Back to bathroom remodel contractors
Current Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2015 to Aug 2026
- Last 24 months
- 26 permits filed
102 permits since 2000: 55 completed, 24 in progress, 12 never finaled, 11 expired or cancelled.
Of the 12 never-finaled permits, 4 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 8 completed, 3 in progress, 4 never finaled, 2 expired or cancelled. Typically 60 days from filing to permit and 293 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2026 | In progress issued Jun 2026 | 1090 Hampshire St | legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths...Details
legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths... | $275,000 |
| May 8, 2025 | In progress issued May 2025 | 32 Buena Vista Tr | interior remodel of top unit, floor 2,3 , assessor 2608/068. kitchen remodel. remodel e bathroom and primary bath. remodel e primary bedrooms. reconfigure interior walls. new windows and door per 2022 cbcDetails
interior remodel of top unit, floor 2,3 , assessor 2608/068. kitchen remodel. remodel e bathroom and primary bath. remodel e primary bedrooms. reconfigure interior walls. new windows and door per 2022 cbc | $75,000 |
| Oct 17, 2024 | Expired or cancelled expired Jun 2026 | 1417 21st Av | convert 551 sq ft of (e) garage into (n) living room, (n)study not for sleeping (n) bath as additional rooms for 1417 21st ave. create communal launry room.Details
convert 551 sq ft of (e) garage into (n) living room, (n)study not for sleeping (n) bath as additional rooms for 1417 21st ave. create communal launry room. | $90,000 |
| Nov 3, 2023 | In progress filed Nov 2023, not yet issued | 2028 14th Av | in kind bathroom remodel. replace old tiles with new tiles and repaint walls. replace bath tub and sink. replace fixtures/vanity. no structural work.Details
in kind bathroom remodel. replace old tiles with new tiles and repaint walls. replace bath tub and sink. replace fixtures/vanity. no structural work. | $5,000 |
| Sep 20, 2023 | Completed final sign-off Jan 2024 | 553 15th Av | remodel of (e) bathroom. new tile & plumbing fixtures. in-kind. 3rd floorDetails
remodel of (e) bathroom. new tile & plumbing fixtures. in-kind. 3rd floor | $30,000 |
| Aug 1, 2023 | Completed final sign-off Oct 2024 | 4150 17th St | non-structrual remodel work on 1st, 2nd and 3rd floor. new flooring, paint & general lighting throughout. replacing existing pluming and appliances with in kind items cosmetic updates to kitchen & bathsDetails
non-structrual remodel work on 1st, 2nd and 3rd floor. new flooring, paint & general lighting throughout. replacing existing pluming and appliances with in kind items cosmetic updates to kitchen & baths | $350,000 |
| May 18, 2021 | Completed final sign-off Mar 2024 | 2145 Turk Bl | renovation/addition existing 3 bd & 3 ba, 3 stories r-3. horizontal addition 1st and 2nd fl. 1st fl excavate and lower the concrete slab by 7" to create 7'2" ceiling, add 131 sf and renovate the existing bathroom. new stairs to the 2nd fl, add 271 sf and new storage area. 3rd fl no work proposedDetails
renovation/addition existing 3 bd & 3 ba, 3 stories r-3. horizontal addition 1st and 2nd fl. 1st fl excavate and lower the concrete slab by 7" to create 7'2" ceiling, add 131 sf and renovate the existing bathroom. new stairs to the 2nd fl, add 271 sf and new storage area. 3rd fl no work proposed | $119,000 |
| Mar 4, 2021 | Completed final sign-off Mar 2022 | 517 08th Av | remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures.Details
remodel interior & reconfigure (e) stairs at backyard. basement: add powder room. 1st fl: kitchen remodel. 2nd fl: 2 bathrooms remodel, upgrade finish throughout. replace all (e) windows facing street & rear in-kind. at rear add 1 fixed window & replace sliding door. (n) light fixtures. | $120,000 |
| Jan 6, 2021 | Never finaled issued Apr 2022, no final | 293 Cumberland St | structural change: foundation west wall. new relocated bath, bararea, fireplace, plumbing, electrical, hvac, general remodel throughout.Details
structural change: foundation west wall. new relocated bath, bararea, fireplace, plumbing, electrical, hvac, general remodel throughout. | $200,000 |
| Nov 19, 2020 | Expired or cancelled withdrawn Feb 2021 | 234 25th Av | revision to pa# 201912109152 - reduced scope of work. minor interior remodel. remove ground fl bathroom. full seismic upgrade at 1st fl. voluntary seismic upgrade at 2nd-3rd fl. structural repairs & foundation upgrade.Details
revision to pa# 201912109152 - reduced scope of work. minor interior remodel. remove ground fl bathroom. full seismic upgrade at 1st fl. voluntary seismic upgrade at 2nd-3rd fl. structural repairs & foundation upgrade. | $250,000 |
| Jul 17, 2020 | Never finaled issued Sep 2020, no final | 1314 Larkin St | ugrade fo existing unit. add 1/2 bath, upgrade electrical throughout. deo wall @ nook. convert office to bedrooms.Details
ugrade fo existing unit. add 1/2 bath, upgrade electrical throughout. deo wall @ nook. convert office to bedrooms. | $37,000 |
| Jun 20, 2019 | Completed final sign-off Nov 2019 | 718 San Jose Av | 2nd bathroom 40 sqft (1st kitchen and bath remodel under pa 201903044290) no structural work no change to wall layout.Details
2nd bathroom 40 sqft (1st kitchen and bath remodel under pa 201903044290) no structural work no change to wall layout. | $10,000 |
| Jun 7, 2019 | Never finaled issued Jul 2019, no final | 2023 Pacific Av | interior remodel of master suite, bathroom and new closets. remove chinmey down to 2nd fl. plate. match (e) finishes at infilled exterior wall. majority of work to be performed on the 2nd fl.Details
interior remodel of master suite, bathroom and new closets. remove chinmey down to 2nd fl. plate. match (e) finishes at infilled exterior wall. majority of work to be performed on the 2nd fl. | $50,000 |
| Mar 4, 2019 | Completed final sign-off Nov 2019 | 718 San Jose Av | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $30,000 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 1286 Guerrero St | no change of (e) floor plan. full bathroom remodel.Details
no change of (e) floor plan. full bathroom remodel. | $5,000 |
| Jun 14, 2017 | Completed final sign-off Mar 2019 | 456 Otsego Av | new family room, legalize bathroom at ground floor. voulntary seismic stregthening at ground floorDetails
new family room, legalize bathroom at ground floor. voulntary seismic stregthening at ground floor | $28,000 |
| Jul 14, 2016 | Completed final sign-off Dec 2023 | 417 Mississippi St | vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath.Details
vertical & horizontal additional, building back into yard, new front & rear facades, new decks, new interior walls, electrical & plumbing. current 3 bed, 2 bath. change to 5 bed, 4.5 bath. | $975,000 |