D C Design & Construction Services
- Based in
- San Mateo
- On San Francisco permits
- Apr 2009 to Aug 2013
- Last 24 months
- 0 permits filed
21 permits since 2000: 12 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 4 days from filing to permit and 488 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2012 | Completed final sign-off Aug 2014 | 367 17th Av | new garage @ ground floor, rebuild in-kind (e) porch & entry stairs. replace (e) stucco facade w/cedar shingles, replace all (e) aluminum windows @ facade with new wood windows. new curb cut.Details
new garage @ ground floor, rebuild in-kind (e) porch & entry stairs. replace (e) stucco facade w/cedar shingles, replace all (e) aluminum windows @ facade with new wood windows. new curb cut. | $50,000 |
| Jul 28, 2010 | Completed final sign-off Dec 2010 | 971 Filbert St | rear bldg - bathroom remodel including sink,tile,toilet,wall. replace stair from 2nd to 1st floor, foundation upgrade.Details
rear bldg - bathroom remodel including sink,tile,toilet,wall. replace stair from 2nd to 1st floor, foundation upgrade. | $57,000 |