Back to kitchen remodel contractors
David Juricic Constructon
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2004 to Mar 2019
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2012 | Never finaled issued Oct 2012, no final | 1270 Fulton St | ground floor unit - remodel kitchen: cabinets, appliances, anglesteps, fluorescent lights, replace water heaters, 3 window.Details
ground floor unit - remodel kitchen: cabinets, appliances, anglesteps, fluorescent lights, replace water heaters, 3 window. | $21,000 |
| Jan 27, 2011 | Completed final sign-off Jun 2011 | 1266 Fulton St | remodel kitchen:replace water heater with tankless, elminates non load bearing false wall and lower portion of 2nd wall(nonload).replace 2 windows and cabinets and tile floor. same for same windows.Details
remodel kitchen:replace water heater with tankless, elminates non load bearing false wall and lower portion of 2nd wall(nonload).replace 2 windows and cabinets and tile floor. same for same windows. | $23,000 |
| Jun 18, 2009 | Completed final sign-off Aug 2009 | 650 Delancey St | remove & replace flloring, carpet & hardwood, kitchen cabinets, applicances, counter top, bathrooms tiles with marble and bathroom countertops with granite, paint interior walls. replace skylights.Details
remove & replace flloring, carpet & hardwood, kitchen cabinets, applicances, counter top, bathrooms tiles with marble and bathroom countertops with granite, paint interior walls. replace skylights. | $45,000 |
| Sep 21, 2007 | Completed final sign-off Feb 2008 | 340 Prentiss St | remodel kitchen-new cabinets & counters. open wall between kitchen & living room. install 4x12 header 10' long with double studs at each end. remodel bath-same floor plan. plumbing and electrical under separate permit.Details
remodel kitchen-new cabinets & counters. open wall between kitchen & living room. install 4x12 header 10' long with double studs at each end. remodel bath-same floor plan. plumbing and electrical under separate permit. | $20,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 1001 Pine St | remodel condo, replace kitchen cabinet, new counters,lights, bath remodel,new tile, replace fridgeDetails
remodel condo, replace kitchen cabinet, new counters,lights, bath remodel,new tile, replace fridge | $20,000 |
| Sep 28, 2004 | Completed final sign-off Dec 2004 | 1001 Pine St | install new kitchen cabinets, new fridge surround wall/island cntr,remodel bath, ceiling lite lrDetails
install new kitchen cabinets, new fridge surround wall/island cntr,remodel bath, ceiling lite lr | $18,000 |