D A Pope Inc
- Based in
- Foster City
- On San Francisco permits
- Feb 2000 to Oct 2025
- Last 24 months
- 3 permits filed
139 permits since 2000: 120 completed, 1 in progress, 13 never finaled, 5 expired or cancelled.
Of the 13 never-finaled permits, 1 is 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 expired or cancelled. Typically 11 days from filing to permit and 241 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2021 | Completed final sign-off Dec 2022 | 1550 Bryant St | (6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep.Details
(6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep. | $1,500,000 |
| Jul 28, 2015 | Completed final sign-off Nov 2015 | 1050 Sansome St | revision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairsDetails
revision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairs | $110,000 |
| Sep 18, 2014 | Completed final sign-off Oct 2015 | 1550 Bryant St | flrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/aDetails
flrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/a | $176,000 |
| Jun 4, 2014 | Expired or cancelled expired May 2022 | 1550 Bryant St | t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13Details
t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13 | $1,000 |
| Aug 15, 2012 | Completed final sign-off May 2013 | 840 Battery St | demolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stairDetails
demolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stair | $750,000 |
| Apr 7, 2011 | Completed final sign-off Nov 2011 | 300 California St | 7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor.Details
7th floor - modification of existing full floor tenant improvement work includes demo & construction of non-egress inter-connecting stair between 7th to 8th floor. | $50,000 |