Back to kitchen remodel contractors
Dacora
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 17 permits filed
120 permits since 2000: 62 completed, 11 in progress, 21 never finaled, 26 expired or cancelled.
Of the 21 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
35 kitchen remodel permits: 20 completed, 6 in progress, 2 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 1750 Washington St | unit #9: bathroom and kitchen, bedroom remodel in kind. update plumbing and electrical throughout apartment to code. remove plaster from walls throuhgout. install new insulation, sheetrock (5/8" gyp-x), prime, & paint throughout. install new flooring.Details
unit #9: bathroom and kitchen, bedroom remodel in kind. update plumbing and electrical throughout apartment to code. remove plaster from walls throuhgout. install new insulation, sheetrock (5/8" gyp-x), prime, & paint throughout. install new flooring. | $40,000 |
| Feb 10, 2026 | Completed final sign-off Jul 2026 | 4935 Anza St | unit 5: remodelkitchen in kind. remodel bathroom in kind. upgrade electrical throughout the apartment. new insulation, sheetrock, painting & flooring throughout the apartment. no wall alteration.Details
unit 5: remodelkitchen in kind. remodel bathroom in kind. upgrade electrical throughout the apartment. new insulation, sheetrock, painting & flooring throughout the apartment. no wall alteration. | $45,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 1750 Washington St | unit 3 on 2/f: remodel existing restroom wall and new closet for bedroom. kitchen remodel. window replacement like to like.Details
unit 3 on 2/f: remodel existing restroom wall and new closet for bedroom. kitchen remodel. window replacement like to like. | $40,000 |
| Oct 9, 2025 | Completed final sign-off Feb 2026 | 1750 Washington St | unit 8: remodel kitchen in-kind. remodel bathroom in-kind. update all electrical. update all plumbing. remove plaster, install insulation, sheetrock - tyrex 5/8" min. prime and paint.Details
unit 8: remodel kitchen in-kind. remodel bathroom in-kind. update all electrical. update all plumbing. remove plaster, install insulation, sheetrock - tyrex 5/8" min. prime and paint. | $75,000 |
| Jul 1, 2025 | Completed final sign-off Jan 2026 | 3344 Anza St | remodel (1) bathroom, update electrical, plumbing, new tile, new fixtures. remodel kitchen, demo existing, remove sheetrock, update electrical and plumbing, new cabinets appliances, fixtures. no change of layoutDetails
remodel (1) bathroom, update electrical, plumbing, new tile, new fixtures. remodel kitchen, demo existing, remove sheetrock, update electrical and plumbing, new cabinets appliances, fixtures. no change of layout | $30,000 |
| May 29, 2025 | In progress issued Jun 2025 | 1750 Washington St | unit 1 & 7: revision to 202412116630. unit 1 renew e) restroom wall & new closet for office. unit 7 remodel e) restroom wall & new closet for office. both units kitchen relocation. (no exterior work)Details
unit 1 & 7: revision to 202412116630. unit 1 renew e) restroom wall & new closet for office. unit 7 remodel e) restroom wall & new closet for office. both units kitchen relocation. (no exterior work) | $8,000 |
| Apr 2, 2025 | Completed final sign-off Jul 2025 | 1750 Washington St | construction revision pa# 2024-2025-5937 ref 202503283308: relocate unit 10 and 12 kitchen to living room. (n) office at (e) kitchen. no change to fixture count.Details
construction revision pa# 2024-2025-5937 ref 202503283308: relocate unit 10 and 12 kitchen to living room. (n) office at (e) kitchen. no change to fixture count. | |
| Dec 11, 2024 | In progress issued Dec 2024 | 1750 Washington St | units #1 & #7: remove plaster, update electrical, update plumbing, remodel kitchen x2, remodel bathroom x2, install insulation, install sheetrock, replace flooring, prime and repaintDetails
units #1 & #7: remove plaster, update electrical, update plumbing, remodel kitchen x2, remodel bathroom x2, install insulation, install sheetrock, replace flooring, prime and repaint | $99,000 |
| Sep 10, 2024 | In progress issued Sep 2024 | 4935 Anza St | units 3 & 6: upgrade (e) electrical and plumbing including 2 kitchens & 2 bathrooms. install insulation & sheetrock. install flooring, prime and paint units.Details
units 3 & 6: upgrade (e) electrical and plumbing including 2 kitchens & 2 bathrooms. install insulation & sheetrock. install flooring, prime and paint units. | $95,000 |
| Aug 15, 2024 | In progress issued Aug 2024 | 4935 Anza St | unit 2 & 4: upgrade elect. service in 2 apts (#2 and 4), upgrade plumbing, remodel both kitchens and baths, remove wall surface of exterior wall, install insulation, and replace with sheetrock, remove and replace flooring, prime and paint, no wall demolition or construction.Details
unit 2 & 4: upgrade elect. service in 2 apts (#2 and 4), upgrade plumbing, remodel both kitchens and baths, remove wall surface of exterior wall, install insulation, and replace with sheetrock, remove and replace flooring, prime and paint, no wall demolition or construction. | $100,000 |
| Feb 22, 2024 | Completed final sign-off Oct 2024 | 818 28th Av | kitchen remodel, new plumbing, new electrical, sheetrock , painting, new cabinets and countertop, new floorDetails
kitchen remodel, new plumbing, new electrical, sheetrock , painting, new cabinets and countertop, new floor | $65,000 |
| Nov 20, 2020 | Never finaled issued Feb 2021, no final | 634 19th Av | revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd.Details
revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd. | $45,000 |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 634 19th Av | remodel kitchen(~150 sqft) on 1st fl: cabinets,tile, fixtures; remodel full(~50 sqft) &1/2 baths (~25 sqft) on 1st floor: tile, fixtures; install new led recess lights & upgrade outlets, cable tv on entire 1st floor; install insulation, sheetrock, paint, & flooring. all work in kind.Details
remodel kitchen(~150 sqft) on 1st fl: cabinets,tile, fixtures; remodel full(~50 sqft) &1/2 baths (~25 sqft) on 1st floor: tile, fixtures; install new led recess lights & upgrade outlets, cable tv on entire 1st floor; install insulation, sheetrock, paint, & flooring. all work in kind. | $100,000 |
| Jul 23, 2018 | Completed final sign-off Feb 2021 | 886 28th Av | interior remoel of (e) bathroom, bedroom & reconfig to create family room. remodel (e) laundry on 1/f; keep 2-car garage. remodel (e) kitchen, bathroom, add new bathroom & powder room on 2/f. remodel (e) master bathroom & walkin closet on 3/f. no envelope change.Details
interior remoel of (e) bathroom, bedroom & reconfig to create family room. remodel (e) laundry on 1/f; keep 2-car garage. remodel (e) kitchen, bathroom, add new bathroom & powder room on 2/f. remodel (e) master bathroom & walkin closet on 3/f. no envelope change. | $80,000 |
| Aug 4, 2014 | Completed final sign-off Oct 2014 | 1701 Yosemite Av | paint, repair flooring in kitchen and bath, repair some sheet metal in kitchen. replace refrigerator. new ada entrance door including non rated partition occupancy load not to exceed 49/b. no change in occupancy type.Details
paint, repair flooring in kitchen and bath, repair some sheet metal in kitchen. replace refrigerator. new ada entrance door including non rated partition occupancy load not to exceed 49/b. no change in occupancy type. | $4,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 49 Robblee Av | remodel of kitchen and bath room, new cabinet tile floor, painting, electtrical and plumbing.Details
remodel of kitchen and bath room, new cabinet tile floor, painting, electtrical and plumbing. | $20,000 |
| Jul 19, 2013 | Expired or cancelled expired Oct 2024 | 4583 Mission St | unit 1 & 2 - demolish (e) 2 bathrooms & 2 kitchens, upgrade plumbing & electrical. install/replace water heater, install new kitchen cabinets, floor, bathroom tiles. paint both apartments. no walls moved or addedDetails
unit 1 & 2 - demolish (e) 2 bathrooms & 2 kitchens, upgrade plumbing & electrical. install/replace water heater, install new kitchen cabinets, floor, bathroom tiles. paint both apartments. no walls moved or added | $40,000 |
| Mar 7, 2013 | Expired or cancelled withdrawn Nov 2015 | 2950 Anza St | interior alterations only. (n) 1/2 bath & same @ ground fl, kitchen powder & laundry changes @ 2nd fl. 2 (n) baths, master bedrm & closets @ 3rd fl. (n) spiral stair & closet @ 4th fl. no increase in height or bulk.Details
interior alterations only. (n) 1/2 bath & same @ ground fl, kitchen powder & laundry changes @ 2nd fl. 2 (n) baths, master bedrm & closets @ 3rd fl. (n) spiral stair & closet @ 4th fl. no increase in height or bulk. | $25,000 |
| Feb 19, 2013 | Completed final sign-off Nov 2016 | 474 21st Av | remodel 2 kitchens by removing old cabinets, upgrading plumbing and electrical sheetrock and install new cabinets and laundry, no change on wallsDetails
remodel 2 kitchens by removing old cabinets, upgrading plumbing and electrical sheetrock and install new cabinets and laundry, no change on walls | $20,000 |
| May 26, 2010 | Completed final sign-off Mar 2011 | 2615 Scott St | remodeling kitchen new plumbing electric new cabinet, countertop. remodel 3 bathroom. new tile and paintingDetails
remodeling kitchen new plumbing electric new cabinet, countertop. remodel 3 bathroom. new tile and painting | $80,000 |
| Nov 16, 2009 | Expired or cancelled expired Mar 2011 | 366 20th Av | remodel an existing 2 units: kitchens, bathrooms, new plumbing & electrical, new insulation & sheetrock, painting, new floor, fireplace x2. property line walls install 5/8 sheetrock. remove sheetrock in bedroom 6 install new insulation.Details
remodel an existing 2 units: kitchens, bathrooms, new plumbing & electrical, new insulation & sheetrock, painting, new floor, fireplace x2. property line walls install 5/8 sheetrock. remove sheetrock in bedroom 6 install new insulation. | $70,000 |
| Sep 10, 2008 | Completed final sign-off Feb 2009 | 1573 15th Av | install pocket door in kitchen, remove bearing wall, install new support beams and posts in the kitchen. revision to renewal permit application 2008 06 24 5210 to original permit application 2007 06 06 3161.Details
install pocket door in kitchen, remove bearing wall, install new support beams and posts in the kitchen. revision to renewal permit application 2008 06 24 5210 to original permit application 2007 06 06 3161. | $1,500 |
| Aug 13, 2008 | Completed final sign-off Nov 2009 | 3342 Anza St | work @ unit# 3348 only. replace plaster with sheetrock. insulation r-13 min. kitchen & bathroom remodel. painting.Details
work @ unit# 3348 only. replace plaster with sheetrock. insulation r-13 min. kitchen & bathroom remodel. painting. | $35,000 |
| May 20, 2008 | Completed final sign-off Aug 2008 | 2 15th Av | work @ (4 - 15th avenue) only. kitchen remodel. new electrical. new plumbing. cabinet, counter top & floor & painting. 2 bathroom remodel. tile floor.Details
work @ (4 - 15th avenue) only. kitchen remodel. new electrical. new plumbing. cabinet, counter top & floor & painting. 2 bathroom remodel. tile floor. | $45,000 |
| Dec 24, 2007 | Completed final sign-off Mar 2008 | 2455 30th Av | kitchen remodeling new electrical, new plumbing, new cabinet counter top, floor. painting. no structural work 50% incadescent max.Details
kitchen remodeling new electrical, new plumbing, new cabinet counter top, floor. painting. no structural work 50% incadescent max. | $12,000 |
| Sep 5, 2007 | Completed final sign-off Nov 2008 | 3104 Buchanan St | upgrade electrical & plumbing, kitchen and bathroom remodeling and master bedroom, new cabinets, floors, finishing materials & appliances. new sheetrock wall/ceiling, insulation & paintingDetails
upgrade electrical & plumbing, kitchen and bathroom remodeling and master bedroom, new cabinets, floors, finishing materials & appliances. new sheetrock wall/ceiling, insulation & painting | $52,000 |
| Apr 2, 2007 | Expired or cancelled expired Oct 2008 | 822 28th Av | replace in kind skylight, 1 in bath, 1 in kitchen in existing location. min ufactor 062Details
replace in kind skylight, 1 in bath, 1 in kitchen in existing location. min ufactor 062 | $1,200 |
| Sep 26, 2006 | Completed final sign-off Jun 2007 | 2435 Lake St | remodel kitchen + 2 bathrooms. new electrical + plumbing, cabinets, sheetrock, countertops, floors + painting.Details
remodel kitchen + 2 bathrooms. new electrical + plumbing, cabinets, sheetrock, countertops, floors + painting. | $35,000 |
| Sep 21, 2006 | Expired or cancelled expired Oct 2008 | 822 28th Av | remodel kitchen + bath new electric, plumbing, cbinet, sheetrock countertop, painting. no structural work. lighting kitchen 1/2 wattage fluorescent bathroom 100% fluorescent or detector.Details
remodel kitchen + bath new electric, plumbing, cbinet, sheetrock countertop, painting. no structural work. lighting kitchen 1/2 wattage fluorescent bathroom 100% fluorescent or detector. | $30,000 |
| Jul 25, 2006 | Expired or cancelled expired Aug 2008 | 2711 Hyde St | unit #3-replace 15 windows, wood window to wood in kind. remodeling 1 kitchen, new plumbing & electrical. new sheetrock, cabinet, floor tile & paint.Details
unit #3-replace 15 windows, wood window to wood in kind. remodeling 1 kitchen, new plumbing & electrical. new sheetrock, cabinet, floor tile & paint. | $20,000 |
| Dec 9, 2005 | Completed final sign-off Jun 2006 | 814 28th Av | kitchen remodel - new cabinets, tile floor, countertop, sheetrock, painting, flourescent lightingDetails
kitchen remodel - new cabinets, tile floor, countertop, sheetrock, painting, flourescent lighting | $18,000 |
| Nov 14, 2005 | Completed final sign-off Mar 2006 | 1100 Dolores St | (unit 1100 only) remodel kitchen, new cabinet electrical and plumbing work in unit 1100 onlyDetails
(unit 1100 only) remodel kitchen, new cabinet electrical and plumbing work in unit 1100 only | $15,000 |
| Jun 22, 2004 | Completed final sign-off Nov 2004 | 2225 Pine St | remodel kitchen, bath, paint,carpet, tile in unit #109.Details
remodel kitchen, bath, paint,carpet, tile in unit #109. | $10,000 |
| Apr 15, 2002 | Completed final sign-off Jun 2002 | 423 10th Av | kitchen remodel- install new cabinets, floor & appliances. no structural work.Details
kitchen remodel- install new cabinets, floor & appliances. no structural work. | $10,000 |
| Nov 6, 2001 | Expired or cancelled expired May 2002 | 1938 Union St | complete studio remodeling-no structurala work, new kitchen & bathroom, new electrical, plumbingDetails
complete studio remodeling-no structurala work, new kitchen & bathroom, new electrical, plumbing | $10,000 |