. | $200,000 |
| Jan 4, 2008 | Completed final sign-off Jan 2008 | 1438 Jackson St | revision to appl #200407088305-s1: 1st floor: mech,closet/wall infills relocate door/remove of coat cl, kitchen layout. 2nd floor:change in kitchen layout/add'l steps/change in bahtroom layout,relocate washer/dryer. 3rd floor:change kitchen layout/coat cl/powder rm. 4th floor:change bathroom layout.Details
revision to appl #200407088305-s1: 1st floor: mech,closet/wall infills relocate door/remove of coat cl, kitchen layout. 2nd floor:change in kitchen layout/add'l steps/change in bahtroom layout,relocate washer/dryer. 3rd floor:change kitchen layout/coat cl/powder rm. 4th floor:change bathroom layout. | |
| Nov 1, 2006 | Completed final sign-off Apr 2007 | 900 Bush St | unit # 908-kitchen remodel-replace cabinets; bathroom remodels-replace cabinets, fixtures & one shower replacement.Details
unit # 908-kitchen remodel-replace cabinets; bathroom remodels-replace cabinets, fixtures & one shower replacement. | $50,000 |
| Feb 15, 2006 | Completed final sign-off Apr 2007 | 101 Harrison St | demo (e) walls, kitchen, bath (interior only), construct newly configured bath, kitchen, bedroomDetails
demo (e) walls, kitchen, bath (interior only), construct newly configured bath, kitchen, bedroom | $94,000 |
| Oct 13, 2005 | Completed final sign-off Feb 2006 | 2820 Pacific Av | m bath remodel n-tile, n fixtures n-tile -n-paint change trim on light fixtures, bath remodel no structural work, provide flourescent light fixtureDetails
m bath remodel n-tile, n fixtures n-tile -n-paint change trim on light fixtures, bath remodel no structural work, provide flourescent light fixture | $50,000 |
| Apr 28, 2005 | Completed final sign-off Feb 2006 | 2820 Pacific Av | remodel 3 bathrooms new electrical no fixtures no tile no drywall no plumbing, all plumbing to remaiDetails
remodel 3 bathrooms new electrical no fixtures no tile no drywall no plumbing, all plumbing to remai | $100,000 |
| Jun 16, 2004 | Expired or cancelled expired Dec 2006 | 519 Natoma St | replace kitchen &bath in 4 studio apt. upgrade elec&plumb.drywall as req.Details
replace kitchen &bath in 4 studio apt. upgrade elec&plumb.drywall as req. | $60,000 |
| Jun 10, 2003 | Completed final sign-off Oct 2003 | 439 17th Av | kitchen and bathroom remodel. new electrical,plumbing, cabinets, fixtures per plan. same size/locatiDetails
kitchen and bathroom remodel. new electrical,plumbing, cabinets, fixtures per plan. same size/locati | $35,000 |