Daniel Ehrmann
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2018
- Last 24 months
- 0 permits filed
59 permits since 2000: 46 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 90 days from filing to permit and 391 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2011 | Completed final sign-off Nov 2014 | 65 05th Av | infill under (e)level 2 deck &@southwest corner of bldg. lower floor in the rear of bldg @level 1, new doors & windows, raise ceiling @level 1 entry,new exterior stair fr level 2 deck to rear yard,new interior stair fr level 2 to level 1,partial removal of level 2 deck,new planted roof,new skylight.Details
infill under (e)level 2 deck &@southwest corner of bldg. lower floor in the rear of bldg @level 1, new doors & windows, raise ceiling @level 1 entry,new exterior stair fr level 2 deck to rear yard,new interior stair fr level 2 to level 1,partial removal of level 2 deck,new planted roof,new skylight. | $300,000 |
| Aug 2, 2011 | Completed final sign-off Feb 2013 | 62 05th Av | removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interiorDetails
removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interior | $400,000 |
| Nov 7, 2007 | Completed final sign-off Dec 2008 | 783 35th Av | remove existing posts and beans in the basement. replace with new steel beams and column. remodel laundry and bathroom. remove existing stair to the garage and install new stair connecting the upper level to the basement. remodel kitchen on upper level (including cabinets, sink, stove and counteDetails
remove existing posts and beans in the basement. replace with new steel beams and column. remodel laundry and bathroom. remove existing stair to the garage and install new stair connecting the upper level to the basement. remodel kitchen on upper level (including cabinets, sink, stove and counte | $125,000 |
| Oct 5, 2006 | Completed final sign-off Nov 2006 | 188 Downey St | removal of rot on stairway & front stoop, build new railing to code, rebuild steps, reguild stoop as needed, waterproof stoop. repair in same location, under 50%, replace handrail w/code aprovad dimensions.Details
removal of rot on stairway & front stoop, build new railing to code, rebuild steps, reguild stoop as needed, waterproof stoop. repair in same location, under 50%, replace handrail w/code aprovad dimensions. | $5,000 |