Daniel Kelly Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2016 to Aug 2026
- Last 24 months
- 4 permits filed
31 permits since 2000: 26 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 6 completed, 1 never finaled. Typically 329 days from filing to permit and 350 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2023 | Completed final sign-off Mar 2024 | 3065 Market St | remove/ replace (e) dry rout damaged non conforming rear 2-story staircase which provide access to (e) wood deck. new 1hr fire wall. ref to 202211035855Details
remove/ replace (e) dry rout damaged non conforming rear 2-story staircase which provide access to (e) wood deck. new 1hr fire wall. ref to 202211035855 | $7,500 |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 3065 Market St | partil foundation replacement (4) 8ft sections on each corner of building approx. 32ft. lateral strengthening at basement level. demo/rebuild+30sf expansion of 1st floor/lower level deck. remove and replace rear siding.Details
partil foundation replacement (4) 8ft sections on each corner of building approx. 32ft. lateral strengthening at basement level. demo/rebuild+30sf expansion of 1st floor/lower level deck. remove and replace rear siding. | $30,000 |
| Dec 30, 2019 | Completed final sign-off Sep 2022 | 321 Dellbrook Av | rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck.Details
rear single story horizontal addition to an existing 2 story single family residence. remodel lower level & provide deck on top of addition in location of (e) deck. | $99,000 |
| Dec 23, 2019 | Completed final sign-off Jun 2022 | 128 04th Av | new 1 story deck & stair at rear yard.Details
new 1 story deck & stair at rear yard. | $10,000 |
| Jul 3, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening.Details
remodel (e) kitchen and 3 baths. replace selected windows at rear of building, new rear deck and stairs (less than 10ft from grade), voluntary strengthening. | $22,500 |
| Apr 17, 2018 | Completed final sign-off Feb 2020 | 129 11th Av | new rear deck & stair to replace existing.Details
new rear deck & stair to replace existing. | $10,000 |
| Apr 25, 2017 | Never finaled issued Mar 2018, no final | 153 Santa Ynez Av | horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm.Details
horizontal addition.fill litewell to expand kitchen.divide garage to create sep living space,create living rm,bedrm&laundry&bath in lower level garage.expand lower level below cantilevered bedrm&deck.create stair to access space in lower level.reconf bathrm,bedrm,mstr bedrm. | $160,000 |