Back to kitchen remodel contractors
Daly Builders Group
- Based in
- Alameda
- On San Francisco permits
- Jun 2009 to Aug 2022
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 2 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2012 | Completed final sign-off Aug 2013 | 440 Dellbrook Av | bathroom: replace existing vanity, toilet, bathtub, tiles. kitchen: replace existing cabinets, appliances, tiles, countertop, lights.Details
bathroom: replace existing vanity, toilet, bathtub, tiles. kitchen: replace existing cabinets, appliances, tiles, countertop, lights. | $14,000 |
| Oct 3, 2011 | Completed final sign-off Dec 2011 | 6420 Fulton St | interior kitchen remodel. new cabinets, new appliances, new flooring , replace existing windows, elec, and plumbing as neededDetails
interior kitchen remodel. new cabinets, new appliances, new flooring , replace existing windows, elec, and plumbing as needed | $27,000 |