Back to kitchen remodel contractors
Daniel Kelly Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2016 to Aug 2026
- Last 24 months
- 4 permits filed
31 permits since 2000: 26 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 1 never finaled, 1 expired or cancelled. Typically 54 days from filing to permit and 471 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2025 | Expired or cancelled expired Aug 2026 | 304 Eureka St | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $80,000 |
| Dec 8, 2023 | Completed final sign-off Mar 2024 | 424 Blanken Av | remodel bath and kitchen in kind add wall to storage area. revision to bpa 202307252917. two replacement windows at rear facade (same size and location) u=.30maxDetails
remodel bath and kitchen in kind add wall to storage area. revision to bpa 202307252917. two replacement windows at rear facade (same size and location) u=.30max | $4,000 |
| Jul 25, 2023 | Completed final sign-off Mar 2024 | 424 Blanken Av | remodel kitchen and bathroom, same configuration.Details
remodel kitchen and bathroom, same configuration. | $40,000 |
| Dec 17, 2021 | Completed final sign-off May 2023 | 4316 23rd St | main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to officeDetails
main fl: remodel kitchen, bath, 1/2 bath addition, replace stair to upper level, convert (e) bdrm to new family room, (e) dining to new bdrm [(e) window is conforming egress); upper fl: remodel (e) bath; lower fl: convert (e) wine rm to office | $200,000 |
| Jan 29, 2021 | Completed final sign-off Jun 2023 | 38 Hearst Av | remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath.Details
remodel lower level washer/dryer room and bedroom. add bathroom at lower level. remodel (e) upstair kitchen and bath. | $30,000 |
| Aug 24, 2018 | Completed final sign-off Aug 2024 | 131 03rd Av | rear yard addition (horizontal) remodel interior all floors including existing kitchen (no additional kitchen) and remodel habitable space @ 1st floor.Details
rear yard addition (horizontal) remodel interior all floors including existing kitchen (no additional kitchen) and remodel habitable space @ 1st floor. | $300,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening.Details
remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening. | $22,500 |
| Apr 25, 2017 | Never finaled issued Mar 2018, no final | 153 Santa Ynez Av | horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm.Details
horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm. | $160,000 |
| Jun 6, 2016 | Completed final sign-off Oct 2016 | 1129 Tennessee St | kitchen alteration - remove current cabinets & appliances; replace with new cabients, appliances, tile, floor. no change in plumbing location.Details
kitchen alteration - remove current cabinets & appliances; replace with new cabients, appliances, tile, floor. no change in plumbing location. | $60,000 |