D & H Construction
- Based in
- Berkeley
- On San Francisco permits
- May 2001 to Sep 2026
- Last 24 months
- 13 permits filed
86 permits since 2000: 47 completed, 16 in progress, 22 never finaled, 1 expired or cancelled.
Of the 22 never-finaled permits, 2 are 3 to 5 years old, 17 are 5 to 10 years old, 3 are over 10 years old. 11 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
10 stairs permits: 2 completed, 2 in progress, 6 never finaled. Typically 142 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2025 | In progress issued Oct 2025 | 835 Turk St | ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Details
ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. | $16,000,000 |
| May 5, 2023 | In progress issued Feb 2025 | 421 Leavenworth St | priority processing-100% affordable. 47 units+community room+offices. fire restoration & voluntary seismic. grd flr reconfiguration. in-kind stair repair/replacement. window repair/replace, door replace, (n) mep,hvac,exhaust,fixtures,appliances,mobility+communication units. historic facade remain.Details
priority processing-100% affordable. 47 units+community room+offices. fire restoration & voluntary seismic. grd flr reconfiguration. in-kind stair repair/replacement. window repair/replace, door replace, (n) mep,hvac,exhaust,fixtures,appliances,mobility+communication units. historic facade remain. | $10,000,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 216 Eddy St | revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams alongDetails
revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along | |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 603 Keith St | bldg 13. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 11 apartment units including selective mechanical and electrical upgrades.Details
bldg 13. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 11 apartment units including selective mechanical and electrical upgrades. | $510,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 1 Reuel Ct | bldg 7. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades.Details
bldg 7. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades. | $425,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 55 Cashmere St | bldg 1. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 11 apartment units including selective mechanical and electrical upgrades.Details
bldg 1. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 11 apartment units including selective mechanical and electrical upgrades. | $467,500 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 65 Reuel Ct | bldg 5. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 9 apartment units including selective mechanical and electrical upgrades.Details
bldg 5. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 9 apartment units including selective mechanical and electrical upgrades. | $382,500 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 5 Cashmere St | bldg 2. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades.Details
bldg 2. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades. | $425,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 15 Reuel Ct | bldg 6. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades.Details
bldg 6. existing facade work in the form of enclosing the existing shared exterior exit stair(s). selective interior refinishing of all 10 apartment units including selective mechanical and electrical upgrades. | $425,000 |
| May 10, 2001 | Completed final sign-off Oct 2001 | 862 14th St | comply w/ nov 200011083 for 6 decks and 1 stairDetails
comply w/ nov 200011083 for 6 decks and 1 stair | $25,000 |