Back to bathroom remodel contractors
Daly Builders Group
- Based in
- Alameda
- On San Francisco permits
- Jun 2009 to Aug 2022
- Last 24 months
- 0 permits filed
20 permits since 2000: 16 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 15 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2020 | Completed final sign-off Sep 2021 | 778 07th Av | add total of 3 new full bathrooms. one bathroom for each unit. total 3 units.Details
add total of 3 new full bathrooms. one bathroom for each unit. total 3 units. | $40,000 |
| May 1, 2019 | Completed final sign-off Jun 2023 | 3169 Sacramento St | inteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath.Details
inteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath. | $40,000 |
| Jun 4, 2014 | Completed final sign-off Apr 2015 | 257 Country Club Dr | remodel gr fl to have 2 bedrooms, 1 full bath, and family room. new faus, water heater and laundry. 2nd fl convert existing bathroom, closet areas into 2 full baths.Details
remodel gr fl to have 2 bedrooms, 1 full bath, and family room. new faus, water heater and laundry. 2nd fl convert existing bathroom, closet areas into 2 full baths. | $48,000 |
| Aug 8, 2013 | Completed final sign-off Dec 2013 | 440 Dellbrook Av | basement and garage remodeling:adding one bedroom and one bathroom. total conversion < 450 sq ft.Details
basement and garage remodeling:adding one bedroom and one bathroom. total conversion < 450 sq ft. | $24,000 |
| Aug 17, 2012 | Completed final sign-off Aug 2013 | 440 Dellbrook Av | bathroom: replace existing vanity, toilet, bathtub, tiles. kitchen: replace existing cabinets, appliances, tiles, countertop, lights.Details
bathroom: replace existing vanity, toilet, bathtub, tiles. kitchen: replace existing cabinets, appliances, tiles, countertop, lights. | $14,000 |