Back to kitchen remodel contractors
D C Design & Construction Services
- Based in
- San Mateo
- On San Francisco permits
- Apr 2009 to Aug 2013
- Last 24 months
- 0 permits filed
21 permits since 2000: 12 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2013 | Completed final sign-off Sep 2014 | 40 Rosewood Dr | 2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4.Details
2 bathrooms remodel, kitchen remodel, replace sheetrock & elect. outlets panel & plumbing pipes. to comply cec 150 (k) 8 & 10; replace 4 windows all at sides of the house. u-factor max. 0.4. | $110,000 |
| Nov 15, 2012 | Expired or cancelled expired Jun 2014 | 1360 Clay St | unit #10-kitchen & bathroom remodel-replace kitchen cabinets & sink. replace bathroom shower pan & toilet. no window or door work on this permitDetails
unit #10-kitchen & bathroom remodel-replace kitchen cabinets & sink. replace bathroom shower pan & toilet. no window or door work on this permit | $12,000 |
| Oct 1, 2012 | Completed final sign-off Feb 2013 | 1746 32nd Av | 1. remodel existing kitchen, bathroom & re-wire electrical in living room, dining room at ground floor. 2. construct new family room & a full bathroom at ground floor.Details
1. remodel existing kitchen, bathroom & re-wire electrical in living room, dining room at ground floor. 2. construct new family room & a full bathroom at ground floor. | $35,000 |
| Sep 12, 2012 | Completed final sign-off Feb 2013 | 3917 18th St | remodel, 2 bathroom, change sink, tub, toilet gfi outlet. change kitchen cabinet, sink, new app, new gfi outlet. replace furnace. drywall replace in kitchen.Details
remodel, 2 bathroom, change sink, tub, toilet gfi outlet. change kitchen cabinet, sink, new app, new gfi outlet. replace furnace. drywall replace in kitchen. | $90,000 |
| Apr 27, 2012 | Never finaled issued Apr 2012, no final | 1360 Clay St | kitchen cabinets replace and new appliance, bathroom shower, toilet, vanity in units 1,7 & 9Details
kitchen cabinets replace and new appliance, bathroom shower, toilet, vanity in units 1,7 & 9 | $58,211 |
| Apr 1, 2011 | Completed final sign-off Jun 2014 | 463 Eureka St | enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck.Details
enlarge garage & add one bedrm, one & half bathroom & one family room at lower level,convert (e) bedrooms & storage rms to living room, dining rm, kitchen & one bathrm at main level, convert (e) living rm, dining room & kitchen to 3 bedrms & 2 bathrms at upper level, add railing for (n) roof deck. | $105,000 |
| Apr 21, 2009 | Completed final sign-off Jul 2009 | 284 Union St | kitchen remodel.replace cabinets and countertop ,new appliancesDetails
kitchen remodel.replace cabinets and countertop ,new appliances | $9,500 |