Back to kitchen remodel contractors
D M Ravano Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Jul 2026
- Last 24 months
- 21 permits filed
27 permits since 2000: 22 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Aug 2026 | 70 Beachmont Dr | bathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows.Details
bathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows. | $40,000 |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 3010 Octavia St | unit #1: bathroom remodel. kitchen remodel. no walls will be removed.Details
unit #1: bathroom remodel. kitchen remodel. no walls will be removed. | $45,000 |
| Jan 3, 2024 | Completed final sign-off May 2024 | 239 Cervantes Bl | unit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work.Details
unit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work. | $25,000 |