Back to kitchen remodel contractors
Daniele Construction
- Based in
- San Bruno
- On San Francisco permits
- Jul 2000 to Sep 2026
- Last 24 months
- 2 permits filed
25 permits since 2000: 22 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2022 | Completed final sign-off May 2023 | 66 Digby St | complete renovation of 5 bathrooms, kitchen, and laundry room. replacement of 4 existing windows and 3 existing exterior doors. no windows of doors viewed from public way. windows shall be migard tuscany. two new furnaces with new ducts shall be installed. garage to be sheetrocked. removal andDetails
complete renovation of 5 bathrooms, kitchen, and laundry room. replacement of 4 existing windows and 3 existing exterior doors. no windows of doors viewed from public way. windows shall be migard tuscany. two new furnaces with new ducts shall be installed. garage to be sheetrocked. removal and | $175,000 |
| Sep 12, 2019 | Completed final sign-off Jul 2020 | 319 11th Av | remodel kitchen and bathroom. replacement of 16 windows. windows at front (6) to be marvin ultimate, rear 10 to be milguard tuscony vinyl. all windows like-for-like. replace furnace and ducts. add two 14" sun-tunnels.Details
remodel kitchen and bathroom. replacement of 16 windows. windows at front (6) to be marvin ultimate, rear 10 to be milguard tuscony vinyl. all windows like-for-like. replace furnace and ducts. add two 14" sun-tunnels. | $85,000 |
| Jan 14, 2015 | Completed final sign-off Mar 2016 | 308 Cayuga Av | interior remodel both floor & seismic upgrades. 1st floor: new bath, new fam room, new master bath, new master bedroom, remove laundry room, relcoate furnace, w.h. dryer/washer. 2nd floor remodel kitchen & bath & dining & infill light court. replace front from (e) masonry to (n) stucco.Details
interior remodel both floor & seismic upgrades. 1st floor: new bath, new fam room, new master bath, new master bedroom, remove laundry room, relcoate furnace, w.h. dryer/washer. 2nd floor remodel kitchen & bath & dining & infill light court. replace front from (e) masonry to (n) stucco. | $75,000 |
| Nov 21, 2014 | Completed final sign-off Mar 2015 | 308 Cayuga Av | demolition of interior including plaster, kitchen, baths, rooms prior to plan submittal for renovation. soft demo finishes onlyDetails
demolition of interior including plaster, kitchen, baths, rooms prior to plan submittal for renovation. soft demo finishes only | $10,000 |
| Aug 21, 2000 | Completed final sign-off Dec 2000 | 798 Joost Av | remodel kitchen, cabinets, sheetrock, electrical, plumbing, tile work, new floors, coutnersDetails
remodel kitchen, cabinets, sheetrock, electrical, plumbing, tile work, new floors, coutners | $25,000 |
| Jul 13, 2000 | Completed final sign-off Mar 2002 | 83 Warren Dr | kitchen and bathroom remodeling to comply w/ housing notice of violationDetails
kitchen and bathroom remodeling to comply w/ housing notice of violation | $16,000 |