Back to bathroom remodel contractors
D M Ravano Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Jul 2026
- Last 24 months
- 21 permits filed
27 permits since 2000: 22 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | Completed final sign-off Aug 2026 | 70 Beachmont Dr | bathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows.Details
bathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows. | $40,000 |
| Dec 23, 2025 | Completed final sign-off Mar 2026 | 455 07th Av | unit#1: bathroom remodel, replace w/d in unit existing connections, new interior doors & trim, new flooring and paint throughout.Details
unit#1: bathroom remodel, replace w/d in unit existing connections, new interior doors & trim, new flooring and paint throughout. | $12,500 |
| Sep 9, 2025 | Completed final sign-off Jan 2026 | 2651 Sacramento St | remodel existing bathroom like for like, no walls being relocated or structural work.Details
remodel existing bathroom like for like, no walls being relocated or structural work. | $15,000 |
| Nov 5, 2024 | Completed final sign-off Jan 2025 | 15 Magellan Av | rev 202403228418- change to scope of work to remove half bathroom on 2nd floor.Details
rev 202403228418- change to scope of work to remove half bathroom on 2nd floor. | |
| Jun 17, 2024 | Completed final sign-off Oct 2024 | 3010 Octavia St | unit #1: bathroom remodel. kitchen remodel. no walls will be removed.Details
unit #1: bathroom remodel. kitchen remodel. no walls will be removed. | $45,000 |
| Mar 22, 2024 | Completed final sign-off Feb 2025 | 15 Magellan Av | remodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind.Details
remodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind. | $125,000 |
| Jan 3, 2024 | Completed final sign-off May 2024 | 239 Cervantes Bl | unit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work.Details
unit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work. | $25,000 |