D C Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jul 2000 to Nov 2010
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2008 | Expired or cancelled expired Nov 2014 | 2431 24th Av | will be replace 10 windows (back & sidewonly, not front side) for vinyl window, repaints exterior for whole house. repair or replace vanity & water closet. md cabinet and than electrical heater. will be sanding floor for utility room (down stair)Details
will be replace 10 windows (back & sidewonly, not front side) for vinyl window, repaints exterior for whole house. repair or replace vanity & water closet. md cabinet and than electrical heater. will be sanding floor for utility room (down stair) | $10,800 |
| Jun 10, 2008 | Completed final sign-off Oct 2008 | 206 Monterey Bl | replace old aluminum frame window to vinyl frame window without front side totel 6 windows. replace or repair handrail for front side stair less than 50% repair in kind. remove wood shingle from exterior siding wall front and west side only. paint exterior of house. existing siding underneith shingDetails
replace old aluminum frame window to vinyl frame window without front side totel 6 windows. replace or repair handrail for front side stair less than 50% repair in kind. remove wood shingle from exterior siding wall front and west side only. paint exterior of house. existing siding underneith shing | $7,500 |
| Aug 27, 2001 | Completed final sign-off Apr 2002 | 1015 Minnesota St | repl rear deck and stair and front stairDetails
repl rear deck and stair and front stair | $9,500 |