Cumiskey Construction
- Based in
- Belmont
- On San Francisco permits
- Sep 2000 to Mar 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2008 | Never finaled issued Jul 2008, no final | 2621 Larkin St | voluntary structural strengthenin @ (e) basement, (n) curb & slab floor for storage @ unfinished basement, (n) staircase to join unfinished basement to living area @ 1st fl hall, relocate fau.Details
voluntary structural strengthenin @ (e) basement, (n) curb & slab floor for storage @ unfinished basement, (n) staircase to join unfinished basement to living area @ 1st fl hall, relocate fau. | $150,000 |
| Oct 27, 2000 | Expired or cancelled expired Feb 2001 | 50 Irving St | repair existing rear stairs less than 50% repairDetails
repair existing rear stairs less than 50% repair |