Back to kitchen remodel contractors
D C Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jul 2000 to Nov 2010
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 4, 2006 | Completed final sign-off Dec 2006 | 1132 Rhode Island St | remodling for bathroom all as is same site (also tile work)/ amd lotcjem (cabomet. counter top, rangehood, tile work). replace 2 windows, 1 living room, kitchen) window. .67 (u-factor ).Details
remodling for bathroom all as is same site (also tile work)/ amd lotcjem (cabomet. counter top, rangehood, tile work). replace 2 windows, 1 living room, kitchen) window. .67 (u-factor ). | $17,000 |
| May 4, 2005 | Expired or cancelled expired Dec 2009 | 208 Monterey Bl | kitchen and bathroom remodeling. renew 200409224873, work never started. no change to originalDetails
kitchen and bathroom remodeling. renew 200409224873, work never started. no change to original | $15,000 |
| Feb 8, 2002 | Completed final sign-off Apr 2002 | 37 Arbor St | remodeling kitchen (replace cabinet,sink,dishwasher,ood,light fixt,flooring & repainting ceiling walDetails
remodeling kitchen (replace cabinet,sink,dishwasher,ood,light fixt,flooring & repainting ceiling wal | $14,000 |
| Oct 2, 2001 | Completed final sign-off Feb 2002 | 151 Swiss Av | remodeling kitchen replace cabinet,sink,dishwasher hood.Details
remodeling kitchen replace cabinet,sink,dishwasher hood. | $3,300 |