Back to kitchen remodel contractors
Cp/M Company Inc.
- Based in
- Oakland
- On San Francisco permits
- Apr 2008 to Feb 2024
- Last 24 months
- 0 permits filed
26 permits since 2000: 24 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2015 | Completed final sign-off Mar 2024 | 917 Central Av | add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding.Details
add partial 4th flr. vertical addition & rear horizontal addition @ 2nd/3rd fl. interior remodel of (e) kitchen & bathrooms, legalize (e) unit @ 1st flr, widen (e) driveway. seimic upgrade, replace (e) windows with marvin wood clad, (n) ext. trim & siding. | $675,000 |
| Nov 6, 2015 | Completed final sign-off Feb 2017 | 768 44th Av | remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same.Details
remodel (e) kitchen and bathroom, appliances & fixtures, same location. all lights high efficacy and gfi circuits per nec, new cabinets. no walls moved, removed, add or infilled. all existing layouts to remain the same. | $55,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2015 | 1842 40th Av | kitchen remodel, remove e non bearing wall, all lights high effacacy, electric and plumbingDetails
kitchen remodel, remove e non bearing wall, all lights high effacacy, electric and plumbing | $50,000 |
| Oct 28, 2014 | Completed final sign-off Mar 2015 | 454 34th Av | remodel extg kitchen. relocate stove, remove non-bearing wall, new lights, cabinets, flooring. lighting & control per cec 150(k).Details
remodel extg kitchen. relocate stove, remove non-bearing wall, new lights, cabinets, flooring. lighting & control per cec 150(k). | $22,000 |
| Jul 15, 2011 | Completed final sign-off Sep 2011 | 1309 Hyde St | kitchen cabinets and countertops, new kitchen appliances, no structural work. new flourescent lights and insulation. plumbing and electrical permits by trades.Details
kitchen cabinets and countertops, new kitchen appliances, no structural work. new flourescent lights and insulation. plumbing and electrical permits by trades. | $10,000 |