Permit GraphShortlistSan Francisco building permits since 2000

D M Ravano Construction

Contractor license
1090563
State license record
Based in
San Francisco
On San Francisco permits
Jan 2019 to Oct 2026
Last 24 months
20 permits filed

29 permits since 2000: 22 completed, 5 in progress, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllRoof deck 1Deck 13Stairs 3Kitchen remodel 3Bathroom remodel 7

7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 31, 2026Completed
final sign-off Aug 2026
70 Beachmont Drbathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows.
Details
Permit
202603318560
Permit issued
Mar 31, 2026
Final sign-off
Aug 6, 2026

bathroom remodel, add kitchenette and cabinets, add washer and dryer, demolish old bathroom and add (2) clarestory windows.

Open the permit page

$40,000
Dec 23, 2025Completed
final sign-off Mar 2026
455 07th Avunit#1: bathroom remodel, replace w/d in unit existing connections, new interior doors & trim, new flooring and paint throughout.
Details
Permit
202512232479
Permit issued
Dec 23, 2025
Final sign-off
Mar 4, 2026

unit#1: bathroom remodel, replace w/d in unit existing connections, new interior doors & trim, new flooring and paint throughout.

Open the permit page

$12,500
Sep 9, 2025Completed
final sign-off Jan 2026
2651 Sacramento Stremodel existing bathroom like for like, no walls being relocated or structural work.
Details
Permit
202509094845
Permit issued
Sep 9, 2025
Final sign-off
Jan 15, 2026

remodel existing bathroom like for like, no walls being relocated or structural work.

Open the permit page

$15,000
Nov 5, 2024Completed
final sign-off Jan 2025
15 Magellan Avrev 202403228418- change to scope of work to remove half bathroom on 2nd floor.
Details
Permit
202411054408
Permit issued
Nov 5, 2024
Final sign-off
Jan 27, 2025

rev 202403228418- change to scope of work to remove half bathroom on 2nd floor.

Open the permit page

Jun 17, 2024Completed
final sign-off Oct 2024
3010 Octavia Stunit #1: bathroom remodel. kitchen remodel. no walls will be removed.
Details
Permit
202406174606
Permit issued
Jun 17, 2024
Final sign-off
Oct 10, 2024

unit #1: bathroom remodel. kitchen remodel. no walls will be removed.

Open the permit page

$45,000
Mar 22, 2024Completed
final sign-off Feb 2025
15 Magellan Avremodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind.
Details
Permit
202403228418
Permit issued
Jun 11, 2024
Final sign-off
Feb 6, 2025

remodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind.

Open the permit page

$125,000
Jan 3, 2024Completed
final sign-off May 2024
239 Cervantes Blunit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work.
Details
Permit
202401033380
Permit issued
Jan 3, 2024
Final sign-off
May 8, 2024

unit# 5 1) kitchen remodel-3rd floor kitchen, new cabinets, flooring, trim and painting, existing layout to remain with no exterior work. 2) bathroom remodel 3rd floor bathroom, new vanity top, tile , toilet, and shower, existing layout to remain with no exterior work.

Open the permit page

$25,000