Back to bathroom remodel contractors
Dacora
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jun 2026
- Last 24 months
- 17 permits filed
120 permits since 2000: 62 completed, 11 in progress, 21 never finaled, 26 expired or cancelled.
Of the 21 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
43 bathroom remodel permits: 22 completed, 5 in progress, 7 never finaled, 9 expired or cancelled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2026 | In progress issued Jun 2026 | 1750 Washington St | unit #9: bathroom and kitchen, bedroom remodel in kind. update plumbing and electrical throughout apartment to code. remove plaster from walls throuhgout. install new insulation, sheetrock (5/8" gyp-x), prime, & paint throughout. install new flooring.Details
unit #9: bathroom and kitchen, bedroom remodel in kind. update plumbing and electrical throughout apartment to code. remove plaster from walls throuhgout. install new insulation, sheetrock (5/8" gyp-x), prime, & paint throughout. install new flooring. | $40,000 |
| Feb 10, 2026 | Completed final sign-off Jul 2026 | 4935 Anza St | unit 5: remodelkitchen in kind. remodel bathroom in kind. upgrade electrical throughout the apartment. new insulation, sheetrock, painting & flooring throughout the apartment. no wall alteration.Details
unit 5: remodelkitchen in kind. remodel bathroom in kind. upgrade electrical throughout the apartment. new insulation, sheetrock, painting & flooring throughout the apartment. no wall alteration. | $45,000 |
| Feb 10, 2026 | Completed final sign-off Aug 2026 | 658 30th Av | remodel master bedroom, master bathroom & closet. new electrical, new plumbing, new insulation, sheetrock, plumbing.Details
remodel master bedroom, master bathroom & closet. new electrical, new plumbing, new insulation, sheetrock, plumbing. | $25,000 |
| Dec 17, 2025 | In progress issued Dec 2025 | 1750 Washington St | revision to 202512010648. to correct unit number to 8 instead of 3. no change to location on plan. new wall framing as noted on plan. wall location unchanged. weindow replacement like for like in bathroom lightwell.Details
revision to 202512010648. to correct unit number to 8 instead of 3. no change to location on plan. new wall framing as noted on plan. wall location unchanged. weindow replacement like for like in bathroom lightwell. | |
| Oct 9, 2025 | Completed final sign-off Feb 2026 | 1750 Washington St | unit 8: remodel kitchen in-kind. remodel bathroom in-kind. update all electrical. update all plumbing. remove plaster, install insulation, sheetrock - tyrex 5/8" min. prime and paint.Details
unit 8: remodel kitchen in-kind. remodel bathroom in-kind. update all electrical. update all plumbing. remove plaster, install insulation, sheetrock - tyrex 5/8" min. prime and paint. | $75,000 |
| Jul 1, 2025 | Completed final sign-off Jan 2026 | 3344 Anza St | remodel (1) bathroom, update electrical, plumbing, new tile, new fixtures. remodel kitchen, demo existing, remove sheetrock, update electrical and plumbing, new cabinets appliances, fixtures. no change of layoutDetails
remodel (1) bathroom, update electrical, plumbing, new tile, new fixtures. remodel kitchen, demo existing, remove sheetrock, update electrical and plumbing, new cabinets appliances, fixtures. no change of layout | $30,000 |
| Dec 11, 2024 | In progress issued Dec 2024 | 1750 Washington St | units #1 & #7: remove plaster, update electrical, update plumbing, remodel kitchen x2, remodel bathroom x2, install insulation, install sheetrock, replace flooring, prime and repaintDetails
units #1 & #7: remove plaster, update electrical, update plumbing, remodel kitchen x2, remodel bathroom x2, install insulation, install sheetrock, replace flooring, prime and repaint | $99,000 |
| Dec 2, 2024 | Completed final sign-off Jul 2025 | 1750 Washington St | unit# 10 & 12: remove interior wall plaster, upgrade electrical and plumbing, remodel 2 kithchens & 2 bathrooms, install insulation & sheetrock in apts, install flooring, prime & paint.Details
unit# 10 & 12: remove interior wall plaster, upgrade electrical and plumbing, remodel 2 kithchens & 2 bathrooms, install insulation & sheetrock in apts, install flooring, prime & paint. | $80,000 |
| Sep 10, 2024 | In progress issued Sep 2024 | 4935 Anza St | units 3 & 6: upgrade (e) electrical and plumbing including 2 kitchens & 2 bathrooms. install insulation & sheetrock. install flooring, prime and paint units.Details
units 3 & 6: upgrade (e) electrical and plumbing including 2 kitchens & 2 bathrooms. install insulation & sheetrock. install flooring, prime and paint units. | $95,000 |
| Aug 15, 2024 | In progress issued Aug 2024 | 4935 Anza St | unit 2 & 4: upgrade elect. service in 2 apts (#2 and 4), upgrade plumbing, remodel both kitchens and baths, remove wall surface of exterior wall, install insulation, and replace with sheetrock, remove and replace flooring, prime and paint, no wall demolition or construction.Details
unit 2 & 4: upgrade elect. service in 2 apts (#2 and 4), upgrade plumbing, remodel both kitchens and baths, remove wall surface of exterior wall, install insulation, and replace with sheetrock, remove and replace flooring, prime and paint, no wall demolition or construction. | $100,000 |
| Apr 27, 2023 | Completed final sign-off Dec 2023 | 1462 Pine St | add 3 accessible bathroom and 1 regular bathroom back to back of the existing bathroomDetails
add 3 accessible bathroom and 1 regular bathroom back to back of the existing bathroom | $20,000 |
| Mar 7, 2023 | Completed final sign-off Dec 2023 | 9 Presidio Tr | remodel 2 bedrooms and one bathroom. update electrical and bring up to code- led recess lights. plumbing: replace (e) toilet, sink, shower w/ new ones. remove old plaster and install insulation and sheetrock. prime and paint.Details
remodel 2 bedrooms and one bathroom. update electrical and bring up to code- led recess lights. plumbing: replace (e) toilet, sink, shower w/ new ones. remove old plaster and install insulation and sheetrock. prime and paint. | $25,000 |
| Nov 20, 2020 | Never finaled issued Feb 2021, no final | 634 19th Av | revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd.Details
revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd. | $45,000 |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 634 19th Av | remodel kitchen(~150 sqft) on 1st fl: cabinets,tile, fixtures; remodel full(~50 sqft) &1/2 baths (~25 sqft) on 1st floor: tile, fixtures; install new led recess lights & upgrade outlets, cable tv on entire 1st floor; install insulation, sheetrock, paint, & flooring. all work in kind.Details
remodel kitchen(~150 sqft) on 1st fl: cabinets,tile, fixtures; remodel full(~50 sqft) &1/2 baths (~25 sqft) on 1st floor: tile, fixtures; install new led recess lights & upgrade outlets, cable tv on entire 1st floor; install insulation, sheetrock, paint, & flooring. all work in kind. | $100,000 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 634 19th Av | 1)remodel bathroom on the 2nd floor: new tile, fixtures, upgrade electrical & plumbing. 2) install new led recess lights and upgrade outlets, cable tv on the entire 2nd fl. 3) install new insulation, sheetrock & paint 4) install new flooring on 2nd fl. non structural workDetails
1)remodel bathroom on the 2nd floor: new tile, fixtures, upgrade electrical & plumbing. 2) install new led recess lights and upgrade outlets, cable tv on the entire 2nd fl. 3) install new insulation, sheetrock & paint 4) install new flooring on 2nd fl. non structural work | $80,000 |
| Mar 12, 2019 | Expired or cancelled withdrawn Jan 2021 | 886 28th Av | revision to 201807235286, 201808076710 to comply with nov 201803289, 201915911: change walls due to dryrot, relocate bath from south wall to north wall gr level,spiral stair from gr fl to 1st, french doors to sliding doors (2) at rear, replace front stucco, roofdeck repairDetails
revision to 201807235286, 201808076710 to comply with nov 201803289, 201915911: change walls due to dryrot, relocate bath from south wall to north wall gr level,spiral stair from gr fl to 1st, french doors to sliding doors (2) at rear, replace front stucco, roofdeck repair | $50,000 |
| Jul 23, 2018 | Completed final sign-off Feb 2021 | 886 28th Av | interior remoel of (e) bathroom, bedroom & reconfig to create family room. remodel (e) laundry on 1/f; keep 2-car garage. remodel (e) kitchen, bathroom, add new bathroom & powder room on 2/f. remodel (e) master bathroom & walkin closet on 3/f. no envelope change.Details
interior remoel of (e) bathroom, bedroom & reconfig to create family room. remodel (e) laundry on 1/f; keep 2-car garage. remodel (e) kitchen, bathroom, add new bathroom & powder room on 2/f. remodel (e) master bathroom & walkin closet on 3/f. no envelope change. | $80,000 |
| Oct 8, 2015 | Expired or cancelled expired Apr 2018 | 3124 Baker St | revision to 2014-0129-7374 and 2015-0311-0531. and additional work. interior changes to bathroom and sauna on 1st floor. relocation of stairs from playroom to family room. moving of powder room on 2nd floor (n) roof deck less than 500 sf ft (n) skylight, relocating master bedroomDetails
revision to 2014-0129-7374 and 2015-0311-0531. and additional work. interior changes to bathroom and sauna on 1st floor. relocation of stairs from playroom to family room. moving of powder room on 2nd floor (n) roof deck less than 500 sf ft (n) skylight, relocating master bedroom | $10,000 |
| Apr 21, 2015 | Never finaled issued Jul 2015, no final | 2455 30th Av | convert (e) ground flr storage space into family room, bedroom, bathroom and laundry with (e) footprint. - new windows & doors to exterior, and relocating (e) furnace & demo (e) bathroom.Details
convert (e) ground flr storage space into family room, bedroom, bathroom and laundry with (e) footprint. - new windows & doors to exterior, and relocating (e) furnace & demo (e) bathroom. | $40,000 |
| Aug 4, 2014 | Completed final sign-off Oct 2014 | 1701 Yosemite Av | paint, repair flooring in kitchen and bath, repair some sheet metal in kitchen. replace refrigerator. new ada entrance door including non rated partition occupancy load not to exceed 49/b. no change in occupancy type.Details
paint, repair flooring in kitchen and bath, repair some sheet metal in kitchen. replace refrigerator. new ada entrance door including non rated partition occupancy load not to exceed 49/b. no change in occupancy type. | $4,000 |
| Feb 18, 2014 | Completed final sign-off Jun 2014 | 49 Robblee Av | remodel of kitchen and bath room, new cabinet tile floor, painting, electtrical and plumbing.Details
remodel of kitchen and bath room, new cabinet tile floor, painting, electtrical and plumbing. | $20,000 |
| Jul 19, 2013 | Expired or cancelled expired Oct 2024 | 4583 Mission St | unit 1 & 2 - demolish (e) 2 bathrooms & 2 kitchens, upgrade plumbing & electrical. install/replace water heater, install new kitchen cabinets, floor, bathroom tiles. paint both apartments. no walls moved or addedDetails
unit 1 & 2 - demolish (e) 2 bathrooms & 2 kitchens, upgrade plumbing & electrical. install/replace water heater, install new kitchen cabinets, floor, bathroom tiles. paint both apartments. no walls moved or added | $40,000 |
| Mar 7, 2013 | Expired or cancelled withdrawn Nov 2015 | 2950 Anza St | interior alterations only. (n) 1/2 bath & same @ ground fl, kitchen powder & laundry changes @ 2nd fl. 2 (n) baths, master bedrm & closets @ 3rd fl. (n) spiral stair & closet @ 4th fl. no increase in height or bulk.Details
interior alterations only. (n) 1/2 bath & same @ ground fl, kitchen powder & laundry changes @ 2nd fl. 2 (n) baths, master bedrm & closets @ 3rd fl. (n) spiral stair & closet @ 4th fl. no increase in height or bulk. | $25,000 |
| Aug 29, 2012 | Never finaled issued Aug 2012, no final | 80 Lomita Av | remodel 2 existing bathrooms - new tile, update to code plumbing & electrical, new fixtures. add more outlet & lights @ master bedroom. no structural work.Details
remodel 2 existing bathrooms - new tile, update to code plumbing & electrical, new fixtures. add more outlet & lights @ master bedroom. no structural work. | $15,000 |
| Jun 23, 2011 | Completed final sign-off May 2012 | 140 El Camino Del Mar | remodel 3-existing bathrooms; upgrade electrical & plumbing, (n) sheetrock, tile & paint.Details
remodel 3-existing bathrooms; upgrade electrical & plumbing, (n) sheetrock, tile & paint. | $45,000 |
| May 26, 2010 | Completed final sign-off Mar 2011 | 2615 Scott St | remodeling kitchen new plumbing electric new cabinet, countertop. remodel 3 bathroom. new tile and paintingDetails
remodeling kitchen new plumbing electric new cabinet, countertop. remodel 3 bathroom. new tile and painting | $80,000 |
| Nov 16, 2009 | Expired or cancelled expired Mar 2011 | 366 20th Av | remodel an existing 2 units: kitchens, bathrooms, new plumbing & electrical, new insulation & sheetrock, painting, new floor, fireplace x2. property line walls install 5/8 sheetrock. remove sheetrock in bedroom 6 install new insulation.Details
remodel an existing 2 units: kitchens, bathrooms, new plumbing & electrical, new insulation & sheetrock, painting, new floor, fireplace x2. property line walls install 5/8 sheetrock. remove sheetrock in bedroom 6 install new insulation. | $70,000 |
| Mar 3, 2009 | Completed final sign-off Nov 2009 | 3342 Anza St | unit 3342 only - bathroom remodeling - remove plaster from room walls & install sheetrock, painting.Details
unit 3342 only - bathroom remodeling - remove plaster from room walls & install sheetrock, painting. | $30,000 |
| Mar 3, 2009 | Completed final sign-off Nov 2009 | 3346 Anza St | unit 3346 only - bathroom remodeling - remove all plaster from room walls & install new sheetrock, painting.Details
unit 3346 only - bathroom remodeling - remove all plaster from room walls & install new sheetrock, painting. | $30,000 |
| Aug 13, 2008 | Completed final sign-off Nov 2009 | 3342 Anza St | work @ unit# 3348 only. replace plaster with sheetrock. insulation r-13 min. kitchen & bathroom remodel. painting.Details
work @ unit# 3348 only. replace plaster with sheetrock. insulation r-13 min. kitchen & bathroom remodel. painting. | $35,000 |
| May 20, 2008 | Completed final sign-off Aug 2008 | 2 15th Av | work @ (4 - 15th avenue) only. kitchen remodel. new electrical. new plumbing. cabinet, counter top & floor & painting. 2 bathroom remodel. tile floor.Details
work @ (4 - 15th avenue) only. kitchen remodel. new electrical. new plumbing. cabinet, counter top & floor & painting. 2 bathroom remodel. tile floor. | $45,000 |
| Sep 5, 2007 | Completed final sign-off Nov 2008 | 3104 Buchanan St | upgrade electrical & plumbing, kitchen and bathroom remodeling and master bedroom, new cabinets, floors, finishing materials & appliances. new sheetrock wall/ceiling, insulation & paintingDetails
upgrade electrical & plumbing, kitchen and bathroom remodeling and master bedroom, new cabinets, floors, finishing materials & appliances. new sheetrock wall/ceiling, insulation & painting | $52,000 |
| Apr 2, 2007 | Expired or cancelled expired Oct 2008 | 822 28th Av | replace in kind skylight, 1 in bath, 1 in kitchen in existing location. min ufactor 062Details
replace in kind skylight, 1 in bath, 1 in kitchen in existing location. min ufactor 062 | $1,200 |
| Sep 26, 2006 | Completed final sign-off Jun 2007 | 2435 Lake St | remodel kitchen + 2 bathrooms. new electrical + plumbing, cabinets, sheetrock, countertops, floors + painting.Details
remodel kitchen + 2 bathrooms. new electrical + plumbing, cabinets, sheetrock, countertops, floors + painting. | $35,000 |
| Sep 21, 2006 | Expired or cancelled expired Oct 2008 | 822 28th Av | remodel kitchen + bath new electric, plumbing, cbinet, sheetrock countertop, painting. no structural work. lighting kitchen 1/2 wattage fluorescent bathroom 100% fluorescent or detector.Details
remodel kitchen + bath new electric, plumbing, cbinet, sheetrock countertop, painting. no structural work. lighting kitchen 1/2 wattage fluorescent bathroom 100% fluorescent or detector. | $30,000 |
| Dec 6, 2005 | Never finaled issued Dec 2005, no final | 152 Lombard St | remodeling bath/new fixture, sink, toilet, tub/2 light and 2 outlets, sheet rock tile and paintingDetails
remodeling bath/new fixture, sink, toilet, tub/2 light and 2 outlets, sheet rock tile and painting | $16,000 |
| Jan 11, 2005 | Never finaled issued Jan 2005, no final | 1538 26th Av | upper level- bathroom remodeling. elec, plumb, tile, sheetrock & painting, no change in openings & lDetails
upper level- bathroom remodeling. elec, plumb, tile, sheetrock & painting, no change in openings & l | $14,000 |
| Jun 28, 2004 | Completed final sign-off Oct 2004 | 152 Lombard St | remodel 2 baths & tile & painting & countertop & shower pan & tubDetails
remodel 2 baths & tile & painting & countertop & shower pan & tub | $16,000 |
| Jun 22, 2004 | Completed final sign-off Nov 2004 | 2225 Pine St | remodel kitchen, bath, paint,carpet, tile in unit #109.Details
remodel kitchen, bath, paint,carpet, tile in unit #109. | $10,000 |
| Nov 6, 2001 | Expired or cancelled expired May 2002 | 1938 Union St | complete studio remodeling-no structurala work, new kitchen & bathroom, new electrical, plumbingDetails
complete studio remodeling-no structurala work, new kitchen & bathroom, new electrical, plumbing | $10,000 |
| Jul 20, 2001 | Completed final sign-off Jan 2002 | 854 32nd Av | remodel 2 bathroom new electrical new plumbing new fixtures new cabinets,tile or marble no structuraDetails
remodel 2 bathroom new electrical new plumbing new fixtures new cabinets,tile or marble no structura | $18,000 |
| Sep 11, 2000 | Expired or cancelled expired Mar 2001 | 1495 28th Av | remodel bathrooms,toilet,sheetrock tile,elec,plbg,painting in 2nd floor.Details
remodel bathrooms,toilet,sheetrock tile,elec,plbg,painting in 2nd floor. | $7,000 |
| Jan 20, 2000 | Completed final sign-off May 2000 | 484 Day St | replace bath tile fixture,floor,plbg,elec,windowsDetails
replace bath tile fixture,floor,plbg,elec,windows |