Cumiskey Construction
- Based in
- Belmont
- On San Francisco permits
- Sep 2000 to Mar 2011
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2011 | Completed final sign-off Sep 2011 | 2621 Larkin St | extend curb cut from e 10' wide to 12' wide. no impact on street parking widen driveway.Details
extend curb cut from e 10' wide to 12' wide. no impact on street parking widen driveway. | $5,000 |
| Jul 1, 2008 | Never finaled issued Jul 2008, no final | 2621 Larkin St | voluntary structural strengthenin @ (e) basement, (n) curb & slab floor for storage @ unfinished basement, (n) staircase to join unfinished basement to living area @ 1st fl hall, relocate fau.Details
voluntary structural strengthenin @ (e) basement, (n) curb & slab floor for storage @ unfinished basement, (n) staircase to join unfinished basement to living area @ 1st fl hall, relocate fau. | $150,000 |
| Jan 29, 2003 | Completed final sign-off Apr 2003 | 2586 28th Av | patch after electrical work of 20 receptacles & 5 smoke detectorsDetails
patch after electrical work of 20 receptacles & 5 smoke detectors | $2,500 |
| Oct 27, 2000 | Expired or cancelled expired Feb 2001 | 50 Irving St | repair existing rear stairs less than 50% repairDetails
repair existing rear stairs less than 50% repair | |
| Sep 29, 2000 | Completed final sign-off Apr 2002 | 405 Baker St | conversion of type 5n to type v-1 hr w/additional gwb, upgrade (e) assemblyDetails
conversion of type 5n to type v-1 hr w/additional gwb, upgrade (e) assembly | $800,000 |