Back to bathroom remodel contractors
Daniele Construction
- Based in
- San Bruno
- On San Francisco permits
- Jul 2000 to Sep 2026
- Last 24 months
- 2 permits filed
25 permits since 2000: 22 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 0 days from filing to permit and 412 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2026 | In progress issued Jun 2026 | 1244 Broadway | replacement of brick foundation to (n) concrete foundation and slab. complete remodel of bathroom, addition of laundry room, removal of wall furnace and installation of new forced air furnace, remove tank water heater and replace with tank . flood damaged walls and floors, repair flood damagedDetails
replacement of brick foundation to (n) concrete foundation and slab. complete remodel of bathroom, addition of laundry room, removal of wall furnace and installation of new forced air furnace, remove tank water heater and replace with tank . flood damaged walls and floors, repair flood damaged | $88,500 |
| Feb 15, 2022 | Completed final sign-off May 2023 | 66 Digby St | complete renovation of 5 bathrooms, kitchen, and laundry room. replacement of 4 existing windows and 3 existing exterior doors. no windows of doors viewed from public way. windows shall be migard tuscany. two new furnaces with new ducts shall be installed. garage to be sheetrocked. removal andDetails
complete renovation of 5 bathrooms, kitchen, and laundry room. replacement of 4 existing windows and 3 existing exterior doors. no windows of doors viewed from public way. windows shall be migard tuscany. two new furnaces with new ducts shall be installed. garage to be sheetrocked. removal and | $175,000 |
| Jan 31, 2020 | Completed final sign-off Apr 2021 | 243 Hearst Av | remodel top floor bathroom: new electrical, fan with humidistat, led lighting, new tub and fixtures. new pressure balanced tub shower valve, 18 gpm max. new toilet 1.28 gpm max. new lavy faucet 1.2 gpm max. new tile wall and floor. new temperd glass enclosure for tub.Details
remodel top floor bathroom: new electrical, fan with humidistat, led lighting, new tub and fixtures. new pressure balanced tub shower valve, 18 gpm max. new toilet 1.28 gpm max. new lavy faucet 1.2 gpm max. new tile wall and floor. new temperd glass enclosure for tub. | $3,000 |
| Sep 12, 2019 | Completed final sign-off Jul 2020 | 319 11th Av | remodel kitchen and bathroom. replacement of 16 windows. windows at front (6) to be marvin ultimate, rear 10 to be milguard tuscony vinyl. all windows like-for-like. replace furnace and ducts. add two 14" sun-tunnels.Details
remodel kitchen and bathroom. replacement of 16 windows. windows at front (6) to be marvin ultimate, rear 10 to be milguard tuscony vinyl. all windows like-for-like. replace furnace and ducts. add two 14" sun-tunnels. | $85,000 |
| Jan 14, 2015 | Completed final sign-off Mar 2016 | 308 Cayuga Av | interior remodel both floor & seismic upgrades. 1st floor: new bath, new fam room, new master bath, new master bedroom, remove laundry room, relcoate furnace, w.h. dryer/washer. 2nd floor remodel kitchen & bath & dining & infill light court. replace front from (e) masonry to (n) stucco.Details
interior remodel both floor & seismic upgrades. 1st floor: new bath, new fam room, new master bath, new master bedroom, remove laundry room, relcoate furnace, w.h. dryer/washer. 2nd floor remodel kitchen & bath & dining & infill light court. replace front from (e) masonry to (n) stucco. | $75,000 |
| Nov 21, 2014 | Completed final sign-off Mar 2015 | 308 Cayuga Av | demolition of interior including plaster, kitchen, baths, rooms prior to plan submittal for renovation. soft demo finishes onlyDetails
demolition of interior including plaster, kitchen, baths, rooms prior to plan submittal for renovation. soft demo finishes only | $10,000 |
| Jul 13, 2000 | Completed final sign-off Mar 2002 | 83 Warren Dr | kitchen and bathroom remodeling to comply w/ housing notice of violationDetails
kitchen and bathroom remodeling to comply w/ housing notice of violation | $16,000 |