Daniel Ehrmann
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to May 2018
- Last 24 months
- 0 permits filed
59 permits since 2000: 46 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 86 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2011 | Completed final sign-off Nov 2014 | 65 05th Av | infill under (e)level 2 deck &@southwest corner of bldg. lower floor in the rear of bldg @level 1, new doors & windows, raise ceiling @level 1 entry,new exterior stair fr level 2 deck to rear yard,new interior stair fr level 2 to level 1,partial removal of level 2 deck,new planted roof,new skylight.Details
infill under (e)level 2 deck &@southwest corner of bldg. lower floor in the rear of bldg @level 1, new doors & windows, raise ceiling @level 1 entry,new exterior stair fr level 2 deck to rear yard,new interior stair fr level 2 to level 1,partial removal of level 2 deck,new planted roof,new skylight. | $300,000 |
| Aug 2, 2011 | Completed final sign-off Feb 2013 | 62 05th Av | removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interiorDetails
removal of (e) 1960's addition & deck to 1904 structure. new addition & wood deck @ rear of house. front (street) elevation to have minor improvements to 9e) entry stair & porch. new driveway planers & driveway (concrete). new cedar shingles (natural finish) to replace painted wood siding. interior | $400,000 |
| Sep 14, 2006 | Completed final sign-off Oct 2006 | 874 Faxon Av | replace concrete slab on deck w/brick. 100 sq ft of dry rot & stucco repairs. replacement of floor deck at front porch (remove concrete slab, waterproof, place morter bed & brick to comply with 2006744494.Details
replace concrete slab on deck w/brick. 100 sq ft of dry rot & stucco repairs. replacement of floor deck at front porch (remove concrete slab, waterproof, place morter bed & brick to comply with 2006744494. | $7,000 |
| Mar 28, 2003 | Completed final sign-off Feb 2004 | 76 Shore View Av | kitchen,family&bathroom remodel at 1st&2nd floor.misc improv & new 16" deck at rear yard.Details
kitchen,family&bathroom remodel at 1st&2nd floor.misc improv & new 16" deck at rear yard. | $100,000 |