Block 1384, lot 012
234 25th Ave
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,140 sq ft
- Lot
- 3,798 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | In progress issued Sep 2026 | 234 25th Av | Z.I.D | revision to pa# 201906102981. replace 4 windows with new. relocate spiral stair. modify stair configuration between 3rd fl and roof. alter penthouse to conform to new stair.Details
revision to pa# 201906102981. replace 4 windows with new. relocate spiral stair. modify stair configuration between 3rd fl and roof. alter penthouse to conform to new stair. | |
| Mar 3, 2025 | In progress issued Mar 2025 | 234 25th Av | Z.I.D | recommencement and completion of work approved under 201912109152Details
recommencement and completion of work approved under 201912109152 | $100,000 |
| Nov 19, 2020 | Expired or cancelled withdrawn Feb 2021 | 234 25th Av | Current Construction | revision to pa# 201912109152 - reduced scope of work. minor interior remodel. remove ground fl bathroom. full seismic upgrade at 1st fl. voluntary seismic upgrade at 2nd-3rd fl. structural repairs & foundation upgrade.Details
revision to pa# 201912109152 - reduced scope of work. minor interior remodel. remove ground fl bathroom. full seismic upgrade at 1st fl. voluntary seismic upgrade at 2nd-3rd fl. structural repairs & foundation upgrade. | $250,000 |
| Dec 10, 2019 | Never finaled issued Feb 2020, no final | 234 25th Av | kitchen remodel at both units. structural repairs & foundation upgrade. remove 1st floor bathroom. add 2nd & 3rd floor bathroomsDetails
kitchen remodel at both units. structural repairs & foundation upgrade. remove 1st floor bathroom. add 2nd & 3rd floor bathrooms | $70,000 | |
| Jun 10, 2019 | Never finaled issued Oct 2021, no final | 234 25th Av | Z.I.D | expansion of ground floor approx 9' x 25' to the rear. replace (e) footings on ground floor. add shower to (e) ground floor bath. remove (e) 2nd egress & move to rear of building. open up walls @ kitchen area. convert (e) sunroom to exterior decks. build roof deck.Details
expansion of ground floor approx 9' x 25' to the rear. replace (e) footings on ground floor. add shower to (e) ground floor bath. remove (e) 2nd egress & move to rear of building. open up walls @ kitchen area. convert (e) sunroom to exterior decks. build roof deck. | $50,000 |
| Jan 6, 2017 | Completed final sign-off Mar 2017 | 234 25th Av | Z.I.D | to renew permit #201510149697. to comply with physical inspection cc-8001Details
to renew permit #201510149697. to comply with physical inspection cc-8001 | $8,000 |
| Apr 19, 2016 | Never finaled issued Apr 2016, no final | 236 25th Av | street space permit | ||
| Jan 4, 2016 | Never finaled issued Jan 2016, no final | 234 25th Av | street space | ||
| Oct 14, 2015 | Expired or cancelled expired Mar 2017 | 234 25th Av | Z.I.D | to comply with physical inspection cc-8001Details
to comply with physical inspection cc-8001 | $8,000 |
| Oct 14, 2015 | Completed final sign-off May 2016 | 234 25th Av | Z.I.D | to comply with item #2 of physical inspection cc-8001, replace existing windows on front and south face with double-hung aluminum-clad wood. replace remainder of windows with double-hung vinyl.Details
to comply with item #2 of physical inspection cc-8001, replace existing windows on front and south face with double-hung aluminum-clad wood. replace remainder of windows with double-hung vinyl. | $25,000 |
| Aug 20, 2015 | Completed final sign-off Aug 2015 | 234 25th Av | David Larkin Construction | to obtain final inspection for work approved under pa #200904216764. all work is complete.Details
to obtain final inspection for work approved under pa #200904216764. all work is complete. | |
| Feb 10, 2015 | Expired or cancelled withdrawn Oct 2015 | 234 25th Av | horizontal addition. 8'6" expansion of (e) 3 story, 2 family dwelling to the rear (approx 220 sq ft). existing windows to be replaced in kind & (n) windows added. 2 kitchens remodel, 3 bedrooms remodel & 2 new bathrooms.Details
horizontal addition. 8'6" expansion of (e) 3 story, 2 family dwelling to the rear (approx 220 sq ft). existing windows to be replaced in kind & (n) windows added. 2 kitchens remodel, 3 bedrooms remodel & 2 new bathrooms. | $20,000 | |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 234 25th Av | On-Site Maintenance | remove damages posts and footings , and replace with new footing, beams and posts at rear of building.Details
remove damages posts and footings , and replace with new footing, beams and posts at rear of building. | $4,300 |
| Jun 2, 2009 | Completed final sign-off Jul 2009 | 234 25th Av | Standardconstr/Standardroof | reroofing.Details
reroofing. | $9 |
| Apr 21, 2009 | Expired or cancelled expired Aug 2015 | 234 25th Av | David Larkin Construction | repair of rotted stucco mold & casing at garage door. repair like in kind with same materials.Details
repair of rotted stucco mold & casing at garage door. repair like in kind with same materials. | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Z.I.D (6), David Larkin Construction (2), Current Construction, On-Site Maintenance, Standardconstr/Standardroof
- Architects
- Erevan O'neill
- Engineers
- Erevan O'neill (3), Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.