Back to bathroom remodel contractors
D N S Construction
- Based in
- Burlingame
- On San Francisco permits
- Sep 2004 to Aug 2023
- Last 24 months
- 0 permits filed
48 permits since 2000: 36 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 18 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2023 | Never finaled filed Aug 2023, never issued | 124 Noriega St | remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway.Details
remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway. | $195,000 |
| Sep 2, 2022 | Completed final sign-off Dec 2022 | 1426 Waller St | apt #1: kitchen and bath remodel in like and kind.Details
apt #1: kitchen and bath remodel in like and kind. | $12,000 |
| Jan 4, 2022 | Completed final sign-off Feb 2023 | 1108 Tennessee St | add new apartment unit, kitchen and bath; add 2 gas heating units; raise ceiling height at breezeway; add fire sprinklers at entire ground fl in accordance with nfpa 13r under a separate permitDetails
add new apartment unit, kitchen and bath; add 2 gas heating units; raise ceiling height at breezeway; add fire sprinklers at entire ground fl in accordance with nfpa 13r under a separate permit | $103,000 |
| Apr 22, 2021 | Completed final sign-off Oct 2021 | 53 Venus St | full kitchen and bathroom remodel in kindDetails
full kitchen and bathroom remodel in kind | $7,000 |
| Jul 10, 2018 | Completed final sign-off May 2019 | 1909 Fulton St | full kitchen remodel in-like. replace drain line in kitchen. install new subpanel in same location and wiring throught. no bathroom work except new electrical fixtures.Details
full kitchen remodel in-like. replace drain line in kitchen. install new subpanel in same location and wiring throught. no bathroom work except new electrical fixtures. | $8,000 |
| Feb 13, 2018 | Completed final sign-off Mar 2018 | 211 Summit St | to comply with 201835671 for 2nd bath remodel without permits. plumbing and electrical including groundfloor wiring.Details
to comply with 201835671 for 2nd bath remodel without permits. plumbing and electrical including groundfloor wiring. | $2,200 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 782 Naples St | kitchen & bathroom remodel, adding electrical subpanel in unit, adding microwave, change all angle stops, waxing valve, bathtubDetails
kitchen & bathroom remodel, adding electrical subpanel in unit, adding microwave, change all angle stops, waxing valve, bathtub | $10,000 |
| Nov 22, 2017 | Completed final sign-off Jan 2018 | 752 Stockton St | kitchen & bathroom remodel, adding electrical subpanel in unit, adding microwave, change all angle stops, waxing valve, bathtubDetails
kitchen & bathroom remodel, adding electrical subpanel in unit, adding microwave, change all angle stops, waxing valve, bathtub | $17,500 |
| Aug 31, 2017 | Completed final sign-off Aug 2018 | 1706 12th Av | remodel kitchen and a bathroom, widen interior stairs and install 3 new skylights and a roof access.Details
remodel kitchen and a bathroom, widen interior stairs and install 3 new skylights and a roof access. | $30,000 |
| Jan 7, 2016 | Completed final sign-off May 2017 | 17 Ottawa Av | legalize basement unit per ordinance# 43-14 - a bedroom, 1 study room, 1 bathroom 1 kitchenDetails
legalize basement unit per ordinance# 43-14 - a bedroom, 1 study room, 1 bathroom 1 kitchen | $8,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 550 Buchanan St | #3- remodel apt. #3, remove closet, remodel kitchen & bathroom in kind.Details
#3- remodel apt. #3, remove closet, remodel kitchen & bathroom in kind. | $20,000 |
| Feb 24, 2015 | Completed final sign-off Mar 2015 | 643 Divisadero St | #104: kitchen & bath remodel.Details
#104: kitchen & bath remodel. | $15,000 |
| Aug 25, 2014 | Completed final sign-off Oct 2014 | 954 Geary St | #36: kitchen & bathroom remodel. (no structural work to be done). interior tenant improvement. no walls to be moved.Details
#36: kitchen & bathroom remodel. (no structural work to be done). interior tenant improvement. no walls to be moved. | $16,000 |
| Mar 4, 2014 | Completed final sign-off Apr 2014 | 720 Jones St | unit #9: remodel kitchen and bath in like and kind; compliance with ord 155-13 not rquiredDetails
unit #9: remodel kitchen and bath in like and kind; compliance with ord 155-13 not rquired | $13,000 |
| Nov 1, 2013 | Completed final sign-off Jan 2014 | 776 41st Av | apt 2. kitchen & bath remodel. upgrade all electrical and plumbing. new subpanel in unit.Details
apt 2. kitchen & bath remodel. upgrade all electrical and plumbing. new subpanel in unit. | $20,500 |
| Oct 7, 2013 | Completed final sign-off Dec 2013 | 2623 Mission St | work in unit #19: kitchen and bathroom remode. install neew sub panel in unit and install washer/dryer hook up in (e) hallway walk-in closet. led lights in kitchen/bath. connect exhaust fan to (e) duct. exhaust 3' from property line and openings. 100 sq. inch make up air for dryer.Details
work in unit #19: kitchen and bathroom remode. install neew sub panel in unit and install washer/dryer hook up in (e) hallway walk-in closet. led lights in kitchen/bath. connect exhaust fan to (e) duct. exhaust 3' from property line and openings. 100 sq. inch make up air for dryer. | $15,800 |
| Aug 19, 2013 | Completed final sign-off Nov 2014 | 1516 Larkin St | to comply with nov 201308261 kitchen & bathroom remodel in bedroom. replace existing cabinets & appliances new lighting, no structural work, replace bathroom window sashDetails
to comply with nov 201308261 kitchen & bathroom remodel in bedroom. replace existing cabinets & appliances new lighting, no structural work, replace bathroom window sash | $16,000 |
| May 30, 2013 | Completed final sign-off Jul 2013 | 2629 Mission St | unit #18: kitchen and bath remodel (like & kind).Details
unit #18: kitchen and bath remodel (like & kind). | $15,000 |
| May 8, 2013 | Completed final sign-off Jun 2013 | 650 Church St | unit 5. interior kitchen & bathroom remodel, add laundry room closet at entry foyer. kitchen lighting-min 50% of total wattage of permanent lighting=high efficacy bathroom lighting-high efficacy unless controlled by manual or occupancy sensors.Details
unit 5. interior kitchen & bathroom remodel, add laundry room closet at entry foyer. kitchen lighting-min 50% of total wattage of permanent lighting=high efficacy bathroom lighting-high efficacy unless controlled by manual or occupancy sensors. | $11,000 |
| Dec 17, 2009 | Completed final sign-off Apr 2010 | 84 02nd St | new minimart & deli- new handicap bathroom, new h/c counter, handicap entry door with (e) power door opener. new tile flooring in prep & counter area & bathroom.Details
new minimart & deli- new handicap bathroom, new h/c counter, handicap entry door with (e) power door opener. new tile flooring in prep & counter area & bathroom. | $30,000 |
| Sep 2, 2004 | Expired or cancelled expired Jun 2006 | 2174 25th Av | sosuth east bedroom wall will move 6 inches to allow for more space for an added master bathDetails
sosuth east bedroom wall will move 6 inches to allow for more space for an added master bath | $28,000 |