Back to kitchen remodel contractors
Current Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Aug 2026
- Last 24 months
- 26 permits filed
102 permits since 2000: 55 completed, 24 in progress, 12 never finaled, 11 expired or cancelled.
Of the 12 never-finaled permits, 4 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 3 in progress. Typically 16 days from filing to permit and 325 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2026 | In progress issued Jun 2026 | 1090 Hampshire St | legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths...Details
legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths... | $275,000 |
| May 8, 2025 | In progress issued May 2025 | 32 Buena Vista Tr | interior remodel of top unit, floor 2,3 , assessor 2608/068. kitchen remodel. remodel e bathroom and primary bath. remodel e primary bedrooms. reconfigure interior walls. new windows and door per 2022 cbcDetails
interior remodel of top unit, floor 2,3 , assessor 2608/068. kitchen remodel. remodel e bathroom and primary bath. remodel e primary bedrooms. reconfigure interior walls. new windows and door per 2022 cbc | $75,000 |
| Sep 30, 2024 | In progress issued Mar 2025 | 158 Burnside Av | install new windows on the west elevation. reframe as shown. install waterproofing and stucco on west elevation. install 1 new skylight above (e) kitchen. remove and repair (e) deck (less than 50%) outside kitchen. all proposed work at rear of house.Details
install new windows on the west elevation. reframe as shown. install waterproofing and stucco on west elevation. install 1 new skylight above (e) kitchen. remove and repair (e) deck (less than 50%) outside kitchen. all proposed work at rear of house. | $100,000 |
| May 23, 2024 | Completed final sign-off Apr 2026 | 151 Merced Av | partial repair of foundation. new interior stairs. new door opening located at rear by kitchen. relocation of furnace (mechanical) convert basement into conditioned space 414 sfDetails
partial repair of foundation. new interior stairs. new door opening located at rear by kitchen. relocation of furnace (mechanical) convert basement into conditioned space 414 sf | $200,000 |
| Aug 1, 2023 | Completed final sign-off Oct 2024 | 4150 17th St | non-structrual remodel work on 1st, 2nd and 3rd floor. new flooring, paint & general lighting throughout. replacing existing pluming and appliances with in kind items cosmetic updates to kitchen & bathsDetails
non-structrual remodel work on 1st, 2nd and 3rd floor. new flooring, paint & general lighting throughout. replacing existing pluming and appliances with in kind items cosmetic updates to kitchen & baths | $350,000 |
| Mar 4, 2021 | Completed final sign-off Mar 2022 | 517 08th Av | remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures.Details
remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures. | $120,000 |
| Jun 20, 2019 | Completed final sign-off Nov 2019 | 718 San Jose Av | 2nd bathroom 40 sqft (1st kitchen and bath remodel under pa 201903044290) no structural work no change to wall layout.Details
2nd bathroom 40 sqft (1st kitchen and bath remodel under pa 201903044290) no structural work no change to wall layout. | $10,000 |
| Mar 4, 2019 | Completed final sign-off Nov 2019 | 718 San Jose Av | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $30,000 |