D N S Construction
- Based in
- Burlingame
- On San Francisco permits
- Sep 2004 to Aug 2023
- Last 24 months
- 0 permits filed
48 permits since 2000: 36 completed, 8 never finaled, 4 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 2 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2023 | Never finaled filed Aug 2023, never issued | 124 Noriega St | remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway.Details
remodel (e) lower floor family room into new master bedroom & bathroom. add new raised wood deck at rear of residence. enclose existing front entryway. | $195,000 |
| Dec 11, 2020 | Completed final sign-off Feb 2021 | 431 28th Av | replacement of main waterline, replacement of light fixture at rear deck of bldg. removal of overhang above deck and install corragated roofing above rear backyard door.Details
replacement of main waterline, replacement of light fixture at rear deck of bldg. removal of overhang above deck and install corragated roofing above rear backyard door. | $3,000 |
| Sep 20, 2016 | Completed final sign-off Mar 2017 | 315 Grand View Av | dry rot repair of 4 decks. using p-t or equivalent wood in like and kind.Details
dry rot repair of 4 decks. using p-t or equivalent wood in like and kind. | $2,500 |