Back to bathroom remodel contractors
David Juricic Constructon
- Based in
- South San Francisco
- On San Francisco permits
- Sep 2004 to Mar 2019
- Last 24 months
- 0 permits filed
19 permits since 2000: 18 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2013 | Completed final sign-off Aug 2013 | 2040 Franklin St | bathroom remodel, new vanity & faucet, replace shower & valve.Details
bathroom remodel, new vanity & faucet, replace shower & valve. | $9,500 |
| Jun 16, 2011 | Completed final sign-off Dec 2011 | 1270 Fulton St | replace tub and shower valve, new vanity, sink and faucet, replace existing fan, new like for like window, tile. bath remodel same as original. no toilet. window ufactur 0.4 max. bath high eff lighting or occ sensorDetails
replace tub and shower valve, new vanity, sink and faucet, replace existing fan, new like for like window, tile. bath remodel same as original. no toilet. window ufactur 0.4 max. bath high eff lighting or occ sensor | $9,000 |
| May 14, 2010 | Completed final sign-off Sep 2010 | 6 Locksley Av | unit #2c: widen doorway @ bathroom. remove portion of hall closet. replace (e) shower & sink. field verify that there are no sprinklers in the unit...if there is submit sprinkler plan under separate permit.Details
unit #2c: widen doorway @ bathroom. remove portion of hall closet. replace (e) shower & sink. field verify that there are no sprinklers in the unit...if there is submit sprinkler plan under separate permit. | $8,500 |
| Jun 18, 2009 | Completed final sign-off Aug 2009 | 650 Delancey St | remove & replace flloring, carpet & hardwood, kitchen cabinets, applicances, counter top, bathrooms tiles with marble and bathroom countertops with granite, paint interior walls. replace skylights.Details
remove & replace flloring, carpet & hardwood, kitchen cabinets, applicances, counter top, bathrooms tiles with marble and bathroom countertops with granite, paint interior walls. replace skylights. | $45,000 |
| Sep 21, 2007 | Completed final sign-off Feb 2008 | 340 Prentiss St | remodel kitchen-new cabinets & counters. open wall between kitchen & living room. install 4x12 header 10' long with double studs at each end. remodel bath-same floor plan. plumbing and electrical under separate permit.Details
remodel kitchen-new cabinets & counters. open wall between kitchen & living room. install 4x12 header 10' long with double studs at each end. remodel bath-same floor plan. plumbing and electrical under separate permit. | $20,000 |
| Sep 20, 2005 | Completed final sign-off Dec 2005 | 1001 Pine St | remodel condo, replace kitchen cabinet, new counters,lights, bath remodel,new tile, replace fridgeDetails
remodel condo, replace kitchen cabinet, new counters,lights, bath remodel,new tile, replace fridge | $20,000 |
| Sep 28, 2004 | Completed final sign-off Dec 2004 | 1001 Pine St | install new kitchen cabinets, new fridge surround wall/island cntr,remodel bath, ceiling lite lrDetails
install new kitchen cabinets, new fridge surround wall/island cntr,remodel bath, ceiling lite lr | $18,000 |