Back to bathroom remodel contractors
Cy Lo Builder
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Sep 2026
- Last 24 months
- 8 permits filed
83 permits since 2000: 72 completed, 4 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 20 completed, 1 in progress. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2026 | In progress filed Sep 2026, not yet issued | 75 Folsom St | unit #1404: 2 bathroom remodels: bath #1 - replacement vanity & cabinet w/ new, replace toilet. bath #2 - remove bathtub and install shower/steam unit. drain location to remain the same, new shower controls, replace (e) vanity cabinet w/ new. new lighting, outlets, exhaust fan, new tile...Details
unit #1404: 2 bathroom remodels: bath #1 - replacement vanity & cabinet w/ new, replace toilet. bath #2 - remove bathtub and install shower/steam unit. drain location to remain the same, new shower controls, replace (e) vanity cabinet w/ new. new lighting, outlets, exhaust fan, new tile... | $90,000 |
| Apr 30, 2025 | Completed final sign-off Oct 2025 | 1050 North Point St | kitchen and bathroom remodel. no structural work. replace cabinets, counter, appliances, fixtures with new. same location. remove tiles in bathroom, replace fixtures, vanity toilet, new tile update existing electrical panel, new flooring.Details
kitchen and bathroom remodel. no structural work. replace cabinets, counter, appliances, fixtures with new. same location. remove tiles in bathroom, replace fixtures, vanity toilet, new tile update existing electrical panel, new flooring. | $95,000 |
| Jul 26, 2021 | Completed final sign-off Jan 2022 | 75 Folsom St | bathroom remodel. no strutcural work. plumbing rough into remaining place. replace tub, toilet, fixtures, sink, countertop. new drywall and paint.Details
bathroom remodel. no strutcural work. plumbing rough into remaining place. replace tub, toilet, fixtures, sink, countertop. new drywall and paint. | $40,000 |
| Jul 23, 2021 | Completed final sign-off Oct 2022 | 2351 Pacific Av | bathroom remodel in-kind, comply w/150.0(k)3Details
bathroom remodel in-kind, comply w/150.0(k)3 | $35,000 |
| Sep 9, 2019 | Completed final sign-off Apr 2020 | 75 Folsom St | no structural work, all walls remain in same location . replace old kitchen and bath cabinets, with new. new countertops, appliances, fixtures, replace bathtub with showre and surround. new wood flooring carpet throughoutDetails
no structural work, all walls remain in same location . replace old kitchen and bath cabinets, with new. new countertops, appliances, fixtures, replace bathtub with showre and surround. new wood flooring carpet throughout | $75,000 |
| Jun 3, 2019 | Completed final sign-off Oct 2019 | 1333 Jones St | unit 502. non-structural work. relocate partition wall to accomodate (n) washer dryer. build (n) closet enclosure in master bedroom, install (n) bedroom door. replace w/ (n) bathroom vanity cabinets & sink. replace toilets.Details
unit 502. non-structural work. relocate partition wall to accomodate (n) washer dryer. build (n) closet enclosure in master bedroom, install (n) bedroom door. replace w/ (n) bathroom vanity cabinets & sink. replace toilets. | $50,000 |
| Jun 12, 2018 | Completed final sign-off Jul 2020 | 930 Florida St | interior work only, no structural work, remodel kitchen, bath at 1st fl. remodel ground fl to include new family /media rm. laundry, utility closet, & utility sink, new light & plug & fixturesDetails
interior work only, no structural work, remodel kitchen, bath at 1st fl. remodel ground fl to include new family /media rm. laundry, utility closet, & utility sink, new light & plug & fixtures | $150,000 |
| Jan 30, 2018 | Completed final sign-off Sep 2018 | 1050 North Point St | kitchen remodel: no sturctural wok, replace in kind. replace cabinets, coutertops, appliances, plumbing locations to remain, exisitng applainace elecrical outlets same location. bathroom remodel: replace vanity w/ new in same location.Details
kitchen remodel: no sturctural wok, replace in kind. replace cabinets, coutertops, appliances, plumbing locations to remain, exisitng applainace elecrical outlets same location. bathroom remodel: replace vanity w/ new in same location. | $45,000 |
| Nov 13, 2017 | Completed final sign-off Apr 2018 | 1000 North Point St | unit #401 - bath remodel - ceiling "popcorn" removed for the entire unit. remove & replace existing shower stall, connect new drain, new shower pan, retile shower pan & wall surround. install glass shower enclosure. patch, smooth ceiling, miscellaneous drywall repair. paint.Details
unit #401 - bath remodel - ceiling "popcorn" removed for the entire unit. remove & replace existing shower stall, connect new drain, new shower pan, retile shower pan & wall surround. install glass shower enclosure. patch, smooth ceiling, miscellaneous drywall repair. paint. | $35,500 |
| Nov 10, 2017 | Completed final sign-off Mar 2018 | 468 Greenwich St | kitchen and bathroom. no structural work. replace in kind. replace cabinets, countertops, appliances. plumbing ocations to remain. replace (e) appliances electrical outlets only for access behind cabinets. batghroom: replace bathtub and tub/shower control in same location. toilet toDetails
kitchen and bathroom. no structural work. replace in kind. replace cabinets, countertops, appliances. plumbing ocations to remain. replace (e) appliances electrical outlets only for access behind cabinets. batghroom: replace bathtub and tub/shower control in same location. toilet to | $45,000 |
| Sep 13, 2016 | Completed final sign-off Oct 2017 | 1000 North Point St | unit 1002 int. remodel: remove & reconfigure (e) int. partitions, upgrade flooring, ceiling & int partition finishes; upgrade elec & plmbg, radiant baseboards; add half bath/one toilet, one lavatory; upgrade flooring/wall finishes & light fixtrue @ common eleator lobby. no structural work.Details
unit 1002 int. remodel: remove & reconfigure (e) int. partitions, upgrade flooring, ceiling & int partition finishes; upgrade elec & plmbg, radiant baseboards; add half bath/one toilet, one lavatory; upgrade flooring/wall finishes & light fixtrue @ common eleator lobby. no structural work. | $100,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1000 North Point St | bathroom remodel, no structural work, replace toilet, vanity cabinet, sink, faucet in same location, replace (e) tub w/new tile shower, new shower control valve, tile floor/shower walls, replace (e) light w/new led light, upgrade electrical panel to new code requirements.Details
bathroom remodel, no structural work, replace toilet, vanity cabinet, sink, faucet in same location, replace (e) tub w/new tile shower, new shower control valve, tile floor/shower walls, replace (e) light w/new led light, upgrade electrical panel to new code requirements. | $30,000 |
| Feb 2, 2016 | Completed final sign-off May 2016 | 1000 North Point St | #1801: bathroom remodel: no structural work,replace bath vanity & fixtures w/ new, replace toilet,new bath tub door, new lighting fixtures at same location tile floor, install all led lights.Details
#1801: bathroom remodel: no structural work,replace bath vanity & fixtures w/ new, replace toilet,new bath tub door, new lighting fixtures at same location tile floor, install all led lights. | $35,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 1000 North Point St | new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches.Details
new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches. | $20,000 |
| May 7, 2015 | Completed final sign-off Oct 2015 | 1000 North Point St | interior alteration in unit# 209, existing bathroom altered to two full bathrooms, remodel kitchen, closet; no structural work. all partition walls, local raised floor, and ceiling work are non-combustible.Details
interior alteration in unit# 209, existing bathroom altered to two full bathrooms, remodel kitchen, closet; no structural work. all partition walls, local raised floor, and ceiling work are non-combustible. | $130,000 |
| Feb 3, 2014 | Completed final sign-off Apr 2014 | 1000 North Point St | #404 - no structural work; replace (e) cabinets with (n) ; (n) drywall as necesssary. upgrade elect to code, new breaker panel. add additional lights replace appliances, replace bath fixtures, vanity & tiles ; to comply with cec150(e) 10Details
#404 - no structural work; replace (e) cabinets with (n) ; (n) drywall as necesssary. upgrade elect to code, new breaker panel. add additional lights replace appliances, replace bath fixtures, vanity & tiles ; to comply with cec150(e) 10 | $15,000 |
| Nov 15, 2013 | Completed final sign-off Apr 2014 | 1000 North Point St | interior renovation of condo unit # 1602. reconfiguration of existing layout. renovation of existing kitchen, master bedroom, bathroom and living room. new bathroom at entry hall. new lighting and electrical throughoutDetails
interior renovation of condo unit # 1602. reconfiguration of existing layout. renovation of existing kitchen, master bedroom, bathroom and living room. new bathroom at entry hall. new lighting and electrical throughout | $115,500 |
| Feb 4, 2013 | Completed final sign-off Oct 2013 | 1000 North Point St | unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural.Details
unit #807:remodel (e) kitchen and bathroom, new cabinets at living room, replace (e) interior doors, replace flooring througout. replace (e) raidaint heater at living room, scrape or replace (e0 drywall ceilings, new lighting througout. all new framing is non-structural. | $30,000 |
| Nov 10, 2009 | Completed final sign-off Mar 2010 | 2691 Green St | remodel (e) bathroom on first floor, add full bathroom on 2nd floor. add closet , reconfigure (e) closets and 2 replacement windows at front in kindDetails
remodel (e) bathroom on first floor, add full bathroom on 2nd floor. add closet , reconfigure (e) closets and 2 replacement windows at front in kind | $75,000 |
| Feb 11, 2009 | Completed final sign-off May 2009 | 10 Beaver St | work @ unit# 10 only. bathroom remodel. no structural work. replace (e) fixture. relocate toilet. new sink, new shower stall. new tile floor & walls. insulation, drywall. same size & location. new new walls. no modification to existing.Details
work @ unit# 10 only. bathroom remodel. no structural work. replace (e) fixture. relocate toilet. new sink, new shower stall. new tile floor & walls. insulation, drywall. same size & location. new new walls. no modification to existing. | $37,000 |
| Dec 10, 2008 | Completed final sign-off Mar 2009 | 1421 Vicente St | existing bathroom remodel. 6' x 8'. no structural work. partition closet. replace toilet, sink, tub, shower in existing location insulation, sheetrock, paint, tile, electric, plumbing.Details
existing bathroom remodel. 6' x 8'. no structural work. partition closet. replace toilet, sink, tub, shower in existing location insulation, sheetrock, paint, tile, electric, plumbing. | $30,000 |