Block 0096, lot 056
2340 Larkin St
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 2,103 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2010 | Completed final sign-off Sep 2010 | 2340 Larkin St | Dawson - Clinton Gen Contr Corp | revision to 201004200665. reframe window openings for in kind window replacment in kitchen. not visible from street. no wall or structural changesDetails
revision to 201004200665. reframe window openings for in kind window replacment in kitchen. not visible from street. no wall or structural changes | $500 |
| Apr 20, 2010 | Completed final sign-off May 2010 | 2340 Larkin St | Dawson - Clinton Gen Contr Corp | unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414Details
unit# 2- remove and replace footing at ground level bathroom west wall. shoring and underpinning as required. remove wall in bathroom and pour new concrete floor. for structural upgrade only, bathroom remodel and new window under separate permit # 2010.03.02.7414 | $8,000 |
| Apr 20, 2010 | Completed final sign-off Sep 2010 | 2340 Larkin St | Dawson - Clinton Gen Contr Corp | unit #2- 2nd fl. full kitchen remodel, new cab, upgrade electrical,plbg, finishes and appliances. replace (e) windows in kitchen not visible from street. no wall or structural changes. lighting to comply w/ title 24. u-factor =0.4, at least 50% high efficacy lighting, no struct work,replace in kindDetails
unit #2- 2nd fl. full kitchen remodel, new cab, upgrade electrical,plbg, finishes and appliances. replace (e) windows in kitchen not visible from street. no wall or structural changes. lighting to comply w/ title 24. u-factor =0.4, at least 50% high efficacy lighting, no struct work,replace in kind | $40,000 |
| Mar 2, 2010 | Completed final sign-off Sep 2010 | 2340 Larkin St | Dawson - Clinton Gen Contr Corp | 2 bathroom remodel. upgrade plumbing, electrical and finishes. replace 2 existing windows in bathrooms. to comply with t-24, by providing high efficacy or "manual on" occupancy sensor. no window & no door & no wall work (except windows in bathrooms)Details
2 bathroom remodel. upgrade plumbing, electrical and finishes. replace 2 existing windows in bathrooms. to comply with t-24, by providing high efficacy or "manual on" occupancy sensor. no window & no door & no wall work (except windows in bathrooms) | $55,000 |
| Aug 17, 2007 | Completed final sign-off Sep 2007 | 2340 Larkin St | Maars Woodworking And Building Inc | repair dryrot at back coner building (3'x20") location of work : 8' above ground & extending 20" up beyond , 3' wide.Details
repair dryrot at back coner building (3'x20") location of work : 8' above ground & extending 20" up beyond , 3' wide. | $4,400 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dawson - Clinton Gen Contr Corp (4), Maars Woodworking And Building Inc
- Engineers
- Vahid Sattary
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.