Back to kitchen remodel contractors
Cy Lo Builder
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Sep 2026
- Last 24 months
- 8 permits filed
83 permits since 2000: 72 completed, 4 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 19 completed. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2025 | Completed final sign-off Oct 2025 | 1050 North Point St | kitchen and bathroom remodel. no structural work. replace cabinets, counter, appliances, fixtures with new. same location. remove tiles in bathroom, replace fixtures, vanity toilet, new tile update existing electrical panel, new flooring.Details
kitchen and bathroom remodel. no structural work. replace cabinets, counter, appliances, fixtures with new. same location. remove tiles in bathroom, replace fixtures, vanity toilet, new tile update existing electrical panel, new flooring. | $95,000 |
| Jan 22, 2025 | Completed final sign-off Jul 2025 | 154 Lombard St | unit 59: kitchen remodel. no structural work. replace cabinets, counters, applicances w/ new. new flooring, replace e) electrical panel w/ new code compliant panel. new circuits & light as needed. new plumbing to remain in same locations. new trim as neededDetails
unit 59: kitchen remodel. no structural work. replace cabinets, counters, applicances w/ new. new flooring, replace e) electrical panel w/ new code compliant panel. new circuits & light as needed. new plumbing to remain in same locations. new trim as needed | $55,000 |
| Feb 5, 2024 | Completed final sign-off Jun 2024 | 1000 North Point St | #908:one kitchen remodel, no structural work no new walls, new electrical panel, remove cabinets and appliances, install new cabinets, countertops and appliances in same location. new flooring with sound, upgrade electrical as necessary, new recessed lighting and paintDetails
#908:one kitchen remodel, no structural work no new walls, new electrical panel, remove cabinets and appliances, install new cabinets, countertops and appliances in same location. new flooring with sound, upgrade electrical as necessary, new recessed lighting and paint | $60,000 |
| Jul 5, 2022 | Completed final sign-off Dec 2022 | 1000 North Point St | kitchen remodel. replace (e) cabinets w/ new. (n) appliances, (n) appliances to be in (e) locations, (n) countertops, (n) flooring. paint. no walls or structural removed, upgrade electrical as needed.Details
kitchen remodel. replace (e) cabinets w/ new. (n) appliances, (n) appliances to be in (e) locations, (n) countertops, (n) flooring. paint. no walls or structural removed, upgrade electrical as needed. | $25,000 |
| Sep 9, 2019 | Completed final sign-off Apr 2020 | 75 Folsom St | no structural work, all walls remain in same location . replace old kitchen and bath cabinets, with new. new countertops, appliances, fixtures, replace bathtub with showre and surround. new wood flooring carpet throughoutDetails
no structural work, all walls remain in same location . replace old kitchen and bath cabinets, with new. new countertops, appliances, fixtures, replace bathtub with showre and surround. new wood flooring carpet throughout | $75,000 |
| Jun 12, 2018 | Completed final sign-off Jul 2020 | 930 Florida St | interior work only, no structural work, remodel kitchen, bath at 1st fl. remodel ground fl to include new family /media rm. laundry, utility closet, & utility sink, new light & plug & fixturesDetails
interior work only, no structural work, remodel kitchen, bath at 1st fl. remodel ground fl to include new family /media rm. laundry, utility closet, & utility sink, new light & plug & fixtures | $150,000 |
| Jan 30, 2018 | Completed final sign-off Sep 2018 | 1050 North Point St | kitchen remodel: no sturctural wok, replace in kind. replace cabinets, coutertops, appliances, plumbing locations to remain, exisitng applainace elecrical outlets same location. bathroom remodel: replace vanity w/ new in same location.Details
kitchen remodel: no sturctural wok, replace in kind. replace cabinets, coutertops, appliances, plumbing locations to remain, exisitng applainace elecrical outlets same location. bathroom remodel: replace vanity w/ new in same location. | $45,000 |
| Nov 10, 2017 | Completed final sign-off Mar 2018 | 468 Greenwich St | kitchen and bathroom. no structural work. replace in kind. replace cabinets, countertops, appliances. plumbing ocations to remain. replace (e) appliances electrical outlets only for access behind cabinets. batghroom: replace bathtub and tub/shower control in same location. toilet toDetails
kitchen and bathroom. no structural work. replace in kind. replace cabinets, countertops, appliances. plumbing ocations to remain. replace (e) appliances electrical outlets only for access behind cabinets. batghroom: replace bathtub and tub/shower control in same location. toilet to | $45,000 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 280 Day St | kitchen remodel, no structural work. replace (e0cabinets with new,replace plumbing faucet/sink ,add electrical subpanel,new lighting outlets, new counter tops,paint new appliances,install led lighting.Details
kitchen remodel, no structural work. replace (e0cabinets with new,replace plumbing faucet/sink ,add electrical subpanel,new lighting outlets, new counter tops,paint new appliances,install led lighting. | $65,000 |
| Sep 2, 2015 | Completed final sign-off Jan 2016 | 1000 North Point St | #1801- kitchen remodel: no structural work; replace cabinets, appliances with new in same location, no rough plumbing, move existing electrical panel to approved location, upgrade electrical in kitchen to code, add lighting (50% high efficacy) mew range hood connect to (e) duct, no removal of walls.Details
#1801- kitchen remodel: no structural work; replace cabinets, appliances with new in same location, no rough plumbing, move existing electrical panel to approved location, upgrade electrical in kitchen to code, add lighting (50% high efficacy) mew range hood connect to (e) duct, no removal of walls. | $40,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 1000 North Point St | new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches.Details
new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches. | $20,000 |
| May 7, 2015 | Completed final sign-off Oct 2015 | 1000 North Point St | replace in size existing aluminum sliding glass door and existing sliding window with new aluminum insulated sliding glass door and window. replace in kind. two (e) openings, same style as original in kitchen & study room.Details
replace in size existing aluminum sliding glass door and existing sliding window with new aluminum insulated sliding glass door and window. replace in kind. two (e) openings, same style as original in kitchen & study room. | $4,000 |
| May 7, 2015 | Completed final sign-off Oct 2015 | 1000 North Point St | interior alteration in unit# 209, existing bathroom altered to two full bathrooms, remodel kitchen, closet; no structural work. all partition walls, local raised floor, and ceiling work are non-combustible.Details
interior alteration in unit# 209, existing bathroom altered to two full bathrooms, remodel kitchen, closet; no structural work. all partition walls, local raised floor, and ceiling work are non-combustible. | $130,000 |
| Nov 15, 2013 | Completed final sign-off Apr 2014 | 1000 North Point St | interior renovation of condo unit # 1602. reconfiguration of existing layout. renovation of existing kitchen, master bedroom, bathroom and living room. new bathroom at entry hall. new lighting and electrical throughoutDetails
interior renovation of condo unit # 1602. reconfiguration of existing layout. renovation of existing kitchen, master bedroom, bathroom and living room. new bathroom at entry hall. new lighting and electrical throughout | $115,500 |
| Apr 19, 2013 | Completed final sign-off Aug 2013 | 1000 North Point St | kitchen remodel, no structural work, remove & replace cabinets & appliances, rough plumbing to remain, remove drywall as necessary, instlal new lighting, outlets, countertops to code, move hydronic heating, upgrade electrical panel - electrical & heating permits will be taken separately.Details
kitchen remodel, no structural work, remove & replace cabinets & appliances, rough plumbing to remain, remove drywall as necessary, instlal new lighting, outlets, countertops to code, move hydronic heating, upgrade electrical panel - electrical & heating permits will be taken separately. | $15,000 |
| Feb 4, 2013 | Completed final sign-off Oct 2013 | 1000 North Point St | unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural.Details
unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural. | $30,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 2259 43rd Av | remodel kitchen. no structural work. remove old cabinets & appliances. install 2 sinks. install new cabinets. update insulation, plumbing & electrical, drywall & paint.Details
remodel kitchen. no structural work. remove old cabinets & appliances. install 2 sinks. install new cabinets. update insulation, plumbing & electrical, drywall & paint. | $30,000 |
| Mar 21, 2012 | Completed final sign-off Sep 2012 | 3045 Jackson St | kitchen remodel. no structural work. replace (e) cabinets, sink, appliances. upgrade electrical to code in kitchen. upgrade (e) lighting. paint, no change on walls and openings.Details
kitchen remodel. no structural work. replace (e) cabinets, sink, appliances. upgrade electrical to code in kitchen. upgrade (e) lighting. paint, no change on walls and openings. | $20,000 |
| Jul 10, 2003 | Completed final sign-off Nov 2003 | 1521 Cabrillo St | remodel kitchen, no structural work, remove ext. lath plaster, reinsulate new drywall, replace cabinDetails
remodel kitchen, no structural work, remove ext. lath plaster, reinsulate new drywall, replace cabin | $30,000 |